• Title/Summary/Keyword: 공종

Search Result 319, Processing Time 0.028 seconds

A Study on the Cost Estimating Method based on Spatial Unit Focused on Improving Limitation Caused by Lack of Spatial Information of the Cost Based on Work Type (공간단위 공사비 산정방법에 관한 연구 - 공종별 공사비의 공간정보 부재로 인한 한계점 개선을 중심으로 -)

  • Lee, Ki-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.131-139
    • /
    • 2011
  • In this Study, the Cost of Public Facility Construction in the VE Cost Model, and the Progress of the Construction Site Management, and Cost due to the Lack of Cpatial Information in Dispute Cost Work Type Recognize the limits of Historical Information, and to Overcome the Perception of Cost and Space Systems Unit In the Process of Transition that Began Seeking Ways to Improve Through this Study, Different Parts of the Proposed Area of Construction Work Unit System, the Core of Calculating Hourly and Detailed Engineering Information and Cost Information Generated Extension to Configure the Construction Unit in Every Space, Every Work Unit System, All Materials That Make Up Work Unit System, Unit Labor Costs, And All of the Configuration Items Enables Precise And Multidimensional Understanding is That.

Elicitation of Potential Information Technologies for Construction Process and Tasks - Using Cross-Impact Analysis (교차영향분석을 활용한 건설 업무기능 및 공종 별 주요 IT기술 도출)

  • Park, Sung-Hoon;Kwon, Soon-Wook;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.160-169
    • /
    • 2012
  • Domestic construction industry, which has recently had difficulty in market saturation and slowing growth, is trying to resolve this situation by incorporation with IT technology. However, there was less choice and has simply used IT technology as required in construction field. In other word, IT technology has applied to not all processes but some parts. Therefore, in this paper, we find out suitable and promising IT technology to each step of construction process, analyzing IT convergence technology related to whole process comprehensively in order to suggest fundamental directions for effective construction IT convergence in the field.

Development of Web-based Process Management System for Spatial Data Construction (웹기반의 공간데이터 구축공정 관리시스템 개발)

  • Choi, Byoung-Gil;Kim, Sung-Soo;Cho, Kwang-Hee
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.14 no.3 s.37
    • /
    • pp.63-70
    • /
    • 2006
  • This study aims to development of web-based process management system for spatial data construction. For developing this system work classification of basic surveying was standardized and quality management method for spatial data was established. Production process and work classification system for basic surveying such as control point surveying using GPS, leveling, aerial photographing, digital mapping, topographic mapping, digital elevation modeling, aerial photographic DB construction and digital orthophotomap was standardized. The status of the output and quality inspection for basic surveying project were analyzed, and the elements of quality inspection and data format for the type of outputs were analyzed. Based on standardized and analyzed contents, web-based process management system was developed after database and process was designed. The process management system consisted of process management, quality control, metadata management, and system management.

  • PDF

A Hi-Value Process Establishment for Efficient Implement of Design Value Engineering in Highway (효율적 고속도로 설계VE 수행을 위한 Hi-Value 프로세스 정립)

  • Heo, In;Lee, Yong-Gu;Jeong, Byeong-Cheon;Yang, Jae-Gyeong
    • Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.36-48
    • /
    • 2011
  • 도로건설프로젝트에서의 VE는 도로시설물의 기능을 향상시키고 비용을 절감하기 위한 방법으로 지금까지 널리 활용되고 있다. 그러나, 실제 건설VE 실무에서는 VE Job Plan 중 일부 단계가 생략되거나 형식적으로 수행되는 문제점이 발생되어 VE 수행결과에 대한 신뢰성에 의문이 제기되고 있다. 이는 제조업과 달리 대규모이며 복합공종을 갖는 건설프로젝트의 특성을 반영하지 못하고 있기 때문이다. 건설프로젝트는 대규모 복합공종으로 구성되어 복잡하고 다양한 기능 및 요구성능이 있으며, 시설물이 갖는 기능(Function)과 요구성능(Required Performance)의 일부는 반복적으로 발생하는 특징을 가지고 있다. 이에 본 연구에서는 VE Process의 실효성을 높이기 위하여 품질모델(Quality Model)과 기능분석(Function Analysis)단계에서 이러한 특징을 반영한 개선방향을 제시하고, 수차례 실무 검증을 통하여 적용성 및 효율성을 확인하였다. 이와 더불어 고속도로 VE Job Plan은 고속도로 설계 업무절차에 부합하도록 개선하여 VE 수행효과가 극대화 되도록 제안하였으며, 또한 한국도로공사에서 시행하는 고속도로 대한 VE절차를 "Hi-Value"라 명명하고 실무활용성, 효율성을 확대하고 지속적으로 발전시켜 나아갈 계획이다.

Statistical Analysis of Work Performance Indicator (작업 성과지표의 통계적 분석 방법에 관한 연구)

  • Moon, Hyo-Gi;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.947-952
    • /
    • 2007
  • The construction project is composed of individual trade which is consists of each activity. and the performance of each activity is the lowest level to influence the project performance. Consequently, It is essential to measure and evaluate the performance of the each assignment. But the existing performance measurement have mainly focussed on company level and project level. Therefore, this paper select PPC as the indicator of a activity and, suggests the analysis method of indicators for a goal-oriented management and continuous improvement through a statistical control techniques.

  • PDF

BIM-based Priority Activity in Construction Standard Unit Price (BIM기반 표준시장단가 우선적용 공종 분석)

  • Jin, Zheng-Xun;Baek, Seung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.204-205
    • /
    • 2022
  • Recently, the application of BIM has been continuously expanded according to various government policies, and the application performance is being analyzed in BIM projects such as roads and railways. In line with this trend, the government is making additional efforts to introduce full-scale design BIM. The BIM design in the public sector is directly related to the estimated price. However, looking at the current status of BIM introduction, there is no support system in place for calculating the estimated price. Therefore, this study intends to analyze the priority activity that is easy to develop BIM unit price among the construction standard unit Price of construction work. In this study, in order to derive the BIM-based priority activity, BIM application statements and application guidelines were analyzed. As a result of the analysis, cast-in-place concrete construction (civil engineering) and reinforced concrete construction (architecture) were deduced as suitable construction activities for the preferential application of BIM. Since the results presented in this study are a rough analysis, it is judged that additional detailed analysis is necessary for the future.

  • PDF

Development of an Appropriate Deposit-Estimation System for Restoration of Land-Use-Changed Forest Lands Using the Delphi Technique (델파이 기법을 활용한 적정 산지복구비 산출체계의 개발)

  • Koo, Kiwoon;Kweon, Hyeongkeun;Lee, Sang In;Kwon, Semyung;Seo, Jung Il
    • Journal of Korean Society of Forest Science
    • /
    • v.110 no.4
    • /
    • pp.630-647
    • /
    • 2021
  • We determined the current problem of the restoration deposit-estimation system, stipulated by the Mountainous Districts Management Act, using the Delphi technique. Consequently, we proposed a standard model for forest land restoration to derive a reasonable deposit-estimation system. With the result of the Delphi survey, the inappropriateness of land-use type and slope gradient classifications was shown; the insufficiency of standard works was a significant problem in the current system. A way to solve these problems was devised, to reorganize the current land-use type into the subject of the site. The specific subjects included the following: (i) to permit or report forest land-use change and temporary use of forest land, (ii) to report temporary use of forest land, (iii) to permit stone collection or sale for mineral mining, and (iv) to allow sediment collection. The current slope gradient subdivision into (a) θ<10°, (b) 10°≦θ<15°, (c) 15°≦θ<20°, (d) 20°≦θ<25°, (e) 25°≦θ<30°, and (f) θ≧30° and the reorganization of 17 standard works into 22 standard works were deemed as solutions, along with seven additional works. We developed 24 standard models for the forest land restoration project based on the aforementioned results. The deposits estimated by these models ranged from 34,185,000 (Korean) won to 607,403,000 won. If additional works, premiums, discounts, and supervision fees are added to the models, the deposit increases to an estimated 668,143,000 won subject to permission for stone collection or sale and mineral mining. Experts agree on the distribution of the restoration deposits estimated by these models at a high level in the Delphi survey. Our findings are expected to contribute to securing the appropriateness of the restoration cost deposited for the smooth performance of the vicariously executed restoration project.

The Relationship between the Characteristics of Naturalized Plant and Working Type on Major Forest Restoration Sites (주요 산림복원사업지 내 귀화식물의 특성과 공종 간 영향 관계)

  • Jeon, Yongsam;Park, Joon Hyung;Kwon, Ohil;Lee, Hye Jeong;Lim, Chaeyoung
    • Korean Journal of Environment and Ecology
    • /
    • v.36 no.5
    • /
    • pp.481-495
    • /
    • 2022
  • This study was designed to identify the actual state of naturalized plants and invasive alien species that cause disturbances to the ecosystem, plants which are introduced after forest restoration, and explore the implications resulting from the project. Onsite examination included 29 sites which have been subjected to forest restoration by the Korea Forest Service. Once these were chosen, activity took place twice a year in the spring (May-June) and in the summer (August-September) in 2020 and 2021. Areas not relevant to the project sites were excluded from this activity so that we could identify the plants that could be understood to have been introduced or brought into the site after the actual forest restoration. And the correlation was analyzed, between the naturalized flora within the project sites and the working types applied to the site through confirmation of completion of the restoration project. The naturalized plants appearing on the entire site cover a total of 109 taxa, which includes 29 families, 80 genera, 108 species and 1 subspecies, while invasive plants included 3 families, 7 genera and 8 species. The number of classifications and the naturalization rate gradually decreased over time, after the project. While there was no significant difference between the number of classification groups and the naturalization rate for naturalized plants between project sites, given the number of taxa of naturalized plants, organized by type of damage, there were relatively more naturalized plants that appeared in the severed section of the Baekdudaegan Mountain Range, as well as at quarry and facility sites. Seeding apparently results in naturalization rates as high as 15.545%, on average, based on comparisons of naturalization rates by sowing, seeding, planting, herb planting, and sod pitching channels, all of these being methods of vegetation for planting/greening of bareland and slopes within the project areas. With no seeding, it was 9.167%, higher than the average. As for other vegetation, there was no significant difference depending on application of the working type. This means that unlike the plants subjected to planting, the working type of seed planting which makes it difficult to identify whether a certain plant is a naturalized plant greatly affects the introduction of naturalized plants to the restoration sites, even when using herb planting and sod pitching to control plants and results. Therefore the study suggests that there be inspection by experts of seeds when sowing within restoration sites. The results of this study suggest good practices that will help to direct effective vegetation restoration and follow-up management.

Automated Training Database Development through Image Web Crawling for Construction Site Monitoring (건설현장 영상 분석을 위한 웹 크롤링 기반 학습 데이터베이스 구축 자동화)

  • Hwang, Jeongbin;Kim, Jinwoo;Chi, Seokho;Seo, JoonOh
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.887-892
    • /
    • 2019
  • Many researchers have developed a series of vision-based technologies to monitor construction sites automatically. To achieve high performance of vision-based technologies, it is essential to build a large amount and high quality of training image database (DB). To do that, researchers usually visit construction sites, install cameras at the jobsites, and collect images for training DB. However, such human and site-dependent approach requires a huge amount of time and costs, and it would be difficult to represent a range of characteristics of different construction sites and resources. To address these problems, this paper proposes a framework that automatically constructs a training image DB using web crawling techniques. For the validation, the authors conducted two different experiments with the automatically generated DB: construction work type classification and equipment classification. The results showed that the method could successfully build the training image DB for the two classification problems, and the findings of this study can be used to reduce the time and efforts for developing a vision-based technology on construction sites.

Impact Analysis of Economic Fluctuation of Saudi Arabia on Korean Overseas Construction Business (사우디아라비아의 경제변동이 한국의 해외건설 수주에 미치는 영향분석)

  • Jeon, Jae-Keun;Lee, Suk-Won;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.39-48
    • /
    • 2016
  • According to the order receipt report over the past 10 years the overseas construction business total trades were 54.05% and 68.09% done by the Middle East and other industrial facilities respectively. In the Middle East based on data collected in 2014 the country with most overseas construction business is Saudi Arabia with 34.10%, and the industrial facility occupies the larger share with 56%. Overseas construction business is suffering from a reduction in work orders in the Middle East because of the recent oil price reduction. At this point of view, it is necessary to consider economy fluctuation for the diversification of construction type and work orders. This study analyzed, focusing in Saudi Arabia how the economical fluctuations of nations of progress can affect overseas construction business' trade orders. The analysis results demonstrated that most construction types depends on GDP, investment fund. Also industrial facility can be substituted with Architecture and civil engineering. This work is expected to be used as a basis for trade order amount maintenance and construction type diversification.