Transactions of the Korean Society of Pressure Vessels and Piping (한국압력기기공학회 논문집)
- Volume 6 Issue 1
- /
- Pages.78-82
- /
- 2010
- /
- 1738-8333(pISSN)
Analysis of Defect in CANDU Feeder Pipe using Phased Array Ultrasonic Inspection System
냉각재 공급자관 위상배열 검사 적용에 따른 결함 분석
- Published : 2010.09.01
Abstract
The feeder pipe of Main Primary Heat Transfer System in Wolsong Nuclear Power Plant was inspected by the Ultrasonic Phase Array technique in 2010. It is the first time to apply this method to the construction at Nuclear Power Plant in Korea. The time required for UT technique is less than RT method. The UT method doesn't need to evacuate personnel who works nearby inspecting area and doesn't need to wait developing of film. For these reasons, the UT method is the fastest method among the volumetric inspections. As a result of the examination, it became clear that main defect of the feeder pipe is the Lack of fusion in the welded area. Moreover, the rate of defect was reduced gradually as improvement of welder's skill. If welding machine has problem, the defect has tended to same pattern(occurred same position in the welding area) but these defects were founded without specific rules. For these reasons, the creation of defect is dependent on the skill of worker not on the automatic welding machine. This evaluation of defect signal and collecting data would be useful to further examination in ISI.