• Title/Summary/Keyword: 국유림경영정보시스템

Search Result 4, Processing Time 0.025 seconds

A Study on the Improvement of Evaluation System for Implementation of National Forest Management (국유림경영계획 실행평가 제도 개선방안에 관한 연구)

  • Kim, Damin;Lim, Chul-Hee;Lee, Woo-Kyun;Song, Cholho
    • Journal of Korean Society of Forest Science
    • /
    • v.104 no.4
    • /
    • pp.640-648
    • /
    • 2015
  • National forests have been assumed to do a leading role in carbon sequestration and creating forest resources since society demanded it due to climate change. Therefore, it is needed to check whether a national forest management plan and its evaluation are implemented effectively. As an effective planning and management is to be ensured on the basis of proper evaluation system, this research suggests to improve the evaluation system by analyzing it theoretically. Improvements for national forest management plan and its evaluation are as follows: (1) adjusting evaluation goal and time; (2) giving weighting to each work when planning; (3) writing details of change in planning and its grounds; (4) using the national forest management information systems to integrate these evaluation methods and result. Since to predict future changes in forests and achieve sustainable forest management begins at the reliable evaluation for overall process of the implemented project, the significance of this study is in proposing the improvement of evaluation system for national forest.

Development of Estimation Equation for Minimum and Maximum DBH Using National Forest Inventory (국가산림자원조사 자료를 이용한 최저·최고 흉고직경 추정식 개발)

  • Kang, Jin-Taek;Yim, Jong-Su;Lee, Sun-Jeoung;Moon, Ga-Hyun;Ko, Chi-Ung
    • Journal of agriculture & life science
    • /
    • v.53 no.6
    • /
    • pp.23-33
    • /
    • 2019
  • In accordance with a change in the management information system containing the management record and planning for the entire national forest in South Korea by an amendment of the relevant law (The national forest management planning and methods, Korea Forest Service), in this study, average, the maximum, and the minimum values for DBH were presented while only average values were required before the amendment. In this regard, there is a need for an estimation algorithm by which all the existing values for DBH established before the revision can be converted to the highest and the lowest ones. The purpose of this study is to develop an estimation equation to automatically show the minimum and the maximum values for DBH for 12 main tree species from the data in the national forest management information system. In order to develop the estimation equation for the minimum and the maximum values for DBH, there was exploited the 6,858 fixed sample plots of the fifth and the sixth national forest inventory between in 2006 and 2015. Two estimation models were applied for DBH-tree age and DHB-tree height using such growth variables as DBH, tree age, and height, to draw the estimation equation for the maximum and the minimum values for DBH. The findings showed that the most suitable model to estimate the minimum and the maximum values for DBH was Dmin=a+bD+cH, Dmax=a+bD+cH with the variables of DBH and height. Based on these optimal models, the estimation equation was devised for the minimum and the maximum values for DBH for the 12 main tree species.

Estimation of Forest Management Ratio under Article 3.4 of the Kyoto Protocol: A Case Study on the Chungcheongbuk-do (교토의정서 제3조 4항의 산림경영율 추정방안 및 사례분석 - 충청북도를 대상으로 -)

  • Kim, Hyungho;Kang, Hyeondeug;Kim, Rae Hyun;Kim, Cheol Min;Koh, Kwang Chul;Lee, Kyeong Hak
    • Journal of Korean Society of Forest Science
    • /
    • v.102 no.4
    • /
    • pp.608-616
    • /
    • 2013
  • The objective of this study was to suggest contingent valuation method, simple random sampling method, systematic sampling method, maximum practice area method, and overlay practice area method as the estimation methods for forest management area to estimate carbon dioxide sink by forest management as stated in Article 3.4 of the Kyoto Protocol. A case study for Chungcheongbuk-do was performed using maximum practice area method which was thought of as the most rational method within MRV(Measurable, reportable and verifiable). The forest management ratio was defined as forest management area over the total forest area. Based on the definition of forest management activity, forest area was divided into practice forest land and non-practice forest land. The area of forest mangement for practices was based on the 'National Forest Management Information System' and the history of practices from the 'Proposals on Private Management Information Database'. The area of forest management for non-practices was based on the public used forest land from 'Categorial map of forest land'. It was shown that the forest management area of Chuncheongbuk-do was 115,566 ha for practice forest land, and 131,008 ha for non-practice forest land. The forest managent ratio was 49.7% of the total forest area of 495,806 ha. This study made possible to the estimation of the forest management ratio under Kyoto Protocol, and had an advantage in searching for a practical method of forest management plan in which the forest management ratio could be enhanced.

Analysis on the Status of Joint Forestry Project in National Forest (국유림 공동산림사업 실태분석에 관한 연구)

  • Kim, Dong-Hyeon;Ko, Chi-Ung;Kim, Dong-Geun
    • Journal of agriculture & life science
    • /
    • v.53 no.6
    • /
    • pp.45-53
    • /
    • 2019
  • The purpose of this study is to analyze the status of the joint forest project, which is one of the national forest management system, by using stakeholder participation, transparency of decision making, accountability of actors and stakeholders, The questionnaire survey was conducted using the 5 - point scale and the written form. As a result of the questionnaire survey, various stakeholder participation items had the highest opportunity to participate with an average of 3.3 and the lowest score with 2.3 points for establishing conflict and conflict resolution structures. Transparency was analyzed to be 3.4 points for the project disclosure, 2.7 points for information sharing and education promotion activities for local residents, 3.3 points for the detailed role of the project implementer, and 2.7 points for internal and external monitoring and evaluation of the project with various stakeholders. The results of this research, analyzed through the participatory forest management index, are deemed to be used as basic data for the establishment of a plan for the revitalization of national forest participation management.