• Title/Summary/Keyword: 관리프로세스 비효율

Search Result 152, Processing Time 0.029 seconds

A Study on the improvement method for Idea from the design VE using ASIT (ASIT 기법을 활용한 설계VE 아이디어 개선방안에 관한 연구)

  • Lee, Gun;Go, Seong-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1023-1028
    • /
    • 2007
  • It is the most important thing of the overall VE that we create inventive ideas from idea phase in the design VE. However, it is hard that it take a long time and create a superior idea using Brainstorming. And, it was real to lodge an alternative plan proposed on the idea thinking phase, it is true that an alternative plan of existing simply costdown apply to a change and insert isn't different from an inventive idea deduction. Also creating alternative idea, many expert hold on to only his field and it was exposed a limit depend on a team's experience or intuition than technical solution. In this study, we analyzed the problem of the present design VE processing and analyzed the problem through a survey to an expert, and then we'll suggest a possibility for an efficient design VE.

  • PDF

Opportunity Tree Framework Design For Optimization of Software Development Project Performance (소프트웨어 개발 프로젝트 성능의 최적화를 위한 Opportunity Tree 모델 설계)

  • Song Ki-Won;Lee Kyung-Whan
    • The KIPS Transactions:PartD
    • /
    • v.12D no.3 s.99
    • /
    • pp.417-428
    • /
    • 2005
  • Today, IT organizations perform projects with vision related to marketing and financial profit. The objective of realizing the vision is to improve the project performing ability in terms of QCD. Organizations have made a lot of efforts to achieve this objective through process improvement. Large companies such as IBM, Ford, and GE have made over $80\%$ of success through business process re-engineering using information technology instead of business improvement effect by computers. It is important to collect, analyze and manage the data on performed projects to achieve the objective, but quantitative measurement is difficult as software is invisible and the effect and efficiency caused by process change are not visibly identified. Therefore, it is not easy to extract the strategy of improvement. This paper measures and analyzes the project performance, focusing on organizations' external effectiveness and internal efficiency (Qualify, Delivery, Cycle time, and Waste). Based on the measured project performance scores, an OT (Opportunity Tree) model was designed for optimizing the project performance. The process of design is as follows. First, meta data are derived from projects and analyzed by quantitative GQM(Goal-Question-Metric) questionnaire. Then, the project performance model is designed with the data obtained from the quantitative GQM questionnaire and organization's performance score for each area is calculated. The value is revised by integrating the measured scores by area vision weights from all stakeholders (CEO, middle-class managers, developer, investor, and custom). Through this, routes for improvement are presented and an optimized improvement method is suggested. Existing methods to improve software process have been highly effective in division of processes' but somewhat unsatisfactory in structural function to develop and systemically manage strategies by applying the processes to Projects. The proposed OT model provides a solution to this problem. The OT model is useful to provide an optimal improvement method in line with organization's goals and can reduce risks which may occur in the course of improving process if it is applied with proposed methods. In addition, satisfaction about the improvement strategy can be improved by obtaining input about vision weight from all stakeholders through the qualitative questionnaire and by reflecting it to the calculation. The OT is also useful to optimize the expansion of market and financial performance by controlling the ability of Quality, Delivery, Cycle time, and Waste.

Design and Implementation of a Mobile Framework for Efficient Inventory Management of Refrigerated Warehouses (효율적인 냉동창고 재고관리를 위한 모바일 프레임워크의 설계 및 구현)

  • Ban, ChaeHoon;Kim, DongHyun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.17 no.2
    • /
    • pp.341-346
    • /
    • 2013
  • Refrigerated warehouse inventory management program which manages the logistics of shipping&receiving and inventory quickly and accurately is a costly and labor-intensive maintenance because it is operated in the legacy system on a closed client-server environment. There are no services available for consignees who are the consumers of refrigerated warehouses except fax or phone for orders which makes the business process inefficient and creates many problems such as error and inaccuracy. In this paper, we design and implement a mobile framework with a legacy system supporting various services to the consignees for solving problems of outdated legacy systems and no services to use. The system supports promptness and accuracy which give the users improved satisfaction by providing orders and queries of inventory for the consignees on mobile devices.

Workflow Procedures and Applications in BIM-based Design for Safety (DfS) (BIM 기반 설계안전성검토의 업무 절차와 활용 방안에 관한 연구)

  • Jaewoong Hwang;Heetaek Yoon;Junhyun Bae;Youngkon Park
    • Land and Housing Review
    • /
    • v.15 no.2
    • /
    • pp.125-137
    • /
    • 2024
  • A conventional Design for Safety (DfS), introduced to eliminate potential hazards in the design phase proactively, has encountered persistent challenges, such as perfunctory risk assessments and hazard identifications based on 2D drawings and inefficient workflow processes. This study proposes a BIM-based approach to Design for Safety (DfS) to address the limitations of conventional methods, aiming to enhance efficiency and achieve practical safety management benefits. The proposed workflow process for BIM-based DfS has been refined and validated for on-site applicability through various case studies, including risk assessments during the design phase and field applications for safety management activities during the construction phase. Specifically, the critical process of risk assessment within the DfS methodology has also been transitioned to a BIM-based approach. This BIM-based risk assessment process has been evaluated through case studies, encompassing safety reviews for structural design, construction equipment operation, and construction methodology with sequence in design projects. Additionally, the proposed BIM-based DfS has demonstrated exceptional on-site applicability and efficiency, as validated by the application of a BIM deliverable embedded in DfS information for CDE-based daily activity briefing, VR-based safety training, AR-based mitigation measures inspections, and other safety management activities in the construction phase.

Reusability Enhancement of the MND-AF Artifacts in the Defense-CBD Methodology (국방 CBD 방법론에서 MND-AF 산출물 재활용성 제고)

  • Lee Hyun-Chul;Lee Sang-Ho;Jung Gyung-Chul;Lee Sung Jong
    • The KIPS Transactions:PartD
    • /
    • v.12D no.7 s.103
    • /
    • pp.1001-1006
    • /
    • 2005
  • The Ministry of National Defense has developed MND-AF and Defense-CBD methodology to make the integration and management of standardization effective through enhancing the interoperability and reusability of information systems. Yet no explicit guidelines or procedures have not been developed for the applying range and mutual relationship of the artifacts between MND-AF and Defense-CBD methodology. Thus, the development time is unnecessarily extended and budget also is increasing because both methodologies produce the artifacts respectively. This paper presents a reusability enhancement scheme for producing MND-AF artifacts according to Defense-CBD process by analyzing artifacts of two methodology les at each element level, so that it will reduce the overhead of producing the artifacts and enhance the completeness of the artifacts. In result, in the case of applying Defense-CBD methodology for developing a information system34 artifacts out of 37 MND-AF artifacts can be reusable.

Proposal of a Vender Management System in the Procurement Management of Plant Projects (플랜트 구매조달관리를 위한 공급자관리 시스템 개발 방향 제시)

  • Woo, Ji-Youn;Lee, Jun-Bok;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.991-994
    • /
    • 2007
  • Since the year of 2003, the overseas plant market has grown by an average of 6% per year. It is because of the increase of oil-money, economic growth of BRICs, and the result of heavy competition among the countries which demands a great amount of resources for the purpose of resource securing. Such a situation is expected to be continued for a while. The procurement is one of critical functions for successful completion of a plant project. For effective procurement, it is required to manage vendor's information efficiently. But most of the vendor management systems deal with simple general information and performance data about vendors. In this sense, this paper proposes a vendor management system which can be used within a decision-making system. The system uses existing DB and makes the close relationship with the vendors. This paper will also reduce risks and difficulties in the process of selecting the proper vendors and will increase efficiency of procurement process in electronic bidding between companies.

  • PDF

A Study on Asset Valuation Method for Road Facilities Maintenance (도로시설물의 자산관리를 위한 자산가치평가방법에 관한 연구)

  • An, Jae-Min;Park, Jong-Bum;Lee, Dong-Youl;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.141-151
    • /
    • 2012
  • Infrastructure are the essential element in the country for they are the basic facilities forming the basis of economic activity. In Korea Infrastructure which are subject to the management of government are increasing annually, and subsequently the budget of maintenance costs is expected to rise significantly. For the effective management of the constructed and accumulated infrastructure, the integrated management of the future assets will be needed which includes the determination of the asset status, management subjects, and the location, the maintenance of their performance and state, and the prediction of the cost required to increase their useful lifetime. However, in the domestic cases the road facilities valuation has not been done systematically, and the preparation and research on this is scarce. Thus, the systematic procedure for the road facilities valuation is required. In this paper the following study was conducted to derive the reasonable asset valuation methods. First, the valuation methods was investigated and summarized throughout the domestic and international research literature. Second, to apply the investigated valuation methods to the road facilities the valuation process that reflects domestic conditions and characteristics has been developed. Third, a working Bridge, Highways, and General national ways were applied to the general valuation process, and the results were analyzed. As a final step a schematic diagram of the asset management support by WDRC valuation method was presented.

The flow of Temporary Facility Planning Information in High-rise Building Construction (고층건축공사에서의 가설계획 정보흐름)

  • Yoon You-Sang;Lee Hyung-Soo;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.91-96
    • /
    • 2002
  • The purpose of this study is to present a systemized flow of temporary facility(TF) planning information. The current TF planning tends to be established by subjective decision making of field workers. Therefore TF planning needs more systemized information flow to provide a reliable schedule. The study was implemented through interview with experts for reliable TF planning. The main contents of the study are as follows; 1) TF planning process model(IDEF0) are established. 2) Various information flow diagrams proposed to support TF planning decision-making. The study recommends that, as a future research, the computer system be developed for application of the information flow.

Methodology for Intercepting the Ransomware Attacks Using File I/O Intervals (파일 I/O Interval을 이용한 랜섬웨어 공격 차단 방법론)

  • Youn, Jung-moo;Jo, Je-geong;Ryu, Jae-cheol
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.26 no.3
    • /
    • pp.645-653
    • /
    • 2016
  • Ransomware was first created in 1999, but its existence become widely known in Korean by 2015. As information and communication technology have developed, the storage capacity of computer has enlarged, it accordingly is getting more important to effectively manage these information, rather than the information itself. In such situation, the ransomware break into other people's computer and encrypt an files without a user's permission. So, it adversely affect the user. In this paper, we monitor an access of a specific process to the file. And on the basis of this monitoring information, we detect whether the abnormal approach happened. Through the detection result, we block the permission about access to the file for a specific process. Using this method, we propose a blocking technique for the ransomeware's abnormal approach and encryption to the files.

A Efficient Strategy to Schedule Packets in Channel based Network (고속의 채널 기반 네트웍에서 효율적인 패킷 스케줄링 기법)

  • Kim, Young-Hwan;Go, Jae-Jin;Jeon, Ki-Man
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2003.11a
    • /
    • pp.455-458
    • /
    • 2003
  • 네트워크 사용자의 급속한 증가로 네트워크 내의 부하를 감당하기에는 많은 어려움을 가져왔다. 이와 같은 이유로 기존의 TCP/IP 에서 세션을 통하여 노드들 간의 통신을 연결하는 방식에서 현재는 하나의 채널을 통해 고속의 I/O 가 가능하도록 하는 기술의 많이 연구되고 있다. 그 대표적인 것으로 인피니밴드가 있다. 인피니밴드는 프로세싱 노드와 입출력 장치 사이의 통신, 프로세스간 통신에 대한 산업 표준이 되고 있고 프로세싱 노드와 입출력 장치를 연결하기 위해 스위치 기반의 상호 연결은 전통적인 버스 입출력을 대체하는 새로운 입출력 방식을 사용한다. 또한 인피니밴드는 서버 시스템에서 요구하는 여러 특징 중에서 어플리케이션에게 QoS (Quality of Service)을 보장할 수 있는 메커니즘을 포함하고 있다. 본 논문에서는 어플리케이션에서 요구하는 각 트레픽의 요구 대역폭 크기에 따라 구분하여 효율적인 중재 테이블의 구성을 통해 데이터 전송에 있어 QoS 에 합당하게 출력포트를 통해 나갈 수 있도록 중재 테이블을 관리하는 기법을 제안하고 이를 NS-2 (Network Simulator)을 이용하여 성능 평가를 했다. 특히 기존 인피니밴드에서의 중재 테이블을 이용한 패킷 처리량과 본 논문에서 제안한 중재 테이블 구성 방식을 이용한 패킷 처리량을 비교했으며 성능평가 결과는 기존의 인피니밴드에서의 패킷 처리량에 비해 약 19% 향상된 결과를 나타냈다.

  • PDF