• Title/Summary/Keyword: 기둥-슬래브

Search Result 170, Processing Time 0.023 seconds

Effects of details of lattice reinforcement for punching shear strength of slab-column connections (슬래브-기둥 접합부의 뚫림 전단강도에 대한 래티스 보강상세의 영향)

  • Kim, You-Ni;Park, Hong-Gun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.11a
    • /
    • pp.17-20
    • /
    • 2006
  • A flat plate-column connection is susceptible to brittle punching shear failure, which may result in the necessity of shear reinforcement. In previous, experimental tests were performed to study the capacity of slab-column connections strengthened with various shear reinforcement, and the capacity of the specimens with lattice reinforcement are superior to the others. In present study, to study for effects of details of lattice reinforcement, experimental studies was performed. Main parameters are the amount of lattice shear reinforcement, arrangement of lattice and the effect of flexural re-bar. And capacity of the specimen with small amount of lattice reinforcement was higher than the capacity of other shear reinforcement.

  • PDF

A Study of Shear Reinforcement for Slab-Column Connection (슬래브-기둥 접합부의 전단보강상세에 관한 연구)

  • Baek, Sung-Woo;Kim, Jun-Seo;Choi, Hyun-Ki;Choi, Chang-Sik
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.37-40
    • /
    • 2008
  • The study is an experimental test on full-scale flat plate slab-column interior connection. The punching shear on the flat plate slab-column connection can bring about the reason of the brittle punching shear failure which may result of collapsing the whole structure. From the development of residential flat plate system, the shear reinforcement is developed for preventing the punching shear. For making sure of the punching shear capacity, developed for shear reinforcement in slab-column connection, the structural test is performed. The dimension of the slabs was 2620*2725*180mm with square column (600*800mm). The slabs were tested up to failure monotonic vertical shear forces. The presences of S/S bar and wire mesh substantially increased the punching shear capacity and the ductility of the slab-column connections.

  • PDF

Seismic Response of Exterior Beam-Column-Slab connection using High-Strength Materials (고강도 재료를 사용한 외부 보-기둥-슬래브 접합부의 지진응답)

  • 장극관
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 1999.10a
    • /
    • pp.343-350
    • /
    • 1999
  • The purpose of this study is to compare the response of the high-strength concrete beam-column-slab subassembly with the response of a normal-strength concrete specimens. Four assemblies were designed 2/3 scale beam-column-slab joint(fc'=240kg/cm2 fc'=700kg/cm2) and tested to investigate seismic behaviour. From the test results 1) flexral cracks emerge to inside of bean deeply for high strength concrete member 2) the high-strength specimens represented stable hysteretic behaviour for the displacement ductility 5.5 but degradation in stiffness and strength and unstable hysteretic behaviors were observed owing to the brittleness of high-strength concrete beyond its range.

  • PDF

Theoretical Evaluation of the Post Tensioning Effect in Continuous Slabs (연속 슬래브의 포스트 텐셔닝 보강에 대한 이론적 분석)

  • Kim, Chang-Hyuk;Kim, Kang-Su;Kim, Sang-Sik
    • Journal of the Korea Concrete Institute
    • /
    • v.21 no.1
    • /
    • pp.105-116
    • /
    • 2009
  • Reinforced concrete (RC) structures have been most widely used because of their good economic efficiency. However, it is very weak in tensile stresses and difficult to control deflection due to the heavy self-weight of concrete. On the other hand, it is generally known that prestressed concrete structures can be the most effective to overcome the demerits of RC structures by using various tendon lay-out and its amount. In the prestressed concrete members, the inflection points of tendons should be placed effectively for the deflection control and the moment reduction. Therefore, in this study, the equations of tendon profiles are derived in terms of polynomials that satisfy essential conditions of tendon geometries such as inflection points and natural curved shapes of tendons placed in continuous members, from which vertical components of prestressing forces can be also calculated. The derived high order polynomial expression for the distributed shape of the upward and downward forces was transformed to an simplified equivalent uniform vertical force in order to improve the applicability in the calculation of member deflection. The influences of vertical forces by tendons to deflection and moment in a continuous slab were also considered depending on the distance from column face to the location of tendons. The applicability of the proposed method was examined by an example of deflection calculation for the cases of slabs with and without tendons, and the efficiency of deflection control by tendons was also quantitatively estimated.

Heat Transfer Analysis and Experiments of Reinforced Concrete Slabs Using Galerkin Finite Element Method (Galerkin 유한요소법을 이용한 철근콘크리트 슬래브의 열전달해석 및 실험)

  • Han, Byung-Chan;Kim, Yun-Yong;Kwon, Young-Jin;Cho, Chang-Geun
    • Journal of the Korea Concrete Institute
    • /
    • v.24 no.5
    • /
    • pp.567-575
    • /
    • 2012
  • A research was conducted to develop a 2-D nonlinear Galerkin finite element analysis of reinforced concrete structures subjected to high temperature with experiments. Algorithms for calculating the closed-form element stiffness for a triangular element with a fully populated material conductance are developed. The validity of the numerical model used in the program is established by comparing the prediction from the computer program with results from full-scale fire resistance tests. Details of fire resistance experiments carried out on reinforced concrete slabs, together with results, are presented. The results obtained from experimental test indicated in that the proposed numerical model and the implemented codes are accurate and reliable. The changes in thermal parameters are discussed from the point of view of changes of structure and chemical composition due to the high temperature exposure. The proposed numerical model takes into account time-varying thermal loads, convection and radiation affected heat fluctuation, and temperature-dependent material properties. Although, this study considered standard fire scenario for reinforced concrete slabs, other time versus temperature relationship can be easily incorporated.

Studies on Behavior Characteristics of Retrofitted Cut-and-Cover Underground Station Using Centrifuge Test Results (원심모형실험을 이용한 내진 보강된 개착식 지하역사의 거동특성 연구)

  • Kim, Jin-Ho;Yi, Na-Hyun;Lee, Hoo-Seok
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.2
    • /
    • pp.24-33
    • /
    • 2017
  • Domestic urban railway underground station structures, which were built in the 1970s ad 1980s, had been constructed as Cut-and-Cover construction system without seismic design. Because the trends of earthquake occurrence is constantly increasing all over the world as well as the Korean Peninsula, massive human casualties and severe properties and structures damage might be occurred in an non-retrofitted underground station during an earthquake above a certain scale. Therefore, to evaluate the retrofit effect and soil-structure interaction of seismic retrofitted underground station, a centrifugal shaking table test with enhanced stiffness on its structural main member are carried out on 1/60 scaled model using the Kobe and Northridge earthquakes. The seismic retrofitted members, which are columns, side walls, and slabs, are evaluated to comparing with existing non-retrofitted centrifuge test results Also, to simulate the scaled ground using variation of shear velocity according to site conditions such as ground depth and density, resonant column test is performed. From the test results, the relative displacement behavior between ground and structures shows comparatively similar in ground, but is increased on ground surface. The seismic retrofit effects were measured using relative displacements and moment behavior of column and side walls rather than slabs. Additionally, earthquake wave can be used to main design factor due to large structural deformation on Kobe earthquake wave than Norhridge earthquake wave.

Structural Design And Analysis of Haeundae Doosan We've The Zenith (해운대 두산 위브 더 제니스 구조설계)

  • Park, Ki-Hong;Park, Suk-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.93-98
    • /
    • 2008
  • Haeundae Doosan We've The Zenith project is adjacent to Suyoung-bay, now it is in the process of excavation and foundation work. The main use of the tower is residence which height is 300m and 80 floor, the highest residential reinforced concrete building through the Orient. It is comprised of 3 high- rised buildings and 1 low-rised building, the basement is 230m wide and 200m length sized mass structure. The lateral resistance system is acted effectively against the lateral load and satisfactorily against the wind vibration by the 4 direction extension of the center core wall($700{\sim}800mm$ thickness) and reinforced concrete column set around the slab. Flat-plate slab system(250mm thickness) is adjusted for the slab system and it enables effective work process and shortening the working term by minimizing the ceiling height and not needing to install perimeter beam and drop panel. The strength and serviceability of the structure is able to be monitored and estimated constantly through the health monitoring system during the construction and after the construction.

  • PDF

Seismic Retrofit of Welded Steel Moment Connections Considering the Presence of Composite Floor Slabs (바닥슬래브를 고려한 용접철골모멘트접합부의 내진보강)

  • Lee, Cheol Ho;Kim, Sung Yong
    • Journal of Korean Society of Steel Construction
    • /
    • v.29 no.1
    • /
    • pp.25-36
    • /
    • 2017
  • In the 1994 Northridge earthquake, connection damage initiated from the beam bottom flange was prevalent. The presence of a concrete slab and resulting composite action was speculated as one of the critical causes of the prevalent bottom flange fracture. In this study, four seismic retrofit schemes are proposed in order to salvage welded steel moment connections with composite floor slabs in existing steel moment frames. Because top flange modification of existing beams is not feasible due to the presence of a concrete floor slab, three schemes of bottom flange modification by using welded triangular or straight haunches or RBS(reduced beam section), and beam web strengthening by attaching heavy shear tab were cyclically tested and analyzed. Test results of this study show that haunch and web-strengthened specimens can eliminate the detrimental effect caused by composite action and ensure excellent connection plastic rotation exceeding 5% rad. Design recommendations for each retrofit scheme together with supplemental numerical studies are also presented.

A Case Study on Explosives Demolition of the Dongdaemoon Complex Stadium(Baseball field) in Republic of Korea (동대문 운동장(야구장) 발파해체 시험시공 사례)

  • Min, Hyung-Dong;Park, Jong-Ho;Song, Young-Suk;Seo, Young-Su;Kim, Rea-Hoe;Jung, Byeong-Ho
    • Explosives and Blasting
    • /
    • v.26 no.1
    • /
    • pp.23-37
    • /
    • 2008
  • The Dongdaemoon complex stadium is scheduled to remodelled into an international park, which will be named Design Plaza. The Dongdaemoon baseball field was constructed with Rahmen Structure which comprised beams, slabs and columns. In order to assure for viewing, the stadium was composed unusual structure that the height of the front column and the back column was designed differently. The bleachers was an upper arch form for viewing. The slab was not flat unliked the general infrastructure and tilted in stairway type for viewing. If we had applied the mechanical demolition method, we could have predicted several problems. Firstly, the stand could be unstable when the heavy equipment was to crush the reinforced concrete on the slab. Because the slab was not flat. Secondly, the construction expense and construction duration could be increase when the large equipment was to crush the reinforced concrete on the ground. Because the height of the stand was too high to crush on the ground so it needed to build a filling. Thus, we applied both the mechanical demolition method and explosives demolition method at the design stage. The result of explosives demolition was of complete success in terms of structural movement and controlled blasting noise and vibration. This case study provided a good example for a successful application of explosives demolition in urban areas.

Prevention of Early Frost Damage of the Concrete under Severely Low Temperature according to Heat Curingmethods (극저온 조건에서 보온양생 방법 변화에 따른 콘크리트의 초기동해 방지)

  • Han, min-Cheol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.1
    • /
    • pp.67-76
    • /
    • 2016
  • Concrete exposed to severely low temperature below $-20^{\circ}C$ should be provided with proper heat supplying curing to protect the concrete from early frost damage at the time of pouring.meanwhile, so far, effective heat curingmethods of the concrete under severely low temperature are not well established in Korea. For this reason, the objective of this paper is to provide effective heat curingmethod of concrete exposed to severely low temperature to protect early frost damage by varying the combination of heat curingmaterial combinations. Temperature history,maturity development and core strength results are investigated. Fourmock-up specimens simulating slab, wall and column were prepared and heat insulation, heat supplying and both were applied. Test results indicate that the combination of quadruple layer bubble sheet(4BS) and embedding of heating cable has desirable performance for a slab, and heat supplying curing inside heat enclosure and heat generationmat also shows desirable performance for a wall, and for a column, use of EPS heat insulation has proper performance against early frost damage, which reaches $45^{\circ}D{\cdot}D$ and helps the concretemaintain above $0^{\circ}C$ within 3 days. Themethodsmentioned above are believed to be optimum protection from early frost damage of the concrete under $-20^{\circ}C$.