• Title/Summary/Keyword: 근접터널

Search Result 174, Processing Time 0.024 seconds

A study on design concept and analysis method of closely spaced tunnels (근접터널의 설계개념 및 해석기법에 대한 연구)

  • Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.1
    • /
    • pp.33-42
    • /
    • 2003
  • The use of tunnels in major transportation schemes has increased considerably during the last decade especially in urban area. The state of stress and the displacements in a zone around a tunnel will be modified by the construction of a tunnel. Therefore, it is necessary to study the influence factors for the nearby tunnels. This paper describes the design concept and analysis method on the closely spaced tunnels. The main purpose of the present paper is to study the influence of tunnel construction on the behaviour induced in the liners of nearby tunnels. The effects of tunnel proximity and alignment, liner stiffness and settlements are also reviewed in this paper. The paper then introduces the design and analysis methods for the closely spaced tunnels which is very useful in practice.

  • PDF

대단면 근접병설터널의 설계 및 안정성 평가기법에 관한 연구

  • 김도형;박준경;김영근;오세준;이두화
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2003.03a
    • /
    • pp.51-66
    • /
    • 2003
  • 최근 용지매입의 제한과 자연환경훼손의 최소화를 도모하는 사회적 환경으로 인해 대단면 근접병설터널 계획이 점차 증가하고 있다. 지금까지는 주로 중앙벽체부의 지지기능을 활용한 2Arch터널의 형태로 도심지 지하철의 정거장이나 고속도로의 일부구간에 계획되고 있으나, 대단면 근접병설터널에 대한 시공실적 및 설계사례가 부족한 국내에서는 이에 대한 역학적 거동과 합리적 시공방안에 대한 연구가 미흡한 실정이다. 따라서, 대단면 근접병설터널에 대한 국내·외의 설계 및 시공사례를 정리·분석하므로서 차후 제한된 구간에서의 터널계획시 합리적인 설계 및 시공이 되고자 하였다. 또한, 최근 도심지 구간에 계획중인 터널의안정성 검토 사례를 중심으로 터널 및 인접구조물, 중앙필러부 및 콘크리트 라이닝에 대한 상세 안정성 검토방법을 고찰함으로써 기존 병설터널의 거동특성과는 구별되는 대단면 근접 병설터널의 안정성 평가기법에 대한 방향을 제안하였다.

  • PDF

Review of Mechanical Behaviors of Pillar in Large Parallel Tunnel (대단면 근접병설터널에서의 필러부 거동특성 검토)

  • Sin, Young-Wan;Kim, Young-Geun
    • Tunnel and Underground Space
    • /
    • v.20 no.3
    • /
    • pp.131-144
    • /
    • 2010
  • The design and construction of tunnels has been followed an large parallel tunnels with a small clearance because of the various conditions. Rock pillar between each single tunnel is supposed to be under heavy load by rock mass. The stability of pillar is very important for the ensure the stability of the large parallel tunnels. In this study, the analysis of stress state of pillar at various construction cases is reviewed to investigate the mechanical behaviour of tunnels and stability of the pillar.

A study on the stability analysis for asymmetry parallel tunnel with rock pillar (암반 필라를 포함한 비대칭 근접 병설터널의 안정성 평가에 관한 연구)

  • Kim, Do-Sik;Kim, Young-Geun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.4
    • /
    • pp.387-401
    • /
    • 2007
  • Recently, because of the restriction of land for construction and interference of adjacent structure, parallel tunnels with small clearance have been planned and constructed in many sites. In this case, the stability of pillar at center part is very important factor to satisfy the stability of tunnel structure under the construction. In this paper, numerical analyses for the asymmetry parallel tunnels with a narrow width of pillar have been carried out to search for the optimum reinforcement measure for rock pillar and verify the stability of tunnel. Rock pillar between each single tunnel is supposed to be under heavy load by rock mass. The analysis of stress state at rock pillar at various cases for construction conditions is required to investigate the structural behaviour of tunnels and stability of the pillar. Strength-stress ratio is calculated based on the failure theory of rock and the safety factor of tunnel is computed with strength reduction technique. Through these numerical results, reasonable reinforcement measures for rock pillar at parallel tunnel were established and recommended.

  • PDF

TBM 터널과 NATM 터널의 초 근접시공 사례

  • 이인기
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.1 no.2
    • /
    • pp.161-170
    • /
    • 1999
  • 본고에서는 $1986.8\~1988.7$월중에 시공된 부산지하철 1호선 3단계 건설구간 중 서대신동 로타리에서 괴정국민학교 앞까지 연${\cdot}$경암지역에서의 TBM(Tunnel Boring Machine)으로 시행된 단선터널(7.0m)과 NATM으로 시행한 복선터널의 근접시공에 따른 간벽부 보강설계 내용과 근접부 시공시 계측결과 분석, 지보 Pattern조정 및 시공 실적 등을 제시하였다. 원설계 내용 분석 결과 지보 Pattern이 현장 지반조건에 비해 과다하였고 TBM 굴진시 Thrust 2500kN(본 기계 기준) 이상인 연암이상의 지반에서는 TBM 굴착으로의 효율성이 있었고, 경암구간에서 병행터널의 간섭영향을 배제하려면 터널간의 중심거리가 터널직경의 2배 이상이 되어야 하며, TBM 단선터널(7.0m)의 일 평균 굴진 길이는 4.6m로 분석되었다. 앞으로 이와 유사한 암층에서의 터널근접 시공 및 TBM 굴착시 본 분석내용이 참고가 되기를 기대하여 본고를 작성하였다.

  • PDF

Railway Tunnel Blasting Design adjacent to the Existing "Live" Tunnel (운행중인 철도 터널에서의 근접 발파 설계)

  • Kim, Dal-Sun;Lee, Hee-Chul
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.404-409
    • /
    • 2001
  • 현대건설(주)은 중앙선 (덕소 ∼ 양수) 복선 전철공사 실시설계 입찰을 위한 일련의 조사 및 설계를 수행하였다. 본 논문은 사업 구간에 속해 있는 월문터널에 대한 설계를 수행하는 과정에서 현재 기존 노선이 운행되는 있는 단선 터널에 근접한 지역에서 공사 중에 운행되고 있는 열차의 안정성을 확보하기 위한 기초 조사를 선행하였다. 본 논문의 목적은 현재 국내에서 시행되고 있는 근접 터널 시공 문제에서 (특히, 화약 발파에 의한 터널 설계 및 시공) 문제시되고 있는 적절한 진동제어에 대한 수치가 필요 이상으로 적용되고 있다는 점에 대하여 향후, 경제적이고 도전적인 설계를 위한 제시를 하기 위함에 있다.

  • PDF

A Study on the Near Construction Range Considering the Factors Affecting the Stability of Water Tunnel (수로터널 안정성에 미치는 요소를 고려한 근접시공범위에 대한 연구)

  • Mingyu Lee;Donghyuk Lee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.5
    • /
    • pp.5-12
    • /
    • 2023
  • Recently, due to urban development and expansion, construction plans have been increasing adjacent to existing tunnel structures such as subways, roads, and large pipelines. Structural plans adjacent to existing tunnels have different effects on tunnel stability depending on the construction method, degree of proximity, and location of new structures. In particular, the pressure water tunnel shows a very large difference from other road tunnels and railway tunnels in geotechnical characteristics and operation characteristics. Therefore, it is necessary to review the safety zone due to adjacent construction in consideration of the geotechnical characteristics of the water tunnel and the new sturure construction method. In this study, the existing tunnel safety zone standards were investigated. A stability evaluation performed numerical analysis considering the deterioration of concrete lining in operation and the characteristics of water tunnel. In addition, the impact of vibration caused by pile construction and blasting excavation of new structures was reviewed. Based on this, a pressure water tunnel safety zone was proposed in consideration of adjacent construction.

Tunnel Safety Diagnosis in Near-excavation by In-depth Inspection of Tunnel (기존터널 안전진단 결과를 통한 근접시공 시 터널 안정성 평가)

  • Kim, Seok-Jae;Kim, Min-Seok;Kim, Jun-Chul;Yoo, Young-Il;Oh, Joung-Bae;Oh, Sae-Joon
    • Tunnel and Underground Space
    • /
    • v.16 no.4 s.63
    • /
    • pp.347-356
    • /
    • 2006
  • We analyzed case studies doing in-depth inspection of tunnel to maintain safety of existing tunnel in constructing new tunnel near to a existing tunnel with single track. Futhermore, We accomplished in-depth inspection of existing tunnel and numerical analysis. We suggested remedies to security safety of existing tunnel. We applied line drilling and pre-large hole boring method not to have an effect on existing tunnel and convinced the safety of existing tunnel from blast-vibration and blast-noise of numerical analysis. We planed to install basset system to measure displacement of existing tunnel according to excavating new tunnel.

Behavior of Closely-Spaced Tunnel According to Separation Distance Using Scaled Model Tests (축소모형실험을 통한 이격거리에 따른 근접터널의 거동)

  • Ahn, Hyun-Ho;Choi, Jung-In;Shim, Seong-Hyeon;Lee, Seok-Won
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.7
    • /
    • pp.5-16
    • /
    • 2008
  • Most of roadway tunnels have been constructed in the form of parallel twin tunnel in Korea. If parallel twin tunnel does not have a sufficient separation distance between tunnels, the problem of tunnel stability can occur. Generally, it is reported that tunnels are not influenced by each other when a center distance between tunnels is two times longer than tunnel diameter under the complete elastic ground and five times under the soft ground. In this study, the scaled model tests of closely-spaced parallel twin tunnel using homogeneous material are performed and induced displacements are measured around the tunnel openings during excavation. The influence of separation distance between tunnels on the behavior of closely-spaced tunnel is investigated. The experimental results are expressed by the induced displacement vector and progress of crack during construction and at failure. The results show that based on the analysis of induced displacement at the crown during construction, the additional displacement of the preceding tunnel induced by the excavation of following tunnel decreases as the separation distance between twin tunnel increases until the center to center distance is two times of tunnel diameter. Beyond this point, however, the additional displacement has become stabilized.

Behavior of the tunnel under the influence of a existing building during the adjacent ground excavation (근접굴착 시 기존건물의 영향을 받는 터널의 거동)

  • Lee, Jong-Min
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.3
    • /
    • pp.609-623
    • /
    • 2018
  • If the ground is excavated in a depth which is deeper than the adjacent existing tunnel, the behavior of the braced wall is known to be greatly affected by the presence of the tunnel. By the way it is expected to be also affected by the structure on the ground surface, There are not many examples of studies which are conducted on this subject. As a result, largel scale model tests and analysis were conducted, to measure the behavior of the tunnel under the building whose location on the ground surface was varied during the adjacent ground excavation. For this purpose, the location of a building load was varied in 0 m, 1D, 2D on ground surface. In this paper, the behaviors of braced wall and adjacent tunnel was studied. Model tests in 1 : 10 scale were performed in real construction sequences. The size of test pit was $2.0m(width){\times}6.0m(height){\times}4.0m(length)$ in dimension. As a result, it was found that the stability of the existing tunnel under the influence of the building load on the ground surface adjacent to the braced wall.