• Title/Summary/Keyword: 구조물 공사

Search Result 737, Processing Time 0.028 seconds

Structural Analysis Methods for RC Building Demolition Work under Heavy Equipment Loading (해체공사 실무자를 위한 기계식 해체대상 RC구조물의 해석기법 제안)

  • Park, Seong-Sik;Lee, Bum-Sik;Park, Ji-Young;Kim, Hyo-Jin;Sohn, Chang-Hak
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.569-575
    • /
    • 2011
  • In domestic mechanical demolition work against RC building, unsuitable selection and loading of heavy equipment have led to occasional accidents such as collapse of structural members during the work. Therefore, proper analysis technique to easily decide allowable equipment load on the structure is needed at the planning stage of mechanical demolition work. In this paper, performing loading test and elastic analysis against 4-story building at full scale, we confirm appropriateness for allowable load of equipment on RC structures, which was suggested in previous study, and suggest structural analysis method that can evaluate safety of RC building during the mechanical demolition. The suggested method can be effectively utilized to improve work efficiency through safety of mechanical demolition work against RC building and proper management of equipments.

Necessity of Improvements on Code of Practice at the Demolition Work considering Building Structure Type : Based on Demolition work of Permission and Registration (건축물의 구조유형을 고려한 해체공사 제도 개선 방안 필요성 - 해체공사의 허가 및 신고를 기준으로 -)

  • Shim, Yukyung;Jeong, Jaewook;Lee, Jaehyun;Jeong, Jaemin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.66-74
    • /
    • 2020
  • To prevent incident of demolition work the Building Management Act was implemented to manage demolition work. According to this law, buildings with the scale upper than 500㎡ of floor area are classified as permission to conduct the demolition work, however it may be hard to perform safety management at demolition work. In addition, the risk level of demolition work is varied with related to the structure type. So, the purpose of this study is to suggest the improvements of criteria on demolition work considering building structure types including small-scale structures such as masonry, wooden, and other structure. The research process was conducted by three steps. (I) Application of Building Management Act; (II) Analysis of demolition work by structure types; and (III) Subdivision of permission targets by building structure types. The result of this study, permission ratio was only 10% for total demolition work and 2.43% for masonry. Because the masonry, wooden, and other structure types are concentrated on a floor area of small-scale, the separate criteria of demolition work is need to prevent the accident and fatal incident. Through the results, the decision maker can be utilized (1) For the special building structure types, the criteria of enhanced safety management are applied by referring to the overseas law ; and (2) The demolition work can be considered by the criteria of separate permission in terms of structure types.

Development of Risk Breakdown Structure of Nuclear Power Plant Decommissioning Project: Focusing on Structural Damage / Work Process Risks (원전 차폐 콘크리트 구조물 제염해체공사 리스크 분류체계 구축: 구조적 / 작업 리스크를 중심으로)

  • Kim, Byeol;Lee, Joo-Sung;Ahn, Yong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.3
    • /
    • pp.38-45
    • /
    • 2018
  • The purpose of this study is to deduct the structural damage / work process risks factors which can be occurred during the decommissioning in the NPP containment concrete structure. To achieve these purpose, risk profile specified in the construction industry is analyzed, and the work process of NPP decommissioning and the construction project were matched based on the similarity of each works. Accordingly, human and physical risk factors are classified. Finally, the risk associated with the building structure and work process was classified as per their process activities, and risk typology explaining the disaster which put the structure, equipments, machine and workers in serious danger was developed.

Survey on the status of discarded structures for securing continuity of the river aquatic ecosystem - Focus on Wangsukcheon in the Han river area (하천 수생태계 연속성 확보를 위한 용도폐기 구조물 현황 조사-한강권역 왕숙천 수계 중심으로)

  • Lee, Sang-Hoon;Ahn, Hong-Kyu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.447-447
    • /
    • 2021
  • 인간이 농업 등으로 물을 사용하기 위하여 하천에 인위적으로 구조물을 설치하여야 한다. 이들 구조물은 대부분이 농업용 보로 과거 농업중심의 사회에서 논과 밭 등에 물을 공급하기 위하여 설치하였다. 하지만 농촌의 도시화 및 농지의 변경 등으로 인하여 농업용 보는 사용량이 감소하였으며, 최근 급격한 도시화로 인하여 많은 보들이 용도폐기 되었다. 한국농어촌공사에서는 매년 용도폐기된 구조물을 확인하고 있으며, 이에 대한 리스트를 보유하고 있다. 본 연구에서는 한국농어촌공사의 용도폐기 된 보 중 한강권역 왕숙천 수계 중심으로 조사를 실시하였다. 폐기보에 대한 위치 확인을 위하여 한국농어촌공사로부터 제공받은 폐기보 현황자료(보명 및 하천명, 주소)를 바탕으로 우리가람길라잡이, 국가어도정보시스템, 웹지도 등을 활용하여 위치 및 존재 여부 파악하였으며, 현장조사를 위하여 위치분석 자료를 바탕으로 현장조사가 용이하도록 별도의 웹자료를 구축하였다. 현장조사는 구조물의 주변의 토지이용현황, 구조물의 존재여부, 구조물의 규모 실측(길이/높이/폭 등), 어도의 유무, 바닥보호공의 유무, 구조물 훼손 정도 등을 파악하였다. 왕숙천 수계의 보는 왕숙천 본류구간에는 4개의 폐기보가 있으며, 용암천은 9개, 사능천은 2개 학림천은 1개로 총 16개의 폐기보가 있는 것을 확인되었다.

  • PDF

Numerical Analysis of Retaining Wall Considering Supporting Load of Adjacent Retaining Wall (인접 흙막이 구조물의 지보재 하중을 고려한 가시설의 수치해석)

  • Yoo, Chanho;You, Jaemin;Lee, Seungjoo;Hwang, Jungsoon;Baek, Seungcheol
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.1
    • /
    • pp.31-36
    • /
    • 2018
  • Recently, as the building construction works have been activated, the environment in which the excavation work is proceeding in parallel with the existing structure and the adjacent excavation work is increasing. However, there is not a lot of research on this. In this study, numerical analysis was carried out for interaction analysis between former excavation construction and follow-up excavation on two excavation retaining structures in parallel with excavation. As a result of numerical analysis, if the supporting load of strut is not considered, it was analyzed that the displacement distribution in the structure can be underestimated and acting stress of strut is overestimated. It was analyzed that the support stress causes by the former excavation should be considered in order to simulate the actual behavior characteristic.

Case Study of Explosive Demolition of Airport Structure (김해국제공항 구 국제선 청사 발파해체 시공 사례)

  • 이윤재;송영석;정민수;권오성;강대우
    • Explosives and Blasting
    • /
    • v.21 no.3
    • /
    • pp.37-48
    • /
    • 2003
  • 김해 국제공항 2단계 확장 공사 중 구 국제선 청사 발파해체공사"는 5.5초의 기폭시차를 두고 약 7초간에 구조물의 붕괴를 유도하여, 단기간에 안전하며 최대의 효율을 낼 수 있는 발파해체공법을 적용하여 시공하였다. 이에 따라 발파해체공사의 공법, 공정, 세부 현황 및 결과, 발파공해영향권에 대해 분석, 평가 하였다. 구 국제선청사 구조물은 3층 높이로 저층 구조물에 해당하고 구조물의 특성상 Span 간격이 길고 충고가 높다. 또한 지반이 액상한계점 상태까지 도달하여 구조안전진단 결과 위험등급인 D등급으로 판정되었다. 본 대상건물과 같이 충고는 낮지만, 구조 안전성 측면에서 위험 요소를 가지고 있으므로 발파공법을 적용하여 해체를 실시하였다.

Fluid force coefficient of Imwon port accoding to 3-D hydraulic model test (3차원수리모형실험을 통한 임원항의 파력산정계수(α) 도출)

  • Yoon, Jae Seon;Jung, Jae-Sang;Ryu, Im-Do;Song, Hyun-Gu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.255-255
    • /
    • 2015
  • 지진해일은 주기가 긴 파랑으로 방파제나 방호구조물에 의한 에너지 감소가 작은 특성이 있다. 또한, 범람구역의 구조물 밀집도 및 지형적 요인에 따라 범람영역, 침수심, 파력 등이 상이하게 나타나므로 유체흐름의 입체적 변화양상을 고려하여야 한다. 본 수리모형실험은 임원항을 대상으로 구조물에 작용하는 지진해일의 파력특성을 3차원수리모형실험을 통해 검토하고, 파력산정계수(${\alpha}$)를 제시한다. 3차원 수리모형실험은 1983년 동해 중부 지진해일 발생 시 국내에서 가장 큰 피해를 입은 임원항을 대상으로 배후부지의 구조물과 인근 해안의 지형을 1/100으로 재현하여 실험에 임하였다. 입사파랑은 고립파(solitary wave)로 재현하였으며, 천수(shoaling)에 의한 파고변화를 측정하고 그에 따른 배후부지의 침수심, 구조물에 작용하는 파력을 측정하였다. 분석된 파력 산정계수(${\alpha}$)는 임원항 인근 해역 및 배후부지의 방재대책 수립을 위한 기초자료로 활용될 것으로 판단된다.

  • PDF

Analysis of Floor Slab and Support for the Shortening of Construction Time in High-Rise Wall-Type Apartment Building (고층벽식구조 아파트에서 골조공사 공기단축을 위한 바닥 슬래브 및 지주의 해석)

  • Kim, Young-Chan;Kwon, Ki-Sang
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.1
    • /
    • pp.141-147
    • /
    • 2002
  • 국내 주거의 주종인 아파트의 구조형식은 벽식 철근콘크리트조로 경제성 때문에 대부분 고층으로 지어지고 있다. 철근 콘크리트구조 건물을 구체공사비중 상당부분이 거푸집공사에 투입되고 있다. 구체공사의 공기(工期)는 층당 소요일수로 산정할 수 있는데 공사비 절감 및 공기단축을 통한 시공효율상의 향상을 위해서는 지주시스템의 효율적인 전용(轉用)이 필수적이라 할 수 있다. 본 연구에서는 벽식구조 아파트의 현장조사를 토대로, 현재 사용되고 있는 지주시스템 및 바닥슬래브에 대한 응력해석을 수행하고, 이를 분석하여 공기단축의 가능성을 검토하였다.

거푸집공사의 재해 위험성 평가에 관한 연구

  • 오준호;고성석
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2002.05a
    • /
    • pp.109-114
    • /
    • 2002
  • 건설공사의 공종 중 거푸집공사는 전체공사기간의 대략 25%를 차지하고 있으며 공사비 비율은 일반적으로 전체공사비의 10~15%, 철근콘크리트공사비의 20~30%를 차지하고 있어 구조물의 안전성, 경제성 및 작업성과 품질관리에 중요한 역할을 한다. 또한 거푸집은 콘크리트가 양생되면 곧 해체되는 가설구조물로써 작업상에서 많은 위험요소를 포함하고 있으며 특히, 아파트공사의 경우 전체 재해발생의 17%로 가장 높은 비율을 차지하고 있다. 이와 같이 거푸집공사는 가장 우선적으로 관리하여야 할 위험공종이며 전체공기를 좌우하는 주공정으로서 이를 재해발생의 측면에서 제어하는 것이 안전관리에 있어서 가장 효율적이며 큰 효과를 나타낼 수 있는 것으로 생각된다.(중략)

  • PDF

Evaluation of Structural Stability of Tunnel due to Adjacent Excavation on Urban Transit (도시철도 인접굴착공사에 따른 터널구조물의 구조 안정성 평가)

  • Choi, Jung-Youl;Lee, Ho-hyun;Kang, You-Song;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.503-508
    • /
    • 2020
  • The three-dimensional precision numerical analysis was performed using the finite element model applied with the railway track model consisting of rails, As a result of analyzing the track deformation level of the existing tunnel due to the excavation work adjacent to the urban transit, it was found that the evaluation criteria (allowed values) of conventional railways lines were satisfied. Based on the numerical analysis, it was analyzed that the results of the prediction of the tunnel structural stability of due to the excavation work and the level of the tunnel deformation occurring at the actual site could be approximated as closely as possible.