• Title/Summary/Keyword: 냉각재 공급자관

Search Result 2, Processing Time 0.018 seconds

Analysis of Defect in CANDU Feeder Pipe using Phased Array Ultrasonic Inspection System (냉각재 공급자관 위상배열 검사 적용에 따른 결함 분석)

  • Lee, Sang-Hoon;Jin, Seuk-Hong;Kim, In-chul
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.6 no.1
    • /
    • pp.78-82
    • /
    • 2010
  • The feeder pipe of Main Primary Heat Transfer System in Wolsong Nuclear Power Plant was inspected by the Ultrasonic Phase Array technique in 2010. It is the first time to apply this method to the construction at Nuclear Power Plant in Korea. The time required for UT technique is less than RT method. The UT method doesn't need to evacuate personnel who works nearby inspecting area and doesn't need to wait developing of film. For these reasons, the UT method is the fastest method among the volumetric inspections. As a result of the examination, it became clear that main defect of the feeder pipe is the Lack of fusion in the welded area. Moreover, the rate of defect was reduced gradually as improvement of welder's skill. If welding machine has problem, the defect has tended to same pattern(occurred same position in the welding area) but these defects were founded without specific rules. For these reasons, the creation of defect is dependent on the skill of worker not on the automatic welding machine. This evaluation of defect signal and collecting data would be useful to further examination in ISI.

  • PDF

Development of Remote Visual Inspection Technology for Calandria & Internal of CANDU NPP (중수로 칼란드리아 내장품 원격 육안검사 기술 개발)

  • Lee, Sang-Hoon;Jin, Seuk-Hong;Moon, Gyoon-Young
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.6 no.1
    • /
    • pp.72-77
    • /
    • 2010
  • During the period of reinforcement work for the licensing renewal of CANDU NPP, the fuel channels, Calandria tubes and feeders of CANDU Reactor are replaced. The remote visual inspection of Calandria internal is also performed during the period of reinforcement work. This period is a unique opportunity to inspect the inside of the Calandria. The visual inspection for the Calandria vessel and its internals of Wolsong NPP Unit 1 was performed by Nuclear Engineering & Technology Institute(NETEC) of KHNP. To perform this inspection, NETEC developed equipment applied new technology such as the synchronization of 3D CAD, automatic alignment and control system. The inspection confirmed that the Calandria integrity of Wolsong NPP Unit 1 is perfect.

  • PDF