• Title/Summary/Keyword: 긴장력 손실

Search Result 33, Processing Time 0.026 seconds

Behavior of Precast Prestressed Concrete Pavements under Post-Tensioning (프리캐스트 프리스트레스트 콘크리트 포장의 긴장에 의한 거동 해석)

  • Kim, Seong-Min;Cho, Byoung-Hooi
    • International Journal of Highway Engineering
    • /
    • v.9 no.3
    • /
    • pp.135-143
    • /
    • 2007
  • The pavement system constructed by tieing a number of precast concrete slabs employing prestressing techniques is called the precast prestressed concrete pavement. The behavior of this type of pavement system under post-tensioning was analyzed using a finite element model. First, the optimal number of anchors was determined by investigating the distribution of compressive stresses in the pavement system due to post-tensioning. Then, the effects of the parameters such as the horizontal resistance of underlying layers, the pavement length, the slab thickness, and the bearing area of the anchorage on the distribution of compressive stresses were analyzed. The horizontal resistance of underlying layers induced the loss of compressive stresses, and the loss increased in the middle of the pavement. As the pavement length increased or the slab thickness decreased, the stress loss due to the horizontal resistance of underlying layers became larger. However, the bearing area of the anchorage where the compressive forces were applied did not much affect the distribution of compressive stresses.

  • PDF

Numerical Analysis of Prestressed Concrete Pavements Subjected to Transverse Post Tensioning (횡방향 긴장에 의한 프리스트레스트 콘크리트 포장의 거동분석)

  • Kim, Seong-Min;Yoon, Dong-Joo;Kim, Dong-Ho
    • International Journal of Highway Engineering
    • /
    • v.10 no.4
    • /
    • pp.257-267
    • /
    • 2008
  • This study was conducted to investigate the stress distribution in the prestressed concrete pavement (PSCP) when the transverse post tensioning was applied. By performing the structural analyses using a finite element model of PSCP, the effect of anchor spacing and the relationship between the longitudinal and transverse post tensioning were evaluated. The analysis results showed that as the anchor spacing became smaller, the stresses were more uniformly distributed and the ranges of the stress losses were reduced; however, the economy should be considered. As the anchor spacing became larger, the difference between the average transverse stress and the transverse stresses at various locations such as shoulder, wheel pass, and center of the slab, increased. The transverse post tensioning induced the additional tensile forces in the longitudinal tendons, but the magnitude was negligibly small, and the longitudinal and transverse post tensioning could be designed independently. The use of the transverse stress distribution for the design of the post tensioning was also discussed in this paper.

  • PDF

A Study on Pretension Girder Method using Precast Concrete bed System (프리캐스트 콘크리트 제작대를 이용한 프리텐션 거더 제작 공법)

  • Ma, Hyang-Wook;Oh, Hyun-Chul;Kim, In-Gyu;Kim, Young-Jin;Kim, Keun-Taek
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.463-464
    • /
    • 2010
  • Pre-tension Girder using Precast Concrete bed System have advantage of simplifying construction process, reducing prestress-loss and cost compared with post-tension Girder. That is because it is possible to produce pre-tension Girder by prefabricated concrete bed in site not factory. This paper present pre-tension girder method using precast concrete bed system and field application.

  • PDF

Tensile Force Estimation of Externally Prestressed Tendon Using SI technique Based on Differential Evolutionary Algorithm (차분 진화 알고리즘 기반의 SI기법을 이용한 외부 긴장된 텐던의 장력추정)

  • Noh, Myung-Hyun;Jang, Han-Taek;Lee, Sang-Youl;Park, Taehyo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1A
    • /
    • pp.9-18
    • /
    • 2009
  • This paper introduces the application of DE (Differential Evolutionary) method for the estimation of tensile force of the externally prestressed tendon. The proposed technique, a SI (System Identification) method using the DE algorithm, can make global solution search possible as opposed to classical gradient-based optimization techniques. The numerical tests show that the proposed technique employing DE algorithm is a useful method which can detect the effective nominal diameters as well as estimate the exact tensile forces of the externally prestressed tendon with an estimation error less than 1% although there is no a priori information about the identification variables. In addition, the validity of the proposed technique is experimentally proved using a scale-down model test considering the serviceability state condition without and with the loss of the prestressed force. The test results prove that the technique is a feasible and effective method that can not only estimate the exact tensile forces and detect the effective nominal diameters but also inspect the damping properties of test model irrespective of the loss of the prestressed force. The 2% error of the estimated effective nominal diameter is due to the difference between the real tendon diameter with a wired section and the FE model diameter with a full-section. Finally, The accuracy and superiority of the proposed technique using the DE algorithm are verified through the comparative study with the existing theories.

A Study on the Determination of Prestressing Force Considering Frictional Loss in Prestressed Concrete Structures (프리스트레스 콘크리트 구조물의 마찰손실을 고려한 긴장력 산정에 관한 연구)

  • 조병완;이재형;태기호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.645-650
    • /
    • 2000
  • In the prestressed concrete structures, the effective prestressing force of tendon is basically most important item for structural safety and serviceability. The frictional loss is one of the major items for determinating the effective prestressing force and depend on the construction accuracy of the structures. In this thesis, it will be analyzed and found through measured hydraulic jack pressure, tendon elongation and prestressing control system that the tendancy of apparent curvature friction coefficient, the ratio of jacking force and required prestressing force, the ratio of initial jacking force and required prestressing force and compatibility of specified friction loss coefficient. The specified control limit for curvature friction coefficient of prestressing control system is about 0.25 and wobble friction coefficient 0.005. Thus, the control limit should be modified according to changed vale of friction coefficient.

  • PDF

A Study on the Prestress Losses of the P.C. Box Girder Bridge (P.C. 박스 교량의 긴장력 손실에 관한 연구)

  • 이성우;이지영;지기환
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1997.04a
    • /
    • pp.106-113
    • /
    • 1997
  • Until now, the evaluation of prestressing force during the survice state has received limited attention. Only initial prestressing force is estimated by reading the pressure values of a hydraulic jack or by observing the initial elongation of tendons. In this study, the initial losses and time dependent losses of prestressing force have been monitored by installing 12 vibrating wire-type load cells at the part of P.C. box bridge of Gangbyun Riverside Highway. Also comparative study was made for measured prestressing losses and estimated values. 2-dimensional analysis was performed to see the trend of prestressing losses, and the results was compared with measured ones.

  • PDF

Stress Variation Characteristics of Temporary Fixed Steel Rod in FCM Bridge Construction Method (FCM 교량 가설 공법에서 임시 고정 강봉의 응력 변화 특성 )

  • Hyun-Euk Kang;Wan-Shin Park;Young-Il Jang;Sun-Woo Kim;Hyun-Do Yun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.3
    • /
    • pp.21-29
    • /
    • 2023
  • In this study, the stress characteristics of temporary fixed steel rods were analyzed in the "temporary fixing system using internal prestressing tension", which is mainly applied to the construction of superstructures by FCM. It was difficult to confirm the changes in initial tensile force in this system because the steel rod was internally connected to the pier and the PSC BOX. Therefore, measurement was performed before and after the completion of each segment using an FBG sensor to measure the change in the micro length of the steel rod. The results of the analysis showed that 75% to 90% of the maximum vertical contraction of the steel rod that occurred until the completion of the cantilever segment occurred in the fixing ~ 1segment, and the maximum loss of initial prestressing force was 39%. Such excessive loss of tension force to 1 segment means that tension is needed to improve the precision of construction during the fixation, and re-tension is needed to secure stability for conduction of cantilever segments after the completion of 1segment. In the 2 ~ last segment, the stress of the steel rod decreased gradually, and in the summer, the decrease in stress tended to partially recover due to the increase in the length of the steel rod corresponding to the increase in the vertical volume of PSC BOX. The dominant factor in the stress change in 2~ last segment in this phenomenon is judged to be the change in the length of the steel rod according to the temperature. Unlike the change in length, the relaxation was 1.2-2.7%, which was mostly offset by the opposite stress corresponding to the temperature stress. Therefore, a plan was proposed to improve the internal stress, such as adjusting the fixation time.

Experimental study of Hydraulic Cable Connection Systems with Re-tensioning and Wireless Monitoring (재긴장과 무선 모니터링이 가능한 유압식 케이블 접합부시스템의 실험에 대한 연구)

  • Kim, Min-Su;Lee, Ki-Hak;Kim, Seong-Beom;Lee, Sung-Min;Baek, Ki-Youl
    • Journal of Korean Association for Spatial Structures
    • /
    • v.11 no.2
    • /
    • pp.71-79
    • /
    • 2011
  • Due to the self-equilibrium status of the cable system, the loss of the tensioning in the cable system results in other cables carrying larger tension forces than those initially calculated by structural engineers. Also, turn-buckle systems, which have been widely used to pre-tension and/or re-tension the cables, are limited to use for small cables and to provide a rough estimation for tension forces. In this study, the re-tensioning cable connection systems were developed to overcome the problems mentioned above. The main objective of the proposed system is to re-tension large cables and measure the exact amount of tension forces of the cable systems. This connection system is also combined with the wireless signal monitoring module so that engineers are able to measure the tension forces any place where the internet is available. This paper presents the development of the re-tensioning cable connection systems and experiment using the real-scale cable systems to verify the fe-tensioning and signal monitoring systems.

Evaluation of Prestress Loss in Prestressing Reinforcing Units using Steel Bar and Pipe (강봉 및 강관을 이용한 프리스트레싱 유닛의 긴장 응력 손실 평가)

  • Sim, Jae-Il;Mun, Ju-Hyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.4
    • /
    • pp.75-82
    • /
    • 2021
  • The objective of this study is to examine the loss of prestressing stress in the developed prestressing reinforcing units using steel bar and pipe (SP). The main parameters were the reinforcing bar type, the magnitude of prestressed force, and prestressing method. The test results showed that the loss of prestressing stress for SP was highest in the initial prestressing step, which was higher for the compression introduction typed specimens than tension introduction typed specimens. The loss of prestressing stress of SP made with P800 was 1.6% for the compression introduction typed specimen with 0.8fy, which was lowest than the other specimens. Meanwhile, the relaxation of SP with the respect to the time ranged between 0.4 and 1.9%, irrespective of SP material type, the magnitude of prestressed force, and prestressing method. These values were less than 2.5%, which is the maximum value for the relaxation of prestressed reinforcing steel bars in design codes. Consequently, considering the loss of stress developed in the initial prestressing step, the developed SP material type, prestressing introduction method, and magnitude are recommended to be P800, compression introduction type, and 0.8fy.

Safety Evaluation Development of Urban Structures Using Removal Bridge (철거 교량을 활용한 도시시설물의 안전성 평가 기법 개발)

  • Lee, Won Woo;Kim, Jung Hoon;Kang, Chang Mook;Kong, Jung Sik
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.81-81
    • /
    • 2011
  • 현재 국내에서 사용하고 있는 교량구조물의 성능평가방법으로는 크게 공용하중에 대한 내하율을 구하기 위하여 허용응력개념이나 강도설계 개념을 적용한 내하력 평가 기법이 사용되고 있다. 그러나 위의 방법들은 일반적으로 공용연수의 경과에 따른 재료 및 구조적 성능의 손실과 여러 가지 하중 및 환경적 요인들의 불확실성으로 인하여 발생하는 손상 및 열화를 반영하기 어렵다. 그리고 제원 및 재료물성치의 불확실성에 대한 기존 설계 자료의 DB 부족으로 기존의 평가방법에서는 이러한 시간의 경과에 따른 성능저하를 정확히 산정할 수 없어 이론상의 값과 실제 구조물과의 차이로 인한 불확실성이 존재 한다. 이에 본 연구에서는 공용년수 경과에 따른 시설물의 재료 구조적인 성능 및 거동분석 수행, 신뢰성 해석 수행을 바탕으로 교량 안전성 평가의 합리성 및 현실성을 제고하며, 구조 신뢰성 해석을 수행함으로써 실제 구조물의 강도 한계상태에 대한 파괴확률을 산정하고 그에 대응하는 위험도를 평가함으로써 안전성 검토를 수행하였다. 본 실험을 통해 1. 재료 강도, 부재 제원, 긴장력, 작용하중 등에 있어 설계 시 가정과 실제 사용 환경 사이의 변동성이 존재한다는 것을 알 수 있었으며, 2. 연구 수행 결과 일반 정밀진단 및 해석에서는 얻을 수 없는 다양하고 중요한 결과를 산출할 수 있었으며 이러한 연구 결과를 바탕으로 개선된 성능평가 기법이 제안 될 수 있음을 알 수 있었다.

  • PDF