• Title/Summary/Keyword: 공장제작

Search Result 293, Processing Time 0.025 seconds

A Study on Development of Owner's Standard Specification Structure for Modular Building (모듈러 전문 시방서 개발을 위한 체계 구축)

  • Nam, Sunghoon;Park, Honggeon;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.12-21
    • /
    • 2019
  • Specification is an important document for securing safe construction and improving quality as well as the contract document. Currently, the specifications used in modular buildings in Korea are only the construction specification, and most of the contents are used by borrowing the standard specifications of the building, so the contents of the modular buildings can not be reflected and it is contents are similar to the guideline book. The current status of domestic specification for modular buildings is affecting the quality of modular buildings. Therefore, we analyze activity through monitoring the modular process of modular buildings and analyze systematically relationship by applying IDEF modeling with analyzed activity. As result this paper proposes a structure of special specification specialized in modular building through generalization. The major classifications were divided into three stages : factory construction, transportation, and on-site installation. The specification structure was divided into 32 types of construction items from the floor slab assembly of the factory production to the joint finish of the on site installation in accordance with the opinion of experts.

Development of Top-Down Connection System to Solve the Problem of Construction Tolerances in Installing Prefabricated Beams to Pre-founded Columns (시공오차가 있는 선기초기둥에 공장제작보의 설치가 용이한 탑다운공사용 접합기술개발)

  • Kim, Seung-Weon;Jung, Hee-Weon;Park, Dae-Yung;Kim, Dong-Gun;Park, Joo-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.25-30
    • /
    • 2011
  • Almost prefounded columns for top-down construction certainly have construction tolerances in plan and plumbness. Therefore, it is very difficult to connect prefabricated beams to prefounded columns at each floor level after excavation by usual top-down connection method and this usual connection method leads to long construction time, increasing cost and decreasing quality. This paper presents a new method for connecting prefabricated beam to prefounded column with GROUT-JACKET CONNECTION SYSTEM consisting of sleeve, bearing-shear bands and grout. Details and illustrations of the connections and applications by GROUT-JACKET CONNECTION SYSTEM for the top-down construction are also included in this paper.

  • PDF

Collection and Analysis System of Manufacturing Data using Simulation (시뮬레이션을 이용한 수산가공기업의 제조데이터 수집 및 분석 시스템)

  • Lee, Jin-Heung
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2021.01a
    • /
    • pp.101-104
    • /
    • 2021
  • 본 논문에서는 시뮬레이션을 이용하여 대부분의 공정이 수작업으로 이루어지고 있는 수산가공 공장의 생산성 향상을 위한 제조데이터 활용 시스템을 제안한다. 제안된 내용은 플랜트 시뮬레이션을 이용하여 생산공정 모델링을 제작하고, 이로부터 가상의 제조데이터를 수집하여 생산량, 작업공정 시간 등 최적화된 공정 프로세스를 도출한다. 또한 제조데이터 수집 및 분석을 위하여 공장 내 수기로 작성되는 제조데이터를 정형화하여 제조데이터 플랫폼에 저장하고, 저장된 데이터의 시각화, 실시간 모니터링 등 데이터 시각화 및 시뮬레이션과 연동된 공정 프로세스 예측 등에 활용 가능할 것으로 기대된다.

  • PDF

To Improve Production Process of the Modular Using the Conveyor System (모듈러 공장생산 프로세스 개선을 위한 컨베이어시스템 적용 방안 - 공장생산 중심으로 -)

  • Bae, Byung-Yoon;Kim, Kyung-Rai;Cha, Hee-Sung;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.103-112
    • /
    • 2012
  • Republic of Korea is recently becoming an advanced country with increasing standard of living. This is causing a lack of employment in the construction industry because of high labor costs and it is resulting rapid increase in foreign labors. Modular Method of Construction can be defined as 50%~90% of the entire process is completed in factory, and transferred to construction field to install. The main purpose of this process is to minimize the entire process that possibly can be done at construction field in order to maximize the quality. The current local usage of Modular Method of Construction started at Shin Ki Elementary School during 2003 and it is widely used for military facilities. It should be used more because it has strengths of spending short time period to complete and low production costs. It can make a change if Modular Method of Construction is applied. Toyota is currently producing vehicle with conveyor system and if Modular Method of Construction is applied, then it is possible to reduce the waste of labor, and automatic production time. Expansion of the modular Market can be expected by applying this method because it will improve producing costs, high quality, and enforced process. This research tried to solve the problem of factory's manufacturing production by applying local Modular Method of Construction to provide suggestions and analyze the profitability with applied conveyor system. It is depending on produced model, but this research's model will take 20 months including assessment of payback period.

An Educational Hardware and Software System Developement Needed for Factory/Production Facilities Automation in Small and Medium Scale Companies (중소기업의 공장.생산설비 자동화에 필요한 교육용 하드웨어 및 소프트웨어 시스템 개발)

  • Cho Sung-Mok;Kim Sung-Dae;Kim Hoe-Jin;Bae Suk-Tae;Son Il-Moon;Lee Soo-Lyong;Cho Tae-Je;Kim Jong-Chul
    • Journal of Engineering Education Research
    • /
    • v.3 no.1
    • /
    • pp.42-52
    • /
    • 2000
  • A Factory/Production Facilities Automation involves compound techniques as well as various applied engineering fields. Therefore, there exist lots of difficult problems related with its introduction, operation and management in small and medium scale companies. In this paper, we extract major contents for its effective traininng program reflected from industrial needs and propose a prototype model for the enhancement of its field capabilites.

  • PDF

Development and Field Application of Portable Tensioning System Using Segmental CFT Member (분절형 CFT부재를 이용한 이동식 프리텐션 제작대의 개발 및 활용)

  • Lee, Doo Sung;Kim, Tae Kyun;Lee, Sung Chul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.965-975
    • /
    • 2014
  • Pretension PSC (Prestressed Concrete) members are subjected to a certain limit of size as they are generally produced in the off-site plant and transferred to the site due to the large scale of the product on system. In this study, a portable pretensioning production system has been developed, which allow us to apply the pretension method on site. Considering that a 50m span PSC girder using the pretension method requires a pressing device to endure a large jacking force, the portable pretension production system has to ensure safety against such a large pretension jacking force. In this study, the portable pretensioning system to produce a 50m span pretension girder was manufactured by using CFT (Concrete Filled steel Tube) members. In order to understand the stability of the system and the behavior of the elements, a static loading test was conducted and the stability of the proposed portable pretensioning production system was confirmed. The developed portable pretension system was applied to several construction sites and was investigated the problems on site. During the pretension girder and slab members that was producted by this pretension system in construction site, it has be found the several advantages such as simple fabrication processes, reduction of prestress-loss, and a decrease of 15% compared with the fabrcation cost of post-tension girder. After due consideration of the problems, this portable pretension system will be improved.

회원사 탐방-금형.사출제작 전문업체 (주)엠아이텍코리아

  • Park, Ji-Yeon
    • The Optical Journal
    • /
    • s.112
    • /
    • pp.36-38
    • /
    • 2007
  • (주)엠아이텍코리아(대표.김재철, www.mitechkorea.com0은 2002년 7월 설립된 이래 짧은 기간동안 금형제작 및 사출성형 분야에서 뛰어난 성과를 창출하며 안정적인 성장기반을 확보하여 이 분야의 '리딩 컴퍼니'로 인정받고 있다. 남들보다 앞서가는 창의적인 생각과 끊임없는 학습을 통해 개발의지를 불태우고 앞선 기술로 시장을 선도해 나가고 있는 이 회사의 지칠 줄 모르는 성장의지는 '제2의 도약기'를 목표로 또 한번 힘찬 항해의 닻을 올렸다. 최근 개성공단.중국공장 구축과 함께 세계시장을 무대로 글로벌마케팅을 향한 준비에 여념이 없다.

  • PDF

특수지역의 전기공사에 대한 미국 전기규격 소개

  • 장수영
    • 전기의세계
    • /
    • v.14 no.3
    • /
    • pp.34-36
    • /
    • 1965
  • 우리나라의 전기공작물규정 제166조, 167조, 168조 및 169조에는 특수장소의 저압공사에 대하여 규정되어 있으나 미국 전기규범(National Electrical Code)에 비하면 너무 간단하며 국내에서는 방폭형 전기기기를 정식으로 제작하는 공장이 없는 까닭에 대부분 외국에서 수입해야 하는 실정이며 또한 특히 군에서는 미 고문단의 기술협조를 받아야 하므로 부득히 NEC의 규정에 따라서 공사를 해야하나 미제 재료를 도입하려면 공사시간도 지연되며 또한 군원이관 계획에 의거 점차로 군원이 소멸되고 있으므로 앞으로는 이와 같은 방폭원 전기재료에 대하여 국내에서 제작 기준을 설정하고 이를 생산할 수 있도록 당국에 강력히 건의하는 바이다.

  • PDF

건설산업경쟁력 강화와 부실방지대책(안)

  • 한국주택협회
    • 주택과사람들
    • /
    • no.54 s.71
    • /
    • pp.185-206
    • /
    • 1996
  • 1.건설제도의 국제화와 경쟁기반 구축 $\bullet$건설산업을 기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$사후관리 등 전 분야에 걸쳐 경쟁력 있는 산업으로 육성-기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$유지관리 등 건설산업 전반에 관한 기본사항을 법제화-대규모 공사의 경우 발주자를 대신하여 건설공사의 기획$\cdot$설계$\cdot$발주$\cdot$감리$\cdot$시공관리 등 업무의 전부 또는 일부를 종합적으로 조정$\cdot$관리하는 $\lceil$건설사업관리$\rfloor$제도를 도입 $bullet$건설공사 $\lceil$현장실명제$\rfloor$도입을 통한 하도급제도의 정비-전문건설업자로부터 하도급, 위탁, 고용 등의 형태로 공사에 참여하는 현장근로자를 신고 받아 권익을 보호하고 시공책임도 부과하는 $\lceil$현장실명제$\rfloor$도입 $\bullet$공사완성보증제, 손해배상보증제도를 도입하고, 신용상태 $\cdot$시공능력에 따라 보증 요율 등을 차등화 하여 부실업체를 배제 $\bullet$건설공사관련 각종 계약서와 시방서 등 제기준을 정비하여 발주자$\cdot$시공자 등 건설주체간의 역할과 책임을 명확화$\bullet$건설분쟁을 신속하고 객관적으로 조정$\cdot$중재하기 위하여 $\lceil$건설분쟁중재원$\rfloor$으로 확대 개편 2. 건설인력의 육성과 고용안정$\bullet$경쟁력 제고의 관건인 우수인력 확보를 위하여 대학교육 제도의 개선을 포함한 건설 인력 수급대책을 추진 - 대학의 건설관련 학과 정원을 2000년까지 매년 일정규모로 증원하여 고급기술 인력을 배출 현재 50$\%$에 불과한 건설관련 국가기술자격자를 2000년에 70$\%$까지 제고 - 감리 등 전문인력을 양성하고, 선진외국 감리 회사를 활용하여 국내 업계와의 경쟁을 유도 $\bullet$건설현장의 최일선에서 품질을 담당하고 있는 건설기능공의 고용안정과 복지향상을 위한 획기적인 대책을 마련 - 건설기능공의 자긍심과 사회적 책임의식을 고취하기 위해 기능공이 여러 현장을 전전하여 근무하더라도 경력관리, 공제금 등의 합산 관리가 가능하도록 $\lceil$건설 근로자 복지카드$\rfloor$제도를 도입 *$\lceil$건실시연구단$\rfloor$을 구성$\cdot$구체적인 운영방안을 수립 - 건설 업체 실정에 맞는 현장위주의 기능검정제도 도입 $\cdot$자격증이 현장에서 요구되는 기능수준과 숙련도를 제대로 반영할 수 있도록 검정방법을 현장 실기위주로 개선하고 자격검정업무도 건설협회 등의 자격 검정능력을 향상시켜 위탁$\cdot$시행하는 방안을 검토 3. 공사시행기관의 전문성과 책임성 제고 $\bullet$시장이 개방되어 건설공사가 국제적인 관행에 따라 이루어질 것에 대비하여 시행기관에 계약$\cdot$공사관리 등 전문직공무원을 집중 교육하여 양성 $\bullet$ 조달청이 대행하여 공사계약을 하는 경우라도 설계변경은 발주기관이 자체적으로 할 수 있도록 허용 $\bullet$ 기술직 공무원의 기술향상을 위하여 관련 공무원의 확충, 해외연수, 현장교육 강화 등을 지속적으로 추진 $\bullet$ 충분한 사전조사를 거쳐 사업계획을 수립하도록 $\lceil$건설공사 시행절차$\rfloor$를 규정 $\bullet$ 공사기간 3년 이상의 공사에 대하여는 최대한 계속비사업으로 편성토록 계속비제도의 운영을 활성화 4. 건설현장의 품질관리체제 구축 $\bullet$ 현장배쳐플랜트 설치를 확대하여 레미콘의 품질관리를 일원화하고 현장에서 레이콘을 배합하는 건식공법을 채택 - 현장레미콘생산시설(B/P)설치 확대로 콘크리트 하자에 대한 책임한계 일원화 유도 - 레미콘 재료인 골재$\cdot$시멘트$\cdot$물을 공장에서 혼합하여 공급하는 현행 습식배합 대신에 물만을 현장에서 혼합하는 건식 배합방식을 도입 $\bullet$철강재$\cdot$철구조물의 품질을 보증하기 위하여 일정기술을 갖춘 공장에서만 제작토록 하는$\lceil$공장인증제$\rfloor$를 도입 - 제작시설과 품질관리 등을 심사하여 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 사후관리를 일괄 책임질 수 있도록 $\lceil$시공 및 유지관리 일괄계약제도$\rfloor$를 도입 - 대형교량$\cdot$소각로$\cdot$하수처리장 등 유지관리에 전문성이 요구되는 분야부터 시범적으로 도입 $\bullet$건설자재의 표준화$\cdot$정보화사업을 조속히 추진 5. 건설업체에 대한 지원 강화 $\bullet$일부 공공사업자의 경우 관행화되어 있는 대금일부의 어음 또는 채권지급방법을 단계적으로 축소 $\bullet$매월 감독이나 감리원의 기성확인에 의하여 시공자에게 공사대금을 직접 지급토록 하는 등 대금 지급절차를 간소화 6. 민간 건축물에 대한 안전확보 $\bullet$충실한 설계가 이루어지도록 제도를 개선 - 설계도서 작성기준을 제정하고 다중이용시설에 대하여는 건축심의단계에서 구조검토 등 설계심의를 의무화 $\bullet$대형다중이용시설에 대한 감리 강화 - 감리전문회사 수준의 감리체제로 전환하고 감리대가도 공공수준으로 인상하고 적용요율대로 지도$\cdot$감독 강화

  • PDF

Capacitor의 신유전재료 기술

  • 김성호
    • 전기의세계
    • /
    • v.41 no.4
    • /
    • pp.42-50
    • /
    • 1992
  • 전자부품의 생산은 다량(대량) 생산을 해야 하는 특징을 갖는 산업으로 월산, 수 백만, 수 천만개를 한 공장에서 생산하고 있으며 이러한 이유로 실험실적으로는 우수한 성능의 Capacitor를 개발하여도 그것이 바로 상품으로 발전하는 것이 의문시 되는 것이며 무엇보다 새로운 Capacitor가 생산 기술적으로 쉽게 제작할 수 있는가를 동시에 검사해야하는 점이 중요하다 할 수 있다.

  • PDF