• Title/Summary/Keyword: 공정 운영시간

Search Result 155, Processing Time 0.03 seconds

Development of the Vacuum Drying Process for the PWR Spent Nuclear Fuel Dry Storage (경수로 사용후핵연료 건식저장을 위한 진공건조공정 개발)

  • Baeg, Chang-Yeal;Cho, Chun-Hyung
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.14 no.4
    • /
    • pp.435-443
    • /
    • 2016
  • This paper describes the development of a dry operation process for PWR spent nuclear fuel, which is currently stored in the domestic NPP's storage pool, using a dual purpose metal cask. Domestic NNPs have had experience with wet type transportation of PWR spent nuclear fuel between neighboring NPPs since the early 1990s, but no experience with dry type operation. For this reason, we developed a specific operation process and also confirmed the safety of the major cask components and its spent nuclear fuel during the dual purpose metal cask operation process. We also describe the short term operation process that was established to be completed within 21 hours and propose the allowable working time for each step (15 hours for wet process, 3 hours for drain process and 3 hours for vacuum drying process).

Scheduling and Determination of Feasible Process Times for CVD Cluster Tools with a Dual End Effector (두 팔을 가진 화학 박막 증착용 클러스터 장비의 스케줄링과 공정 시간 결정)

  • 이환용;이태억
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.107-110
    • /
    • 2000
  • 화학 박막 증착용(CVD : Chemical Vapor Deposition) 클러스터 장비는 다양한 공정 경로가 가능하며 물류 흐름이 매우 복잡해질 수 있다. 또한, 공정이 종료된 웨이퍼는 제한 시간 내에 챔버에서 꺼내져야만 한다. 클러스터 장비는 두 개의 팔을 가진 로봇이며, 빈 쪽 팔을 이용하여 공정이 종료된 웨이퍼를 꺼낸 후, 다른 쪽 팔을 이용하여 이전 공정에서 가져온 웨이퍼를 해당 공정에 넣어 주는 스왑(SWAP) 방식으로 운영된다. 이러한 스왑 방식에서는 로봇 작업 순서가 결정되어 진다. 그러나, 로봇의 팔 이외에 임시버퍼가 없고, 각 챔버는 엄격한 체제 시간 제약(Residency Time Constraint)을 가지고 있기 때문에 로봇의 작업 시점의 제어가 필요하다. 본 논문에서는 간단한 Earliest Starting 방식으로 로봇의 작업 시점을 제어한다고 가정했을 때, 스왑 방식을 운용하면서 체제 시간 제약을 만족하는 공정 시간들의 조건을 제시한다. 공정 시간은 엔지니어에 의해 다소 조정이 가능하므로 공정 시간들의 조건은 엔지니어에게 스케줄 가능한 공정 시간을 결정할 수 있도록 지원해 주는 시스템에 활용 가능하다. 또한, 본 논문에서는 FSM(Finite State Machine)을 이용하여 CTC(Cluster Tool Controller) 내부의 실시간 스케줄러 구현 방법을 제안한다.

  • PDF

Performance analysis of real time network based on mini MAP in process control environment (사업공정환경에서 Mini MAP을 기준으로한 실시간 네트워크의 성능해석)

  • 김정호;정태진
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1991.10a
    • /
    • pp.342-346
    • /
    • 1991
  • 산업공정현장에서는 독립적으로 운영되고 있는 프로그램식 단위제어기기들에 대한 연계운영을 위하여 실시간 처리 소규모 네트워크가 도입되어 구축운영되고 있다. 특히 제조생산공정에서는 계층화된 분산 구조로서 공정정보처리를 위하여 공장환경에 적절한 네트워크 구축을 MAP등의 표준화된 규격에 의하여 권고되고 구현되어 운영되고 있다. 본 논문에서는 공장 환경에서의 표준규격으로 제안된 Mini MAP을 기준으로 하여 물리 및 데이타 링크계층을 Petrinet 기법을 활용하여 실시간 처리를 위한 개선된 모델을 제안하고 네트워크의 성능측정 및 시뮬레이션을 수행하였다. 또한 이 모델에 의하여 토큰버스 네트워크를 구성하여 전송 서비스시간과 메세지 처리율을 분석하고 Mini MAP 규격과 함께 성능을 해석하였다.

  • PDF

공정현장 적응능력 평가를 위한 압력별 유량에 따른 드라이펌프의 실시간 특성분석

  • Choe, Gyeong-Min;Kim, Wan-Jung;Go, Mun-Gyu;Jeong, Wan-Seop;Im, Jong-Yeon
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2013.08a
    • /
    • pp.113-113
    • /
    • 2013
  • 최근 반도체 산업의 급속한 발전과 더불어 핵심기술로 부각되고 있는 진공 기술은 다양한 응용목적을 위한 진공시스템 설계와 운영을 필요로 한다. 이는 진공에 대한 기초지식과 이해가 요구되며, 설계제작 및 운영은 많은 시간과 큰 비용이 요구된다. 따라서 응용 진공시스템 제작에는 구성에 따른 시스템 진공특성을 예측하는 것이 중요하며 목적에 부합한 진공펌프를 선택하고 운영하여 최소비용으로 시스템 활용효율성을 극대화할 수 있는 설계를 해야 한다. 현재 반도체 및 디스플레이 공정의 저전력, 대유량화 추세에 따라 최대 3,000 m3/h급의 드라이펌프가 여러 공정에서 적용되고 있는 추세이다. 이에 대응한 고유량 영역의 드라이펌프 부하 내구성 대응 요구에 부응하는 객관적 내구성평가의 정립 및 표준 측정 시험평가 방법의 필요성이 점차 대두되고 있는 경향에 있다. 이러한 현실적인 요구 조건에 필요한 기본적인 평가로 압력대별 드라이펌프의 적응능력을 실시간 측정하였다. 실험 조건으로는 각 드라이펌프 용량별 N2 가스를 1 시간에서 3 시간동안 1 mbar에서 최대 300 mbar까지 연속적인 부하 조건에서의 유량, 진동, 소음, 소비전력 등을 실시간으로 측정하였다. 이에 부응하는 평가장치 구축 및 시험분석은 한국표준과학연구원 진공펌프 평가실험실에서 수행되었다.

  • PDF

Design and Stability Analysis of MAP Network Management Module (MAP 네트워크 관리 모듈의 설계와 안정성 해석)

  • 김정호
    • Journal of the Korean Professional Engineers Association
    • /
    • v.28 no.3
    • /
    • pp.121-134
    • /
    • 1995
  • To operate the automatic devices of manufacturing process more effectively and to solve the needs of the resource sharing, network technology is applied to the unit con-trol devices located In common manufacturing zone and operated by connecting them. The network management system, which controls and supervises the network resources in the communication network, is the function that is necessarily required in this net-work. For the stability in this network, this paper measures the variation of data packet length and node number and analyzes the variated value of the token rotation time and waiting time for the network operation. On the evalution of the performance, the data packet length varies from 10 bytes to 100 bytes in the operation of the group manage-ment network, the variation of the token rotation time and waiting time is less than 10 msec. When the variation of the data packet lenhth is less than 50 bytes, differences in token rotation time or waiting time is unnoticable. Since the waiting time in this case is less than 10 msec, response time Is fast enough.

  • PDF

Process Simulation and Optimization of Fuel Cell System including CFD Modeling of Diesel Desulfurizer Unit Process (디젤탈황 단위공정의 CFD 모델링을 포함한 연료전지 시스템 공정설계 및 최적화)

  • Choi, Chang Yong;Im, Do Jin
    • Korean Chemical Engineering Research
    • /
    • v.56 no.3
    • /
    • pp.421-429
    • /
    • 2018
  • We performed process and CFD simulations of a 100 kW fuel cell system. By process simulation, we derived the input flow rate of each unit process and the recycle diesel flow rate. Through CFD simulation considering the recycle diesel flow, more efficient operational condition was found. Using 6 desulfurize reactors, a TSA process for a 100 kW fuel cell system was successfully constructed. Heat interference between reactors was found to be negligible. These results will contribute to increasing the efficiency of fuel cell system and the developed desulfurizing module design will contribute to the clean petrochemical technology as well as fuel cell systems.

전처리 집합체해체 핵심장치 디지털 목업 검증

  • Kim, Yeong-Hwan;Jo, Yong-Jun;An, Do-Hui
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2015.10a
    • /
    • pp.133-134
    • /
    • 2015
  • 전처리 공정장치 구축에 앞서 정확한 설계와 검증이 선행되어야 한다. 우선 디지털 목업 기술을 통해 설계검증을 철저히 함으로써 공정의 품질을 높이고 공정하자를 최소화 할 수 있다. 전처리 공정 중 집합체해체 핵심장치의 유지보수를 쉽게 하고, 원격 제어 효율을 높이기 위한 모듈화와 그에 대한 사전 검증을 수행하였다. 이를 위해해 전처리 디지털 목업 시스템 검증 대상과 집합체 해체핵심장치 주요모듈을 선정하였으며, 주요 모듈의 모듈화 방안 과 모듈 탈착 시간 검증하였다. 그 결과, 집합체해체 핵심장치에서는 5개의 주요 모듈로 구성되었으며, 모듈 탈착 시간 검증에서 작업시간은 클램프모듈이 약 130초, 언볼팅, 드릴링 모듈이 140초 소요될 것으로 분석되었다. 향후 전처리장치별 모듈 분석과 LAYOUT 운영을 포함해서 MSM 시뮬레이터의 디바이스 및 시뮬레이터 시스템 구축을 수행할 것이다.

  • PDF

사용후핵연료봉 인출 핵심장치 디지털 목업 검증

  • Kim, Yeong-Hwan;Jo, Yong-Jun;Lee, Yeong-Sun;Lee, Do-Yeon;An, Do-Hui
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2016.10a
    • /
    • pp.177-178
    • /
    • 2016
  • 전처리 공정장치 구축에 앞서 정확한 설계와 검증이 선행되어야 한다. 우선 디지털 목업 기술을 통해 설계검증을 철저히 함으로써 공정의 품질을 높이고 공정하자를 최소화 할 수 있다. 전처리 공정 중 사용후핵연료봉 인출 핵심장치의 유지보수를 쉽게 하고, 원격제어 효율을 높이기 위한 모듈화와 그에 대한 모듈화 방안분석을 수행하였다. 이를 위해해 전처리 디지털 목업 시스템 검증 대상과 사용 후핵연료봉 인출 핵심장치 주요모듈을 선정하였으며, 주요 모듈의 모듈화 방안 과 모듈 탈착 시간 검증하였다. 그 결과, 사용후핵연료봉 인출 핵심장치에서는 5개의 주요 모듈로 구성하였으며, 모듈 탈착 시간 검증에서 작업시간은 클램프모듈이 약 190초, 언볼팅, 푸셔 모듈이 140초, 인출 모듈이 160초, 연료봉 밀집 모듈이 80초 소요될 것 분석되었다. 향후 전처리장치별 모듈 분석과 LAYOUT 운영을 포함해서 MSM 시뮬레이터의 디바이스 및 시뮬레이터 시스템 구축을 수행할 것이다.

  • PDF

Operation and Analysis of Network for Multivendor PLC Group Management in the Wall Paper Process (발포 벽지 공정에서 이기종 PLC 그룹 관리를 위한 네트워크 운영과 해석)

  • Gang, Seong-Deok;Lee, Dong-Chun;Kim, Jeong-Ho;Lee, Sang-Beom
    • The Transactions of the Korea Information Processing Society
    • /
    • v.3 no.2
    • /
    • pp.283-294
    • /
    • 1996
  • To operate the automatic devices of manufacturing process more effectively and to solve the needs of the resource sharing, network technology is applied to the unit control devices located in common manufacturing zone and operated by connecting them. This paper introduces deign and test operation of cell system for the management of multivendor PLC by applying to wall paper process based on the manufacturing standardization of CIM. The analysis of designed multivendor PLC group is performed by selecting the parameters such as variation of data packet size and node number of PLC ladder logic program and variation by analyzing the corresponding variation values of token rotation time and waiting time for the system operation. For the method of the analysis,the equation is considering the overhead such as indicated packet service time and transmission safety margin for PLC network connection in M/G/1 queue model,and it is applied to the cell system and PLC group manage-ment for operation .Through the experiment,it is found that the realtime processing is possible with expanded and better result than the resuit obtained by Jayasumana.Browaka with PLC scan time considered,response lower limit of 10-20 msec. data packet size not more than 50 bytes.and the number of nodes less than 40.

  • PDF

Optimization for SBR Process of Two-Sludge Type (Two-sludge 유형 SBR 공정의 최적 운영 조건 도출)

  • Ryu, Hong-Duck;Hwang, Jae-Sik;Kim, Keum-Yong;Lee, Sang-Ill
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.29 no.2
    • /
    • pp.229-234
    • /
    • 2007
  • In the present work, the sequencing batch reactor process of two-sludge type was optimized. The effects of solid retention time, hydraulic retention time, length of biosorption phase and temperature variation were investigated, respectively. In the T-N removal, the long solid retention time was favored. It was speculated that SCOD biosorption efficiency was higher in long solid retention time than in short solid retention time. In the comparison of hydraulic retention time, the removal efficiency of $NH_4^+-N$ and T-N were almost same in all applied hydraulic retention times which were 8 hr, 10 hr and 15 hr. It was observed that there was no need to have the hydraulic retention time more than 20 min in biosorption phase for enhancement of T-N removal efficiency. An experimental comparison of removal efficiencies with different temperature conditions was carried out. Decrease of temperature didn't affect the performance of the process, however, phosphorus removal efficiency was a little higher at low temperature than high temperature. Consequently, the process developed in this study was much amenable to wastewater treatment which was conducted in the low temperature and high loading rate.