A Competitive Advantage Analysis of Construction Duration through the Comparison of Actual Data of Domestic Construction Firms - Focused on Mix-Use Residential Building and Officetel Building - (건설사별 공기비교를 통한 공기경쟁력 분석 - 주상복합 및 오피스텔 건물을 중심으로 -)

  • Ryu, Han-Guk;Kim, Sun-Kuk;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.138-147
    • /
    • 2006
  • Construction companies have been interested in the construction duration which importantly affects the performance and the success of the construction projects in accordance with the systemic changes such as five days per week system, introduction of construction duration reduction bidding system and post sale system nowadays. It is also very important to estimate and forecast properly the construction duration as the construction companies compete for the projects in the situation of construction market reduction and the lowest bidding system. Recognizing the importance about the construction duration, the researches about comparing and analyzing or estiamting the construction duration have been performed. However, comparing studies about the construction duraion have been limited to the apartment and office building in domestic area. Many studies about forecasting construction duration have been performed through stochastic analysis and simulations. Little research has been addressed the comparison analysis of the real construction duration about the mix-use building and officetel building which occured according to the changes of the building requirements. Therefore, the objective of this study is to compare and analyze the real construction duration and the hypothetical construction duration about the mix-use building and officetel building of the domestic companies. Moreover, we select the most competitve construction company to get the strengths and analyze the competitive advatages of the construction companies about construction duration.

건유우의 사양관리

  • 노상호
    • 월간낙농육우
    • /
    • v.21 no.1 s.225
    • /
    • pp.130-134
    • /
    • 2001
  • 건유우관리와 관련된 사항을 요약해 보면 다음과 같다. 1. 수정일과 분만일을 정확히 기록한다. 2. 착유후기에 적절한 사료급여로 건유직전에 BCS를 3.5 수준에 맞춘다. 3. 건유기간은 소에 EK라 45$\~$60일 사이로 정한다. 4. 충분한 조사료와 분만시 적절한 신체상태유지를 위해 약간의 농후사료를 공급한다. 5. 광물질과 비타민을 충분히 공급한다. 6. 분만 3주전부터는 3$\~$6kg의 농후사료를 급여하

  • PDF

동물약사

  • Korea Animal Health Products Association
    • 동물약계
    • /
    • no.103
    • /
    • pp.2-3
    • /
    • 2005
  • 동물용의약품 등 수입관리자 신규승인 / 동물용의약품 등 제조업 휴업기간 연장 신고 / 동물용의약품 등 제조업 허가사항 변경 / 동물용의약품 등 수입자 확인사항 변경 / 동물용의약품 품질관리우수업체 신규지정 / 마약류관리에관한법률시행령 개정 / 동물용의약품 자율점검제 추진

  • PDF

기획 /최상의 e-비즈니스 업무 환경 해결사로 등장한 'CMS'

  • Korea Database Promotion Center
    • Digital Contents
    • /
    • no.8 s.99
    • /
    • pp.70-74
    • /
    • 2001
  • 일반 웹 콘텐츠 뿐만 아니라 그룹웨어,ERP,CRM 등 기간 시스템에 이르기까지 모든 디지털 정보를 통합 관리해 주는 솔루션이 콘텐츠 관리시스템(CMS:Content Management System)이다. 최근 인터넷을 통한 다양한 서비스와 전자상거래가 발전함에 따라 웹사이트를 구성하는 콘텐츠의 양도 급속도로 증가하고 있다.

  • PDF