• Title/Summary/Keyword: 공업화박판강구조

Search Result 2, Processing Time 0.016 seconds

Rotational Stiffness Reduction Factors of End-plate Connection for PEB Using Finite Element Analysis (유한요소해석을 이용한 공업화박판강구조 단부판 접합부의 회전강성감소계수)

  • Lee, Jun-Seop;Shin, Kyung-Jae;Lee, Swoo-Heon;Lee, Hee-Du;Kim, Cheol-Hwan
    • Journal of Korean Society of Steel Construction
    • /
    • v.29 no.4
    • /
    • pp.323-330
    • /
    • 2017
  • The pre-engineered building(PEB) construction has been gradually applied to single story buildings as a practical and efficient alternative to conventional buildings. However, there has been a few structure collapse due to suddenly excessive load. Although a structure design requires accurate and professional skills, the PEB system tends to be designed simply because of complexation of structural analysis for connections. This paper shows the finite element analysis(FEA) using ABAQUS software on bolted connection which was previously tested. The FEA condignly simulated the behavior of bolted connection in PEB system and was in close agreement with experimental results. Then the stiffness reduction factor of the bolted joints that can be used in the actual design is presented through the analysis of the joint parameters.

Experimental Study of the End-plate Gap Effect on the Performance of Extended End-plate Type Splice (이음면 이격이 확장형 단부판 이음부 성능에 미치는 영향에 대한 실험적 연구)

  • Kim, Cheol Hwan;Lee, Myung Jae;Kim, Hee Dong;Kim, Sa Bin
    • Journal of Korean Society of Steel Construction
    • /
    • v.28 no.6
    • /
    • pp.427-438
    • /
    • 2016
  • This study is experimental research for the effect of gap at the end plate on the performance of extended end-plate type splice. For this research, simple beam type specimens by using extended end-plate type splice are planned. Main variables are the initial gap between end-plates, the installation of finger shim plate before the installation of high tension bolts, the final gap between end-plates, and the installation of finger shim plate after the installation of high tension bolts. The static loading tests results show that the maximum bending strength of splice is not dependent on the gap, but the vertical displacement, initial stiffness and elastic stiffness are affected by the gap. In addition to that, the possibility of brittle fracture is increased when the torque of high tension bolt is used to control the gap. Thus, careful consideration is needed in this case.