• Title/Summary/Keyword: 공장분해수리

Search Result 3, Processing Time 0.017 seconds

Cooling Tower Overhaul of Secondary Cooling System in HANARO (하나로 2 차 냉각탑의 공장분해수리)

  • Park, Young-Chul;Lee, Young-Sub;Kim, Yang-Gon;Jung, Hoan-Sung;Lim, In-Chul
    • Proceedings of the KSME Conference
    • /
    • 2007.05b
    • /
    • pp.2714-2719
    • /
    • 2007
  • HANARO, an open-tank-in-pool type research reactor of 30 MWth power in Korea, has been operating normally since its initial criticality in February, 1995. For the last about ten years, A cooling tower of a secondary cooling system has been operated normally in HANARO. Last year, the cooling tower has been overhauled for preservative maintenance including fills, eliminators, wood support, water distribution system, motors, driving shafts, gear reducers, basements, blades and etc. This paper describes the results of the overhaul. As results, it is confirmed that the cooling tower maintains a good operability through a filed test. And a cooling capability will be tested when a wet bulb temperature is maintained about 28 $^{\circ}C$ in summer and the reactor is operated with the full power.

  • PDF

SESI 스케일 방지기

  • 대한설비공사협회
    • 월간 기계설비
    • /
    • s.97
    • /
    • pp.76-78
    • /
    • 1998
  • 경수(천연염)가 가열되면 어느 곳이든지 스케일이 생성됨을 볼 수 있다. 가정에서의 난방시설이나 산업현장에서의 스케일 축적문제는 그 피해정도를 고려해 볼때 매우 중요하다. 각종 열기기나 공장기계 등 스케일이 쌓이면 기계 작동상의 효율 저하는 물론 수리비용의 증가와 필요 이상의 에너지 소모 등 과다한 경비가 부담된다. 이와 관련 전기분해 원리를 이용하여 스케일을 방지할 수 있는 SESI를 소개한다.

  • PDF

A Simulation Study on the Overhaul Repair Shop of Weapon System (전면정비방식의 무기체계 정비공장에 대한 시뮬레이션 연구)

  • Shin, Kyeong-Wook;Lee, Geun-Hyu;Moon, Dug-Hee
    • Journal of the Korea Society for Simulation
    • /
    • v.20 no.3
    • /
    • pp.119-127
    • /
    • 2011
  • Overhaul and repair service means the sequential processes of disassembly, repair and reassembly for a product which has been used for a long time. Overhaul is required for the companies producing airplanes, ships, trains, military weapons and heavy industrial equipments which are very expensive and have a long life cycle. The most important performance measure of the overhaul repair shop is usually the lead time. Thus, how to design the manufacturing system to meet the delivery date is a major concern in overhaul repair shop. This paper introduces the case study of an overhaul repair shop producing military weapon systems with the 3D simulation tool, $QUEST^{TM}$. At first, the characteristics of overhaul shop and what should be considered for simulation modeling are explained. Then, various simulation scenarios including two types of disassembly systems, one is flow line system and the other is cell system, are discussed with the results of simulation experiments.