Effect of tunneling under a bridge on pile foundation behavior mechanism (교량 직하부에 시공되는 터널에 의한 말뚝기초의 거동변화)

  • Choi, Go-Ny;Woo, Seung-Je;Yoo, Chung-Sik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.1
    • /
    • pp.51-69
    • /
    • 2011
  • This paper presents the effect of tunneling on bridge pile foundation being operated using three-dimensional numerical modeling. Also the parametric study on the depth of tunnel of which the diameter was 10 m was carried out in order to evaluate the behaviors of pile foundation due to the tunnel excavation. This paper expresses the changes of vertical and horizontal displacement, movement of soil and stress of the pile. Based on the results obtained from the numerical analysis some insights into the changes of pile foundation behaviors due to variations of tunneling location were mentioned and discussed.

Application of the Evaluation System of Rock Mass in a Mountain Tunnel Constructed by NATM (NATM 시공 산악터널에서의 암반평가시스템 적용 연구)

  • 김영근;장정범;정한중
    • Tunnel and Underground Space
    • /
    • v.5 no.4
    • /
    • pp.297-307
    • /
    • 1995
  • 터널은 긴 선상구조물로서 사정조사결과와 다른 지질조건이 나타날 수 있으므로, 안전하고 합리적인 터널공사를 위해서는 시공중 지질조건에 적합한 지보설계를 실시하는 것이 필수적이다. 이를 위해서는 시공중 터널주변자반에 대한 정량적이고 공학적인 평가가 매우 중요하다. 그러나 시공중 암반을 평가하는 것은 매우 어렵고 조사자의 경험과 지식의 차이에 의해 평가정도가 크게 달라져 그 불합리성이 심화되고 있는 실정으로 터널주변암반에 대한 합리적인 평가방법이 절실히 요구되고 있다. 본 연구에서는 터널화상처리, GeoCAD, 역해석으로 구성된 평기시스템을 개발하였다. 본 시스템은 터널막장에서의 조사.시험 및 화상처리기법을 통하여 암반분류.평가를 실시하고, 터널주변 지반구조 및 굴착/지보과정의 3차원 모델링을 통하여 전방지질을 예측가능하게 하며, 터널계측자료의 역해석을 통하여 터널주변 지반의 물성을 정량적으로 평가할 수 있는 체계적이고 종합적인 평가시스템이다. 또한 이를 NATM 공법으로 시공되는 터널현장에 적용하므로써 본 시스템의 현장적용성을 검증하였으며, 이를 통해 적절한 지보공을 시공하여 터널의 안정성을 확보하고 합리적인 시공관리를 달성할 수 있었다.

  • PDF

An Analysis on the Vertical Load Bearing Behavior according to Construction Methods of a Environment-friendly Screw Concrete Pile for the Noise and Vibration-free Method (무소음.무진동 공법을 위한 환경친화적인 스크류콘크리트말뚝의 시공방법에 따른 연직하중지지거동 분석)

  • Kim, Dongchul;Choi, Yongkyu
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.6
    • /
    • pp.5-11
    • /
    • 2013
  • Because the regulation for a noise and a vibration in our country has been being reinforced more and more, a more environment-friendly pile construction method than a current low-noise and low-vibration method was needed for the close construction in the downtown area. In this study, the characteristics of a screw concrete pile method for noise and vibration-free method was explained, and it's vertical bearing capacity was studied in the base of the static pile load test data of the screw concrete piles. Constructed by two methody; a pre-digging shoe type construction method and a toe-jetting shoe type construction method. The vertical load bearing capacity of a screw pile constructed by the former was more about 70% than that of a screw pile constructed by the latter.

Problem and Improvement Measure of PHC Pile Construction (PHC파일 시공관리 문제점 및 개선방안)

  • Park, Tae-Kyu;Lee, Jung-Chul;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.344-348
    • /
    • 2008
  • During the last few years, the use of Pre-tensioned spun High strength Concrete(PHC) pile has been gradually increased in many construction sites such as super high-rise and large building construction. there is almost no specific code and/or standard described in the specifications to check verticality for Pre-tensioned Spun High Strength Concrete pile installation process. The most commonly used method for the vortical PHC pile installation is a naked-eye measurement or water level measurement conducted by assistant crew in the construction sites. And recent analysis results of the pile cutting work revealed that it frequently makes a lot of cracks which significantly reduce the strength of the pile and is very labor intensive work, thus requiring a large amount of additional time, costs, and efforts. The main objective of the research is to analize problems and to improvement. measure of PHC Pile Construction. The improvement measure present to the main problem with survey and discussion.

  • PDF

A Case Study on the Application of Low Vibration Explosives(LoVEX) in Tunnel Blasting (미진동화약을 적용한 터널발파 사례 연구)

  • Lee, Dong-Hoon;Park, Yun-Seok;Lee, Dong-Hee;Yoo, Joung-Hoon
    • Explosives and Blasting
    • /
    • v.30 no.2
    • /
    • pp.59-65
    • /
    • 2012
  • This study improved constructability and cost efficiency that are disadvantages of existing a mechanical excavation & similar blasting methods(plasma, gel, etc) and introduced cases of development and practical applications of Low vibration explosives(LoVEX) that minimizes blast vibration. The low vibration explosives(LoVEX) is suitable to Type-1 in standard blasting patterns of Ministry of Land, Transport and Maritime Affairs(MLTM) and delay blasting is possible. Moreover, the low vibration explosives improve construction and work efficiency while the level of vibration is reduced to about 60~70% of normal emulsion explosives. Additionally, this study suggested standard blasting patterns, the prediction equation of blasting vibration, and construction methods.

The Study on the Behavior of Closed-Faced Shield Tunneling by Two Dimensional Elasto-Plastic Analysis (2차원 탄소성해석에 의한 밀폐형 실드터널의 거동에 관한 연구)

  • 진치섭;이홍주;한상중
    • Computational Structural Engineering
    • /
    • v.9 no.4
    • /
    • pp.199-207
    • /
    • 1996
  • In the past decade soft clay shield tunneling technology have been improved to permit continuous support to the face of a tunnel. These advanced shield can be operated such that an initial heaving is created, this helps to decrease the inward soil movement into the tail void. In this paper, the measurement of slurry shield and EPB shield were used and two dimensional elasto-plastic programs EPSHILD developed for shield tunnel analysis were approved. The excavation steps corresponding with construction stages were settled and heaving load, load factors were considered. This study is based on the instantaneous settlement which is occured in the process of shield construction but not the secondary settlement by consolidation.

  • PDF

A study on the enlargement of 2-lane road tunnel under construction (시공중인 2차로 도로터널의 확장 방안에 대한 연구)

  • Choi, Hae-Jun;Kim, Dae-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.1
    • /
    • pp.33-50
    • /
    • 2011
  • Recently interest in enlargement of existing tunnel located in downtown or mountain area have been considerably increased along with requirements and discussion on the road-widening. Therefore, it is necessary to study the construction method and stability of tunnel to enlarge the existing tunnel in design. In this study, the design concept on the alignment, excavation method, reinforcement to enlarge the existing tunnel is described on the basis of the enlargement of 2-lane road tunnel under construction. This paper suggests a proper design method for the enlargement of an existing tunnel in useful practice.