• Title/Summary/Keyword: 기존공법

Search Result 977, Processing Time 0.039 seconds

Evaluation of Reinforcement Efficiency and Applicability Using a Reinforcement Method for Liquefiable Ground (액상화 발생 지반에 대한 보강공법 별 보강 효과 및 적용성 분석)

  • Yoo, Mintaek ;Han, Jin-Tae;Park, Youngjun ;Kim, Seok-Jung
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.5
    • /
    • pp.41-50
    • /
    • 2023
  • This study reviewed the liquefaction reinforcement and ground reinforcement methods widely used domestically and abroad through construction method characteristics and analyzed the economic feasibility and reinforcement efficiency of each reinforcement method. The analysis results were used to evaluate the applicability of the appropriate reinforcement method for the liquefaction reinforcement of new and existing structures. As a result of evaluating the applicability of the reinforcement method based on the economic feasibility and reinforcement effect of each reinforcement method, the compaction method, which secures the construct ability by applying large equipment, is advantageous when reinforcing a new structure, and the low-fluidity mortar injection method (C.G.S method) and the high-pressure injection method (J.S.P method) are considered appropriate in the existing structure.

The Physical Properties of Port Type Crack Injection Method Using Latex Elastic Storage Tube (라텍스 탄성 저장관을 활용한 포트식 균열주입 공법의 물리적 특성에 관한 연구)

  • Kim, Eun-Young;Sho, Kwang-Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.2
    • /
    • pp.68-75
    • /
    • 2018
  • In this study, to solve the problems of the conventional crack repair and injection method, high elasticity latex was used as the material of the storage tube to withstand the high pressure in the center part differently from the general port. When the repair solution was injected into the crack part, The TPS method was developed so that the air existing in the TPS can be discharged. In addition, a new infusion port in which a valve blocking the backflow of the remediation solution was installed at the injection port was developed and the physical characteristics of the port were analyzed. As a result of the evaluation, it was found that the filling rate of the remedial solution was improved compared to the existing ordinary injector method, and the cracks were completely filled in the test conditions. Compressive strength and tensile strength after repair showed about 20% decrease after repair in case of using ordinary injector method, while TPS method showed about 2~7% increase after repair. The results of this study showed that the injection port method using the elastic storage tube increased the injection performance and the quality after repair compared to the conventional injector method. The result of this study is expected to be utilized as the basic data for application and commercialization of the result to the practical structure.

An environmentally friendly tunnel construction method at low overburden (환경친화적인 저토피 터널굴착 공법)

  • Han, Kwang-Mo;Park, Inn-Joon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.3
    • /
    • pp.207-216
    • /
    • 2002
  • Conventional Korean tunnel portals require a lot of overburden. For stability reasons, about 1.5 to 2.0 times the tunnel diameter is needed for the height in order to achieve a sufficient arching effect. Thus, considerable movement of earth and support constructions are required which lead to undesirably large changes of and damage to the environment. With a massively designed pipe roof, tunnels at low overburden can be built. To effectively construct pipe roof as an advanced safeguarding method, the following properties are indispensable: stability, insensitivity to settling and drilling accuracy. A new pipe roof method, AT-casing system, has been developed which on the one hand entirely combines the properties mentioned above, and which on the other hand permits the construction of safe, economical and environmentally friendly tunnels at low overburden heights of 3 to 5m.

  • PDF

Performance of connection of Waffle Shape Precast Prestressed Concrete Slab Panels (와플(Waffle) 형상을 가지는 PC 패널의 접합 성능)

  • Heo, Seok-Jae;Kim, Hyeon-Jin;Ryu, Han-Gook;Choi, Kyoung-Kyu;Cho, Seung-Ho;Chung, Lan
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.305-308
    • /
    • 2008
  • This paper presents the results of an experimental study carried out Prestressed Concrete Slab System of WAffle Shape(WAS), was perfomed in order to inverstigate it connection shear behavior according to primary paramaters: connection interval, filling matarial. Specimen is produced in Precast Concrete factories and it comprised one WAS panel and two half WAS panels and then it is filled with packing. Within the ranges of the parameters of the connection details used in this test, connections can develop greater shear strength than the nominal shear strength and the design service load for parking structures.

  • PDF

Numerical Analysis of the Nail Behavior Considering Resisting Bending Moment (휨 저항을 고려한 네일 거동에 대한 수치해석적 분석)

  • Jeon, Sang-Soo;Kim, Doo-Seop;Jang, Yang-Won
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.10
    • /
    • pp.85-96
    • /
    • 2007
  • The application of soil nailing method has increased because it provides easier construction, economic efficiency, and stability than existing support methods. The mechanical comprehension of the soil-nailing system has not been established and the resisting shear force and bending moment of the soil-nail have been disregarded for the design of soil-nailing system. The soil nail consists of cement associated with rebar and resists shear force and bending moment mobilized by applied loading or soil-self weight. In this study, the slope analysis in the consideration of the resisting shear force and bending moment of the nail has been performed using $FLAC^{2D}$, which is programed by the finite difference method.

Behavior Evaluation of Thin Bonded Continuously Reinforced Concrete Overlay on Aged Jointed Concrete Pavement(2) (노후 줄눈 콘크리트 포장 보수를 위한 얇은 연속 철근 콘크리트 덧씌우기 포장의 거동 평가(2))

  • Ryu, Sung-Woo;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.12 no.4
    • /
    • pp.101-110
    • /
    • 2010
  • In this paper, it has been studied about the CRCO to maintain or rehabilitate the aged JCP. The CRCO and JCO was constructed at useless section of Seo-Hae-Ahn express highway in South Korea. The performance evaluation was conducted. Especially, it was focused on the roll of longitudinal reinforced steels inserted into the CRCO. On crack survey results from field construction section, the reflection cracks at joint of the existing pavement occurred in CRCO. However, due to the constraints of longitudinal reinforced steels, crack width was small. Total crack length and quantity in the CRCO more than that in the JCO. And crack spacing in the CRCO was narrower than it in the CRCP. Through the bonding strength test results, if the cold milling and cleaning as well as surface treatment is applied, there will be no debonding problem at interlayer in the early age. From analysis of the horizontal behavior at the joint, the longitudinal reinforced steels constrained crack width which became wider than initial state over time. Also, that steel in the CRCO reduced the horizontal movement due to temperature variation(4 times than that in the JCO). But, if interface is debonded, the roll decreased. Vertical VWG data showed that CRCO did not occur debonding problem at steel location, but there was some problem in JCO. It was confirmed by field coring. The tensile strain appeared in the CRCO, But the compressive strain occurred in the JCO in early age. Through the FWD test result, deflection in the CRCO was less than that in the JCO. And K value in the CRCO was greater than it in the JCO.

A Study on the Productivity Analysis of Slab Construction Methods - Focused on Conventional Slab, Form Deckplate, Ferro Deckplate, and Kem Deckplate - (슬래브 공법간의 생산성 분석$\cdot$비교에 관한 연구 - 재래식 슬래브, 골형 데크플레이트, 철근트러스 데크플레이트, 그리고 내화구조용 뎨크플레이트를 중심으로 -)

  • Yoo Jin-Ho;Kim Young-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.401-405
    • /
    • 2001
  • The purpose of this study is to provide productivity analysis of conventional slab method productivity and deckplate methods in building construction. Productivity analysis was performed on the data in construction sites and a interview survey. The results of this study are as follow: 1. Kem deckplate is analyzed to the most economic in a view of the cost. 2. Kem deckplate is analyzed to the most economic and order Ferro deckplate, Form deckplate and conventional slab method in a view of the productivity. 3. Kem deckplate is analyzed to the superior slab method in a view of the quality. 4. Conventional slab method is investigated disaster of precipitation and Deckplate method is hazard of an eletric shock. Therefore, Kem deckplate method is analyzed to the superior productivity

  • PDF

A Case Study on the Application of Low Vibration Blasting Method (미진동 발파공법 적용사례에 관한 연구)

  • 박주연;이천식;윤성현;안명석;류창하
    • Explosives and Blasting
    • /
    • v.20 no.3
    • /
    • pp.39-48
    • /
    • 2002
  • 우리나라는 지질특성상 각종 토공사를 시행할 때 암반 절취가 필수적이다. 그러나 소음진동 규제법의 강화, 각종 건설민원 발생 및 안전관리를 강화하기 위하여 종래에 해오던 일반발파(대발파)공법을 적용할 현장은 거의 없는 실정이므로, 미진동 발파공법과 진동제어 발파공법에 대한 기준품셈 및 시공기술에 대한 연구가 더욱 필요하다. 또한 종래의 미진동 발파공법의 품셈기준으로 되어있는 미진동 파쇄기(CCR, 상품명 Fine Cracker)를 사용한 발파공법은 기존의 암절취에 기술적 문제가 일부 대두되므로 이를 보완하기 위해 퇴적암 절취현장에서 미진동 파쇄기.정밀.에멀젼 화약을 사용하여 비교실험을 하였으며, 최근에 새로운 미진동 파쇄기(상품명 : Fine Cracker Plus)를 개발 시판하게 되어 이를 비교 검토하였다. 그 결과 일축 압축강도 $1623~2060kg/\textrm{cm}^2$의 경암 내지 극경암에서도 양호한 발파효과를 볼 수 있었다.

Analysis of the Performance of Crack and Seat Method using the LTPP Data (LTPP Data를 이용한 균열 및 안치(Crack and Seat) 공법 효과 분석)

  • Lee, Seung Woo;Hwang, Eun Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.609-615
    • /
    • 2006
  • Crack and seat method has been used in United States to prevent reflection cracks of overlay that may be caused by excessive movement at discontinuity of old concrete pavement. This method provide optium space of discontinuity by generating additional discontinuity in old concrete pavement. In this study the effect of various factors on the performance such as IRI and distress at after applying crack and seat method were investigated by using LTPP data.

Slope Stability due to Additional Embankment (제방 추가성토에 따른 사면안정)

  • Lee, Seung-Hyun;Jang, In-Sung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.7
    • /
    • pp.3232-3236
    • /
    • 2012
  • Consolidation and remedies for slope stability were considered for the slope with additional embankment. Transferred stresses due to additional embankment were assessed by the derived formula based on elasticity theory. Available remedies for slope stability with additional embankment including JSP method, stone column method and EPS method were studied. Caution needed for using JSP method is high pressure which can result in heaving of adjacent soils. Shortages of used case and noise of construction of stone column method are also considered for the safe remedy for slope stability.