• Title/Summary/Keyword: 공용중 안전진단

Search Result 40, Processing Time 0.022 seconds

Evaluation of Road Safety Audit on Existing Freeway by Empirical Bayes Method (경험적 베이즈 방법에 의한 공용중인 고속도로 교통안전진단사업의 효과평가)

  • Mun, Sung-Ra
    • International Journal of Highway Engineering
    • /
    • v.14 no.2
    • /
    • pp.117-129
    • /
    • 2012
  • Road safety audit is the preventive enhancement strategy for safety. : it gets rid of beforehand the potential factor of a traffic accident in the stage of road planning and design and it evaluates the appropriation for road geometric structure or safety facility to prevent traffic accident in the stage of operation after the construction. Since this strategy is introduced to our country in the early 2000s, various projects have been processed and it was legislated recently. And now, the evaluation of past project for its continuation is needed. Therefore, in this study the evaluation of road safety audit on existing freeway is performed. The spatial extent of this study is Yong-dong line on which the safety treatment was executed in 2005 and 2006. And, the temporal range of this study is each 2-year of before and after from 2005 and 2006. The empirical bayes method of observational evaluation studies is applied to analyze. As a result, there is an effect of improvement on most of treated sections. But there is ineffective or negligible on some sections. Compared with the detail of treatment on each section, the effect of multiple or various treatments is good for that section. On the other hand, the section on which effect doesn't appear is the result of single or unimportant treatments. Throughout these results, the concrete analysis can be performed and the countermeasures designed for the section on which effect doesn't appear. Also it is used as reference to the future plan and direction of road safety audit on existing freeway.

Analysis of Load Carrying Capacity of Bridges Based on Field Data with Serviced Time (실측자료에 기초한 공용년수 증가에 따른 교량 내하력 분석)

  • Kyung, Kab Soo;Lee, Yeong Il;Lee, Sung Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.1
    • /
    • pp.31-38
    • /
    • 2015
  • In this paper, change of load carrying capacity of bridges with time was analyzed referring to the safety inspect data stored in the KISTEC. From this study, it was known that the capacity is rated differently by various parameters such as inspector's subjective. Accordingly, an improved method, in this paper, is suggested which can correct deviation due to several uncertainties involved in rating process. The suggested method can be utilized for efficient maintenance of bridges such as cycles and determination of priority of retrofit, and estimation of service life etc.

A Study on the Proposal of Strength Presumption Equation of Concrete Using Rebound Test and Aging Effects of Underground Structures (지하구조물 공용년수를 고려한 반발경도법에 의한 강도추정식의 제안)

  • Na, Sung Oak;Yoon, Tae Gook;Rhee, Jong Woo
    • Journal of Korean Society of societal Security
    • /
    • v.2 no.4
    • /
    • pp.59-65
    • /
    • 2009
  • The rebound test using Schmidt hammer is most popular method to estimate strength of concrete. However, this method is inappropriate for Seoul Metro underground structures due to unsuitable aging effects. Consequently, the strength presumption equation of underground structures is proposed according to the correlation of uniaxial compressive strength, rebound test results and age of concrete. To achieve this, the results of in-depth inspection of Seoul Metro underground structures performed annually for last 8 years was anlayed.

  • PDF

A Methodology for Monitoring Prestressed Force of Bridges Using OFS-embedded Stand (광섬유센서가 내장된 강연선을 이용한 교량의 장력 모니터링 방법)

  • Kim, Jae-Min;Kim, Hyun-Woo;Kim, Young-Sang;Kim, Jin-Won;Yun, Chung-Bang
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.21 no.3
    • /
    • pp.287-294
    • /
    • 2008
  • This study proposes a novel method for in service evaluation of tension force of a prestressed 7-wire strand which is frequently employed for retrofitting bridge superstructure. The smart strand is made by replacing the straight king wire of the strand with an instrumented steel tube in which the FBG sensor is embedded. Since the strain of the smart strand can easily be measured using the sensor, it is possible to monitor tension force of the strand during the service. For the sake of demonstrating effectiveness of the proposed strand, we came up with a 7.0m long prototype with 2 FBG sensors, and it is applied as an external tendon to a 6.4m long and 0.6 high RC T-shaped beam. A loading-unloading test has been carried out, and estimated tension forces using the smart strand are compared with measured forces by load cell. The comparison showed that the proposed smart tendon is useful and accurate for monitering tension force of the prestressed tendon.

A Review of the Deterioration and Damage of the Top Flange of the Highway PSC Box Girder Bridge based on the Condition Assessment Results (상태평가 결과 기반 고속도로 PSC Box 거더교 상부플랜지 열화·손상 실태 고찰)

  • Ku, Young-Ho;Han, Sang-Mook
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.6
    • /
    • pp.23-32
    • /
    • 2022
  • Although PSCB girder bridges account for 4% of the bridges in use on highways, they do not account for much, but 98% of PSCB girder bridges are 1st type and 2nd type of bridge. Also, the total length of the PSCB girder bridge is 16% (192km) of the total length of the highway bridge. Thus, the PSCB girder bridge can be one of the bridge types where maintenance is important. In order to analyze the damage types of PSCB girder bridges, a detailed analysis was conducted by selecting 62 places (477 spans) precision safety diagnosis reports considering ratio of the construction method and snow removal environment exposure class. Analysis of report and a field investigation was conducted, and as a result, most of the causes of deterioration damage were caused by rainwater (salt water) flowing into the bridge pavement soaking in between the top flange and the interface. After concrete slab deteriorate occurred then bridge pavement cracking and breaking increased and exfoliation of concrete occurred by corrosion and expansion of the reinforcing bars occurred. In addition, the cause of cracks in the longitudinal direction on the bottom of the top flange is considered to be cracks caused by restrained drying shrinkage. In conclusion, for reasonable maintenance considering the characteristics of PSCB girder bridges, it should be suggested in the design aspect that restrained drying shrinkage crack on top flange. Also, it is believed that differentiated maintenance method should be proposed according to snow removal environment exposure class.

Estimation of Nondestructive Strength Equations Based on the Results of In-situ Concrete Strength for Existing Bridges (국내 교량의 현장 코어강도를 활용한 개선된 비파괴강도 추정식 제안)

  • Kim, Hun-Kyom
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.2
    • /
    • pp.98-104
    • /
    • 2018
  • Nondestructive strength Equations are commonly used to determine the strength of concrete. However, the application of the existing equations may include many errors because this method is proposed on the basis of limited experimental parameters while actual bridges have various parameters such as conditions of concrete mixtures, properties of concrete strength, etc. Also, the error among the existing equations causes the confusion when engineers select the proper estimation equation for the concerned bridge. In this study, a series of the field inspection and the test have been performed on 297 existing bridges, in order to evaluate the bridges, based on the test results of the in-depth inspection, and the estimated strengths by means of the nondestructive strength equations are analyzed and compared with results of the core specimen strengths. According to results of analyses, the nondestructive strength equation proposed by CNDT Committee of Architectural Institute of Japan had high relationship with core strength. However, the strengths predicted by this equation, are underestimated when concrete's strengths are over 30 MPa, otherwise, they are overestimated. Also in this paper, based on the relationship between the estimated nondestructive concrete strengths and the core specimen strengths the modified strength equation through simple correlation analysis is proposed.

Analysis and cause of occurrence of lining cracks on NATM tunnel based on the precise inspection for safety and diagnosis - Part I (정밀안전진단 결과를 활용한 NATM터널(무근)의 라이닝 균열 종류별 발생원인 및 분석 - Part I)

  • Choo, Jin-Ho;Park, Sung-Woo;Kim, Hyung-Tak;Jee, Kee-Hwan;Yoon, Tae-Gook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.3
    • /
    • pp.199-214
    • /
    • 2011
  • A crack is the main cause to affect the integrity of tunnel lining as well as leakage, spalling, exposed rebar, corrosion, carbonation and so on. Since the 1980, NATM has prevailed on excavation method and geotechnical philosophy in tunnel. Although the pattern of cracks has been reported by several engineers' effort, it was only focused on longitudinal cracks of lining. Eleven operational NATM tunnels have been conducted with the precise inspection for safety and diagnosis by KISTEC (Korea Infrastructure Safety and Technology Incorporation). With those results, the crack patterns by the spatial distribution and appearance for each tunnel have been analyzed and the cause of occurrence for seven common types of cracks in NATM tunnels was classified. Additionally, the longitudinal crack on lining above duct slab was figured out by numerical simulation and field inspection. Each crack has been analyzed by CCD (Charge-Coupled Device) scanner image with 3D configuration. Each type of cracks is also explained with output of experimental and condition of construction. Defined cracks on NATM tunnels will be good example for periodical inspection and precise inspection for safety and diagnosis.

A study on performance-based evaluation system for NATM tunnels in use: development of evaluation model and validation (공용중인 NATM 터널의 성능중심 평가체계 연구: 평가모형 개발 및 검증)

  • Moon, Joon-Shik;Kim, Hong-Kyoon;An, Jai-Wook;Lee, Jong-Gun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.1
    • /
    • pp.107-120
    • /
    • 2020
  • In a performance-based evaluation of structures in use, the current performance is assessed by summing up the weighting of the evaluation indices for each performance. In this study, to suggest a performance-based evaluation technique for NATM tunnels in use, the performance evaluation indices were derived by examining the characteristics and similarities of each index developed from previous study. The weighting of the evaluation indices was derived by calculating the relative importance of each evaluation indices from the AHP analysis. In order to develop a quantitative evaluation model, grading criteria for each performance index was derived through literature review, and performance evaluation tables for road and railway tunnels were presented. In order to verify the significance of the proposed performance evaluation model, the correlation analysis was performed between each evaluation index and the final evaluation result. In the correlation analysis, the survey data measured through precision safety diagnosis in the tunnel in use was applied. It may be said that the proposed evaluation indices, weighting, criteria and evaluation models for tunnels in use can be applied to the performance-based maintenance system of tunnels.

Analysis of Discriminant Accuracy of Estimated Load Carrying Capacity in Bridges (교량 추정 내하율 판별 정확도 분석)

  • Kyu San Jung;Dong Woo Seo;Byeong Cheol Kim;Gun Soo Kim;Ki Tae Park;Woo Jong Kim
    • Journal of Korean Society of Disaster and Security
    • /
    • v.16 no.4
    • /
    • pp.123-128
    • /
    • 2023
  • This paper presents the results of an analysis of the discrimination accuracy of a bridge load carrying capacity estimation model based on data from inspection reports. The load carrying rate estimation model was derived using statistical methods through the collection of 2,161 inspection reports. By entering the bridge specifications and maintenance information, you can check the estimated load carrying capacity of the bridge. In order to verify the discrimination accuracy of the estimated load carrying rate model, the estimated load carrying rate was compared with the load carrying rate in the inspection and diagnosis report for 164 public bridges for which data was available. Although there are differences depending on the bridge type, the results were obtained with an accuracy of over 80% in determining the estimated load carrying capacity.

Analysis of Safety Evaluation Guidelines for Practical Maintenance of Existing Concrete Structures (노후 콘크리트 구조물의 실용적 유지관리를 위한 콘크리트 구조물 안전진단 지침 분석)

  • Lee, Joo-Hyung;Cho, Jae-Yeol
    • Land and Housing Review
    • /
    • v.11 no.3
    • /
    • pp.83-92
    • /
    • 2020
  • In South Korea, problems caused by material deterioration of time-worn concrete structures have been increased recently. Because severe material deterioration could damage the structure's safety, it's important to evaluate the old structure's condition and structural capacity regularly to keep its proper performance. The safety evaluation of concrete structures has been initiated and performed periodically since 1995 according to a guideline in accordance with a law in Korea. The guideline prescribes the evaluation types, intervals and methods of the target structure. A lot of cost and labor have been invested every year to carry out the regular safety evaluation. However, it's not clear that the current manual could inspect the old structure's condition and assess the structural capacity precisely. Thus, the verification study initiated to figure out the Korean safety evaluation manual's practicalness. First, the Korean manual was analyzed and then compared with that of other countries for concrete bridges which are representative concrete structure. After that, the previously written evaluation reports were collected and analyzed to find out how the safety evaluation has been carried out. Based on the study results, the parts requiring verification of the manual were drawn. A research program is in progress in order to verify the parts by performing tests with actual structural members from decommissioned concrete bridges.