• Title/Summary/Keyword: 기부채납률

Search Result 6, Processing Time 0.024 seconds

A Study on the Utilization Level of Public Facilities Obtained through Contributed Acceptance on Urban Regeneration Planning (도시정비사업의 기부채납 공공시설 이용실태에 따른 개선방안 연구)

  • Min, Bi Ra;Yin, Myung No;Yoo, Shin Ho;Kang, Jun Mo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4D
    • /
    • pp.397-406
    • /
    • 2012
  • Contributed acceptance system is causing problems with the usefulness and follow-up services and the like, other than the origin purpose which needs to be operated as rational adjustment method between the public interest and the private. Accordingly, this study has examine the problems by analyzing the present condition of practical public facilities and has the purpose on drawing the improvements by conducting consciousness survey from in substance users. The problems drawn from the analysis and the survey are location and position of the public facilities by reason of making public facilities at leftover land, the awareness and use as in-site facilities, creating street facilities without considering the use and safety of the users, follow-up service issues and the usefulness issues by creation without considering the surrounding conditions. The proposal of improvements for efficient operation by each problems are devising plans by considering location and position of the facilities for utilization and usefulness, secondly the necessity of the public relations for the improvements of the utilization of public facilities. thirdly, conducting the legal obligation by installing direction boards for its awareness of public facilities and delegating operation of facilities to public corporations such as SH, LH and inhabitants for efficient follow-up services, lastly, establishing the public facility map service which could figure out the surrounding conditions of public facilities to utilize for the contributed acceptance.

A Study of Appropriate Contributed Acceptance of Urban Infrastructure in Urban Renewal Project - Focused on the Gongpyung Renewal District - (수복형 도시정비사업의 정비기반시설 적정 기부채납에 관한 연구 - 서울시 공평구역 사례를 중심으로 -)

  • Na, In-Su
    • Journal of KIBIM
    • /
    • v.12 no.1
    • /
    • pp.35-41
    • /
    • 2022
  • This research aims to find the issues and explore policy agenda of contributed acceptance of urban renewal project. Through the analysis of urban renewal project in Seoul, three isssues was found as follows. Firstly, the ratio of contributed acceptance in each district was quite different. Secondly, the donated land was scattered around whole project area. Thirdly, infrastructures are not constructed until all renewal projects were implemented. For this issues, this research proposed that a proper standard of the ratio of contributed acceptance is needed and land donation should be designated to adjacent lot or block. Also public support should be for developing urban capacity and completing infrastructure.

법령과 고시 - 제로에너지 건축물 인증제도 1월부터 본격 시행

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.318
    • /
    • pp.56-58
    • /
    • 2017
  • 국토교통부는 녹색건축물 조성지원법 시행령 시행규칙을 개정하고 1월 20일부터 제로에너지건축물 인증제 시행에 들어간다. 제로에너지건축물은 고단열 건축자재와 신재생에너지를 결합하여 외부 에너지 유입을 최소화 한 건축물로 건축주는 인증을 원할 경우 인증기관에 신청하여 제로에너지건축물 인증을 받을 수 있으며, 인증받은 건축물에 대해서는 용적률 완화, 신재생에너지 설치보조금, 기부채납 부담률 완화 등의 인센티브가 제공된다.

  • PDF

Financial Feasibility Analysis for the Development of Urban Telecommunication Facility Purpose Site (도심 통신기반시설용지의 개발을 위한 재무타당성 분석에 관한 연구)

  • Park, Kyungyong;Jeong, Moonoh;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.31-41
    • /
    • 2015
  • The telecommunication industry has been considered as a national fundamental infrastructure. However, due to the rapid evolution of technology and the change of industry market conditions, the telecommunication infrastructure needs no more huge space for facility and it leads its use to the mixed-use development based on private investment. This study intends to examine the financial feasibility of the development project for the optimal alternative use of telecommunication facility purpose site as a case study based on two types: contributed acceptance and multi-level designation. The NPA and IRR has been analyzed by the simulation of stochastic variables including rent price and its variation rate, vacancy rate, construction cost, capitalization rate and discount rate. The research finding indicates that the two types of development are satisfied with the financial feasibility and it is noteworthy that the rent price turns out to be the most critical factor for the project. Accordingly, it is expected that these research finding can be applied for providing the solid cases of financial feasibility analysis for the development project in limited use of telecommunication facility purpose site.

A Study on the Characteristics of Projects Following the Promotion of Private Park Special Projects (민간공원특례사업의 추진에 따른 사업특성에 관한 연구)

  • Gweon, Young-Dal;Park, Hyun-Bin;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.5
    • /
    • pp.112-124
    • /
    • 2021
  • This study was conducted to examine and analyze local governments, park status, project characteristics, and the implementation in detail for private park special projects across the country as a means of responding to the sunsetting of urban parks. As a result of the analysis, first, the private park special project, was found to be mainly implemented in cities with a population of more than 100,000, so there was a limit to the application on military installations or in local small cities. Therefore, rather than applying the special system collectively, it was judged that institutional flexibility, considering the characteristics and size of local government, was needed. Second, the current special projects by the park creation donation collection method shows monotonous development centered on apartment houses, so it is necessary to diversify the development by introducing a park preservation method that purchases and donates park sites. Third, it was found that the area standard needs to be eased to less than 50,000m2 to include parks with high utilization and good accessibility in urban areas of large cities, as the type and area of parks are limited. Fourth, most special projects are mountain parks, which are feared to damage the natural terrain and skyline, so separate ordinances should be established and applied, and development approaches should be made to allow nature and parks to coexist with the setting of detailed building guidelines for each type of facility. The guidelines should include, first, after the nationwide private park special projects are completed, standards for appropriate returns for similar projects should be established, institutional standards such as the recovery of excess profits should be established, and environmental reviews should be conducted. Second, it was found that local governments should institutionalize the composition of private consultations to promote the efficient management of projects through a cooperative system, and third, a roadmap for maintenance after the donation of special parks should be established.

A Feasibility Study on Acquisition System of the Urban Parks under the Special Use Permit - Focused on the Neighbourhood Parks Unexecuted in Long-term in Suwon City - (도시공원에서의 개발행위 특례 적용을 위한 사업수지분석 연구 - 수원시 장기미집행 근린공원을 중심으로 -)

  • Kim, Sung-Yong;Lee, Chang-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.38 no.4
    • /
    • pp.54-63
    • /
    • 2010
  • The recently-introduced Special Use Permit system is an exceptional approval system for private park developers to develop unexecuted urban park sites into urban parks with the implementation of profit-generating businesses within the boundary of preserving the original function of the park under an agreement with local authorities. This thesis studies the application of this system. This is a feasibility study of cases that have contributed to the acceptance of intended park sites by developing some parts of park sites as public housing, focused on unexecuted urban park areas for the long term in Suwon City based on the Special Use Permit, and creating other sites as park area. First, it has been judged that realization of business is possible at 300 percents of the floor area ratio in case of flatland neighborhood park which has high appraised land values. It is judged that realization of business is possible within a 10 percents size of private land at 200 percents of the floor area ratio in case of woodland and waterside neighborhood parks that have low appraised land values on the outskirts of the city. Second, through working expenses combining compensation and money for park construction, a balance of business profit can be understood within about 50 percents of total expenditures. Because the public contribution ratio by the Special Use Permit can be presumed as about 50 percents of total expenditures, it implies that windfall profits by the Special Use Permit can be adequately collected.