• Title/Summary/Keyword: 굴착성

Search Result 1,052, Processing Time 0.024 seconds

A fundamental study of slurry management for slurry shield TBM by sea water influence (해수의 영향에 따른 이수식 TBM의 슬러리 관리를 위한 기초적 연구)

  • Kim, Dae-Young;Lee, Jae-won;Jung, Jae-Hoon;Kang, Han-Byul;Jee, Sung-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.3
    • /
    • pp.463-473
    • /
    • 2017
  • Bentonite swells when it comes into contact with water and makes it a viscous fluid. Thus it is widely used in civil engineering works for waterproofing. Utilizing the properties of bentonite, the slurry shield TBM supports excavated face with pressurized slurry as well as transporting excavated muck. When bentonite is in contact with seawater, due to the change of double layer thickness, its expandability and viscosity are lowered. This may cause problems for excavation stability and muck discharge due to the increase of sea water inflow when Slurry TBM is used under sea water conditions. In this study, the change of slurry condition caused by the inflow of sea water during tunnel excavation with Slurry TBM was investigated and a slurry management guideline was proposed. For this purpose, a laboratory test was carried out based on the slurry management criterions applied in the field, and a method applicable to the field where sea water is affected has been proposed.

Load transfer mechanism due to tunnel excavation in the jointed sandy ground (불연속면을 포함한 사질토 지반에서 터널 굴착에 따른 하중전이)

  • Lee, Sang-Duk;Kim, Yang-Woon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.3
    • /
    • pp.217-226
    • /
    • 2003
  • This study is focused on the finding out load transfer mechanism in the ground near the tunnel during tunnel excavation in the jointed sandy ground. Laboratory model tests were performed on various cases of the overburden heights above tunnel crown, location, and degree of discontinuity planes. For model tests, a movable plate was installed in the midst of the bottom of sandy ground. This plate, moving downwards, was intended to model the stress relaxation during tunnel excavation. The load transfer was measured at the fixed separated bottom plates adjacent to the movable plate. As the result, the loosening zone and the load-transfer form around the tunnelling site were affected by the overburden height and the characteristics of discontinuous planes. And large loosening zone was developed along the discontinuous planes which were close to the tunnel.

  • PDF

A Study on the Displacement Prediction Method using the Inverse Analysis Algorithm (역해석 알고리즘을 이용한 변위예측 기법에 관한 연구)

  • Park, Hyun-Jung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.4
    • /
    • pp.920-926
    • /
    • 2014
  • In this study, we applieorithmd the inverse analysis alg to the prediction of displacement shape in the example construction and verified the feasibility of suggested algorithm. For this purpose, as information processing knowledge in the field of IT is required and the need for convergence with the major is emerged, it is intended to try to apply the algorithm to the construction sector. Prediction of displacement shape is very important since it is related to the earth pressure of slurry wall and effecting on the safety of slurry wall after anchor removal. 3 levels of inverse analysis were applied to the slurry walls in 3 sites and compared the measured displacement shape with predicted displacement shape of the last excavation construction. As the predicted displacement shape was matched well with the measured one, the applied analysis algorithm in this study can be applied to the excavation construction.

Countermeasure against the Increse of Axial Force in Strut due to Thermal Load-A Case Study (온도하중에 의한 버팀보 축력증가 대책사례)

  • Kwon, Oh-Sung;Lee, Jong-Sung
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.193-198
    • /
    • 2006
  • 서울지하철 0호선 000 공구 000 정거장 구간은 버팀보 7단, 어스앵커 2단, 그리고 록볼트 3단의 개착식 가시설로 설계되어 있다. 버팀보 및 앵커 축력 계측을 위해 변형률계 및 하중계를 설치하고 연속계측 중, 4~6단 버팀보 수 개소에서 5월부터 하중이 급격히 증가하엿다. 따라서 굴착작업을 즉시 중단하고 관리기준치를 초과하는 하중이 계측된 STA.9k+750~800 구간의 5, 6단 버팀보 위치에 격간으로 총 20본(10본${\times}$2단), 그리고 STA.9k+900~920 구간의 7단 버팀보 위치에 격간으로 총 9본(9본${\times}$1단)의 버팀보를 추가적으로 설치 완료하였다. 이 때, 추가 버팀보는 선행하중잭을 이용하여 10ton의 선행하중을 재하하였으며, 향후 추가 보강 필요시 재하하중 증가가 가능하도록 조치하였다. 또한, 추가 설치된 버팀보, 그리고 이상하중이 발생된 버팀보에 계측기를 추가 설치하여 지속적으로 계측중이며, 띠장의 변위발생 구간은 스티프너 및 앵글 등을 응급조치하였다. 본 사례 연구에서는 보강 전.후의 계측결과 및 수치해석적 분석을 이용하여 가시설 굴착시 버팀보의 하중증가 원인 및 보강 효과를 규명하고, 향후 추가 굴착시의 안정성 여부를 검토해 보고자 하였다. 계측값 분석 결과, 추가버팀보 보강 후의 기존버팀보 축력 계측 결과 보강 직후 기존버팀보의 축력이 어느정도 감소하였으며, 이후 시간이 지남에 따라 축력이 더 이상 증가하지 않고 일정한 값에 수렴하는 경향을 보였다. 또한 수치해석 결과 온도 증가가 버팀보 축력증가에 미치는 영향은 버팀보 위치의 지반강성이 클수록 크며, 축력증가는 온도증가에 대체적으로 비례하였고, 추가버팀보의 보강 효과는 선행하중의 크기에 비례하는 것으로 나타났으며, 잔여굴착은 전반적으로 기존 버팀보의 축력 증가에 영향을 미치는 것으로 나타났다. 따라서 추가굴착시 지속적인 계측을 수행하며, 급격한 축력증가가 관찰될 경우 현재 보강된 버팀보의 선행하중 추가 재하, 굴착에 가장 큰 영향을 받는 최하단 버팀보의 추가보강 등의 대책방안을 제시하였다.

  • PDF

Analysis of ground behavior for model tunnel excavation with pipe roof reinforcement using close range photogrammetric technique (근거리 사진계측기법을 이용한 강관보강 모형터널굴착의 지반거동 분석)

  • Lee, Jung-Hwan;Lee, Yong-Joo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.4
    • /
    • pp.387-402
    • /
    • 2014
  • In congested urban areas, constructions of tunnel structures have became necessary due to a lack of surface space. The excavation of any tunnel generated the ground disturbances of surrounding ground and displacements is major concern. Therefore, a study of tunnel stability is necessary. In this study, the authors have investigated the stability and failure pattern of tunnel through the model tunnel test. In this study, the close range photogrammetry was used to measure the ground deformation. The measured data was converted to displacement vectors and contours. And then it compared to FE analysis and empirical formula. In addition, this study presented the comparison between steel pipe reinforced model tunnel and unreinforced model tunnel. The ground deformation for both the steel pipe reinforced model tunnel and the unreinforced model tunnel was analysed.

A study for calculating factor of safety against basal heave during circular vertical shaft excavation in clay considering 3D shape (3차원 형상을 고려한 점성토 지반 원형 수직구 굴착 중 히빙에 대한 안전율 산정을 위한 연구)

  • Kang, Seok-Jun;Cho, Gye-Chun;Kim, Jung-Tae;Kim, Han-Sung;Hong, Eun-Soo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.4
    • /
    • pp.717-729
    • /
    • 2018
  • Considering the stability of the ground in the process of excavation design is essential because there is a risk of basal heave due to the load of the surrounding ground during the vertical excavation. However, calculation of the factor of safety for basal heave should be performed with two-dimensional equation, and the equation cannot reflect three-dimensional shape of vertical excavation. In this study, an equation for factor of safety for the basal heave was proposed with considering the effect of three-dimensional shape. It is confirmed that the equation can more appropriately reflect the basal heave stability 3D circular vertical excavation than the existing equation. Using the equation proposed in this study, it is possible to derive an appropriate factor of safety according to the 3D excavation shape during the circular vertical shaft excavation.

Development of penetration rate prediction model using shield TBM excavation data (쉴드 TBM 현장 굴진데이터를 이용한 굴착속도 예측모델 개발)

  • La, You-Sung;Kim, Myung-In;Kim, Bumjoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.4
    • /
    • pp.519-534
    • /
    • 2019
  • Mechanized tunneling methods, including shield TBM, have been increasingly used for tunnel construction because of their relatively low vibration and noise levels as well as low risk of rock-falling accidents. In the excavation using the shield TBM, it is important to design penetration rate appropriately. In present study, both subsurface investigation data and shield TBM excavation data, produced for and during ${\bigcirc}{\bigcirc}{\sim}{\bigcirc}{\bigcirc}$ high-speed railway construction, were analyzed and used to compare with shield TBM penetration rates calculated using existing penetrating rate prediction models proposed by several foreign researchers. The correlation between thrust force per disk cutter and uniaxial compressive strength was also examined and, based on the correlation analysis, a simple prediction model for penetration rate was derived. The prediction results using the existing prediction models showed approximately error rates of 50~500%, whereas the results from the simple model proposed from this study showed an error rate of 15% in average. It may be said, therefore, that the proposed model has higher applicability for shield TBM construction in similar ground conditions.

Time-lapse Geophysical Survey Analysis for Field-scale Test bed of Excavation Construction (실규모 굴착 시험장에서의 시간경과 물리탐사 자료 분석)

  • Shin, Dong Keun;Song, Seo Young;Kim, Bitnarae;Yoo, Huieun;Ki, Jung Seck;Nam, Myung Jin
    • The Journal of Engineering Geology
    • /
    • v.29 no.2
    • /
    • pp.137-151
    • /
    • 2019
  • Geophysical exploration techniques are effective for monitoring changes in the ground condition around the excavation project to prevent subsidence risks during excavation work, therefore, improving analysis techniques is required for applying and supplementing various geophysical exploration technologies. In this study, a field-scale on-site test was conducted to detect possible ground subsidence hazards and areas of relaxation zone that may occur during excavation work and due to underground water level changes. In order to carry out the field test, a real-scale excavation test bed was constructed and the geophysical exploration methods, such as electrical resistivity survey and multi-channel analysis of surface wave (MASW) survey for urban sites condition, have researched for optimal geophysical exploration parameter, design and correlation analysis between the results by reviewing the validity of each individual geophysical exploration and modeling. The results of this study showed the impact of each geophysical exploration on the relaxation zone and, in particular, the location of the underground water surface and the effects of excavation were identified using electrical resistivity survey. Further research on modeling will be required, taking into account the effects of excavation and groundwater.

Study on Structural Stability Analysis of Excavation Stage Considering Excavation Process and Supporting Materials in Room-and-Pillar Underground Space (격자형 지하공간에서 굴착 공정과 지보재를 고려한 굴착 단계별 구조 안정성 해석 연구)

  • Soon-Wook, Choi;Soo-Ho, Chang;Tae-Ho, Kang;Chulho, Lee
    • Journal of the Korean Geosynthetics Society
    • /
    • v.21 no.4
    • /
    • pp.21-29
    • /
    • 2022
  • The room-and-pillar method or grid-type underground space is a method of forming a space by excavating the excavation part at regular intervals so that it is orthogonal and using natural rock mass as a structure. Such excavation may appear different in size from the excavation stage where the maximum displacement occurs depending on the excavation direction and sequence. In this study, considering the installation of support materials such as shotcrete and rock bolts for the optimal design of the excavation process, the safety and constructability of the design and construction of the grid-type underground space under specific ground conditions were analytically reviewed. The ground conditions were set using an numerical method, and the stress at pillar and displacement at center of room were considered for each excavation stage and construction type under a constant surcharge. The height of the space was 8m, which was set higher than the size of a general office, and was reviewed in consideration of equipment and plant facilities. In addition, the degree of displacement control according to the installation of support materials was reviewed in consideration of shotcrete and rock bolts.

Feedback Analysis Technique for Tunnel Safety by Using Displacements Measured during the Tunnel Excavation (터널굴착변위를 활용한 시공중 피드백 해석기법 연구)

  • Park, Si-Hyun;Shin, Young-Suk
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.1
    • /
    • pp.81-89
    • /
    • 2008
  • The purpose of this study is to develop a new technique to quickly assess the quantitative stability of a tunnel by using measured displacement at the tunnel construction site. To achieve this purpose, in this study, a critical strain concept was introduced for the first time and applied to an assessment of a tunnel under construction. The new technique calculates numerically the strains of the surrounding ground by using displacements measured during tunnel excavation. The techniques considering the relative displacement, shotcrete, and anisotropic characteristics of ground were newly introduced after reinvestigating the existing analysis technique. In addition, an analysis module was developed based on the proposed analysis technique in this study, and the applicability of the developed module was verified. To verify the module, first of all, the calculated excavation displacements of a cylindrical tunnel by analytic method and commercial programs (Pentagon-3D, Flac-2D) were compared for the confirmation of applicability of commercial programs. Then, the calculated excavation displacements under the same initial condition, both with and without a shotcrete lining, by two commercial programs were compared. finally, we assess the load condition and material properties of in-situ ground by inputting tunnel excavation displacement, which was calculated by a commercial program, into the developed analysis module (FAST-Ver. 1.2, feedback Analysis System for Tunneling), and checked whether the assessed results conform to the originally assumed values.