• Title/Summary/Keyword: 노무관리

Search Result 218, Processing Time 0.03 seconds

Development of Safety Management System Based on Location Determination Technology for Construction Workers in Nuclear Power Plant Construction Project (무선측위 기술을 활용한 원전 건설현장 인원 안전관리 시스템 개발 방안)

  • KIM, WooJoong;Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.239-240
    • /
    • 2016
  • The nuclear power plant construction project is a large-scale project that involved a daily maximum of thousands of workers. many equipment and laborers involved has been required consistently to minimize the need for safety through real-time safety management. But current nuclear power plant construction site is only managed to access of workers and equipments. The purpose of this study is the owner requirements reflects the characteristics of the nuclear power plant construction project integrated safety management system utilizing active RFID and GPS positioning technology.

  • PDF

Strategies for developing the Appropriation Method of the Construction Quality Cost (건설공사 품질관리비용의 구성요소 및 현실화를 위한 계상방법에 대한 고찰)

  • Park, Kyeong-Geun;Park, Yun-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.101-111
    • /
    • 2011
  • Clients ought to Appropriate the cost of quality management for contractors based on Construction Technology Management Act. The costs of safety management and environment reservation are separately estimated. and the quality management cost is added up to secure the construction quality required on sites. However, the sufficient cost for quality management was not allowed to the contractors, due to the viewpoints of the clients that the quality management should be one of the duties of contractors. In addition, an Account-related legislation enacted a provision of the labor cost of quality management as the one that should be included in the indirect labor cost. From the continuous survey the quality management cost is currently estimated by 0.2% of the total project cost and the contractors protest the portion of the quality management cost is insufficient. Thus, this paper aimed to provide the bases of estimation of the actualized quality management cost considering the viewpoint of contractors.

Data Acquisition Technology (DAT) Selection Algorithm for Automated Progress Measurement and Management (진도관리 자동화를 위한 자료수집기술(DAT) 선정 방법)

  • Kang, Seung-Hee;Jung, Young-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.77-86
    • /
    • 2012
  • Progress measurement provides project participants with valuable information in terms of 'current status', 'corrective countermeasure', and 'forecast of future risks'. However, the managerial effort (or workload) required to acquire and maintain detailed progress data has been the major barrier to practical implementation. Even though recent efforts in utilizing data acquisition technologies (DATs) have actively attempted to automate the progress measurement process, previous DAT research has only been focused on limited construction tasks or selected technologies. This paper proposes a DAT selection algorithm that automatically assign an appropriate DAT for every commodity item for an entire constriction project. Five different criteria were identified and developed in order to comprehend specific requirements for automating the progress measurement of each commodity group. A case-study and also a survey from practitioners were conducted in order to validate the proposed methodology.

A Study on the Cost Estimating Method based on Spatial Unit Focused on Improving Limitation Caused by Lack of Spatial Information of the Cost Based on Work Type (공간단위 공사비 산정방법에 관한 연구 - 공종별 공사비의 공간정보 부재로 인한 한계점 개선을 중심으로 -)

  • Lee, Ki-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.131-139
    • /
    • 2011
  • In this Study, the Cost of Public Facility Construction in the VE Cost Model, and the Progress of the Construction Site Management, and Cost due to the Lack of Cpatial Information in Dispute Cost Work Type Recognize the limits of Historical Information, and to Overcome the Perception of Cost and Space Systems Unit In the Process of Transition that Began Seeking Ways to Improve Through this Study, Different Parts of the Proposed Area of Construction Work Unit System, the Core of Calculating Hourly and Detailed Engineering Information and Cost Information Generated Extension to Configure the Construction Unit in Every Space, Every Work Unit System, All Materials That Make Up Work Unit System, Unit Labor Costs, And All of the Configuration Items Enables Precise And Multidimensional Understanding is That.

A Plan for Better Productivity of Sub-Contractors through Improvements of Daily Reporting Process (작업일보 작성프로세스 개선을 통한 협력업체 생산성 향상방안에 관한 연구)

  • Kim Bong-Nyoun;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.375-378
    • /
    • 2002
  • Most construction works in a building site are progressed by many work categories and sub-contractors. Therefore there are many difficult things of management of construction-information because variable occurrences are happened to manpower and material resources. For this reason, various management systems are suggested, but the application of these systems are difficult because only construction company manages these systems and sub-contractor's participation, understanding and financial ability are insufficient. In addition to that, there are other problems such as lost information when it is carried, perversion and distrust of information by hand and lots of time and labor are necessary for collection, analysis, and management of information which are offered for daily report. so the purpose of this study is for improvement of reporting process with making an analysis of productivity effects and an analysis of function and problem of daily report. I intend to suggest the direction of improved daily report system for better productivity of construction work through input information and management of cooperation enterprises.

  • PDF

A bibliography of six foreign plant collectors (Imai, Mills, Furumi, Nomura, Saito, and Okuyama) in North Korea (한반도 북부 채집을 시도한 외국인 6명과 지명 정리: Imai, Mills, Furumi, Nomura, Saito, Okuyama)

  • Chang, Chin-Sung;Kim, Hye-Won;Kim, Hui
    • Korean Journal of Plant Taxonomy
    • /
    • v.46 no.1
    • /
    • pp.65-82
    • /
    • 2016
  • Korean Peninsula Flora Database (KPF database), developed by T.B. Lee Herbarium of Seoul National University comprises ca. 65,000 accessions of vascular plants collected from Korean peninsula from 1850 to 1945. Among these, material from North Korea (Democratic People's Republic of Korea) is represented with ca. 33,000 accessions. The largest part of this material [ca. 4287 accessions (13%) from North Korea] originates from five Japanese and one American collectors, such as Imai, Hanjiro, Mills, Ralph Garfield, Furumi, Masatomi, Nomura, Naohiko, Saito, Tatsumoto, and Okuyama, Shunki from 1909 to 1942. These data are the third largest holding (13%) of North Korean collections after Komarov, V.L and Nakai, T. A part of scientific report about the results of these expeditions had been published before, but the present publication set it sights on giving a first overview of the itineraries and the materials collected by five collectors in North Korea. Among these, Saito has by far the largest collection with 1,730 specimens, followed by five collectors in order with 1,067, 532, 510, 368 and 370 accessions by Mills, Nomura, Okuyama, Furumi, and Imai respectively.

An Algorithm for Hoisting Time Calculation in Super-tall Building Construction (건설 리프트 가감속 능력을 고려한 양중시간 산정 알고리즘 개발)

  • Cho, Chang-Yeon;Shin, Yoon-Seok;Won, Seo-Kyung;Kim, Jung-Yeol;Cho, Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.120-129
    • /
    • 2011
  • An installation of the construction lift has a few limitations by many constrains and these have influences on labor productivity, that can be changed by vertical-transportation management. In the super-tall building construction, a management of construction lift operation is one of the most important factor, but existing methodologies depend on skilled practitioners' experiences. And it is true that the expertise resulted by the experiences does not transfer to the next generation. This study is a part of lifting-management simulation development which aims at the optimal construction lift management. A proposed algorithm is focus on lifting time calculation considering an acceleration capability. This research evaluates the result accuracy using comparative analysis on simulation result and field measuring time.

A Study on Project Resource & Information Management with Internet Application(PRIMA system) (디지털 정보화를 통한 현장 자원 및 정보관리 기술에 관한 연구(PRIMA 시스템))

  • Kim Oe-Gon;Lee Dong-Ryul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.88-97
    • /
    • 2001
  • The Internet, the main issue of a new millennium, is being researched vitally for the progress of the construction industry, and the construction industry is considered to be led into a high-value added state-of-arts technology industry through CALS. Even if many construction companies gradually widen the use of the Internet for various purposes such as an electronic bidding system and an e-commerce system, the companies are still demanded to use the Internet more broadly and practically. Hence, the need for a tool for fast decision making and an effective construction management has risen. The PRIMA system has been developed specifically focused on meeting with those recent changes of the construction industry. This system is composed of three parts. Those are Just In Time(JIT) management, integrated application of man power${\cdot}$safety${\cdot}$work management and decision making process based on real-time information in the Internet. The usefulness of the PRIMA system has already been proved in a super-scale construction project. As the Internet environment get improved the use of the tool will be spread out gradually for many construction projects, regardless their size and location.

  • PDF

FOI and Government Records Management Reforms under Obama Administration (미국 정보자유제도와 정부기록관리 혁신 오바마 행정부의 정부개방정책을 중심으로)

  • Lee, Sang-min
    • The Korean Journal of Archival Studies
    • /
    • no.35
    • /
    • pp.3-40
    • /
    • 2013
  • Establishment and expansion of a FOI regime is a fundamental basis for modern democracy. Informed decisions and supports by the people are critical to establishment of democratic institutions and policies. The best tool to make informed decisions and to ensure accountability is the FOI. For effective FOI, good records management is necessary requirement. This paper observes and analyses the development of the FOI in the U.S., the Open Government policy, and the government records management reforms under Obama Administration to search viable solutions for Korean FOI and public records management reforms. Major revisions and advancement of the FOIA in the United States are examined, especially the revision of the FOIA as the OPEN Government Act of 2007. The FOIA revision enhanced greatly the freedom of information in the U.S. including the establishment of an independent FOI ombudsman by the Congress. The paper also discusses the Presidential memoranda on the Open Government and the FOI by President Obama, the following directives, Presidential memorandum on government records management and the Government Records Management Directive. Major contents of the directives, plans, and achievement are summarized and analysed. Finally, this paper compares the government records management reforms under former President Roh Mu Hyun with the Obama's reform drive. The comparison found that major difference in the "top-down" government records reforms are the difference in democratic institutions such as weak congressional politics, strong bureaucratic obstacles, and relatively weak social and professional supports for the reforms in Korea, while these reforms were similar in terms that they were driven by insightful political leaders. Independent FOI ombudsman and national records administration are necessary for such democratic reforms.

Algorithm Development for Effective Material Management in High-Rise Building Constructions (알고리즘 개발 연구방법론 기초연구 - 초고층 공사에서의 물류효율화를 위한 장비간 통신 방법 모델설정을 중심으로)

  • Cho, Chang-Yeon;Kwon, Soon-Wook;You, Seuk-Joon;Lee, Joo-Hyung
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.230-233
    • /
    • 2009
  • 3D(Difficult, Dirty, Dangerous) 산업의 대표적인 산업으로 인식되는 건설업은 현재 노무기능인력의 고령화와 신규 기능인력 육성의 어려움이라는 문제에 당면하였으며, 이러한 3D 산업이라는 이미지의 탈피 및 노동집약적 사업구조에 대한 변화에 대한 대안으로써 타산업과의 융복합을 통한 이미지 쇄신 및 생산성 향상을 위해 자동화 및 정보화를 위한 노력을 경주하고 있다. 본 연구에서는 건설 자동화 및 정보화를 위한 알고리즘 개발 연구방법론에 대한 기초연구로써, 초고층 공사에서의 물류 효율화를 위한 장비간 통신방법에 대한 모델을 설정하고, 해당 모델에 대해 적용 가능한 알고리즘을 도출하는 프로세스를 규명함으로써, 건설 자동화 및 정보화 연구를 진행하는 단계에서 최적화(Optimization)를 위한 알고리즘 규명에 대한 방안을 제시하고자 한다.

  • PDF