• Title/Summary/Keyword: 기계탈수공법

Search Result 2, Processing Time 0.014 seconds

Economical Feasibility of the Treatment Methods of the Dredged Sediments from Contaminated Agricultural Reservoirs (농업용 저수지 준설토의 처리 공법에 따른 경제성 분석)

  • Oh, Kyoung-Hee;Cho, Young-Cheol
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.35 no.10
    • /
    • pp.756-762
    • /
    • 2013
  • The economical feasibility was conducted to find the adequate method to treat the dredged sediments from agricultural reservoirs in a pilot project that had been operated to improve the quality of water and benthic environments by dredging of contaminated sediments. For benefit/cost (B/C) analysis, the net expenses were considered as the costs of project, and the benefits were calculated from the saving of waste-treatment cost through reuse of dredged sediment, the saving of construction cost of settling pond, and the values of retained water by dredging. Although the economic feasibility depended on the sites of operation, the average B/C value of the pilot project was estimated as 1.32, indicating this project is economically feasible. Depending on the treatment methods, the B/C values were in the order of the methods of coagulating sedimentation, machinery dewatering, stabilization through exothermic reaction, and soil improvement and stabilization. The machinery dewatering method is estimated as the most adequate one to treat the dredged sediments because of the minimum riskiness of secondary pollution, the recyclability, and its economic feasibility.

Study on the Change of Relative Humidity in Subsea Pipeline According to Drying Method (건조 공법에 따른 해저 파이프라인 내부 상대습도 변화 특성 연구)

  • Yang, Seung Ho
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.2
    • /
    • pp.406-413
    • /
    • 2022
  • The subsea pipeline pre-commissioning stage consists of the following processes: Flooding, Venting, Hydrotesting, Dewatering, Drying, and N2 Purging. Among these processes, drying and nitrogen purging processes are stipulated to reduce and maintain the relative humidity below dew point to prevent the generation of hydrate and the risk of gas explosion in the pipeline during operation. The purpose of this study is to develop an analysis method for the air drying and nitrogen purging process during pre-commissioning of the subsea pipeline, and to evaluate the applicability of the analysis method through comparison with on-site measurement results. An analysis method using Computational Fluid Dynamics (CFD) was introduced and applied as a method for evaluating the relative humidity inside a subsea pipeline, and it was confirmed that analysis results were in good agreement with the on-site measurement results for the air drying and nitrogen purging process of the offshore pipeline. If the developed air drying and nitrogen purging analysis method are used as pre-engineering tools for pre-commissioning of subsea pipelines in the future, it is expected to have a significant impact on the improvement of work productivity.