Korean Journal of Construction Engineering and Management
/
v.8
no.4
/
pp.119-127
/
2007
Cost and Schedule is the most important information, and how efficiently manage this information is the key issue for Construction Project Management. Domestically, systematic scheduling method such as CPM network is not only used widely but integration of time and cost information also is. In order to effectively integrate and use the time and cost information, it is suggested that WBS(Work Breakdown Structure) based QDB(Quantity Database) should be generated from the design phase and, WBS and QDB related system tool should be supported. It could be helpful to relate and integrate other construction project information.
Kim, Seong-Jin;Kim, Nam-Gon;Yoon, Hoi-Su;Moon, Jin-Seok
Proceedings of the Korean Information Science Society Conference
/
2012.06b
/
pp.46-47
/
2012
기존 공공건설사업은 내역체계의 공정방식으로 인해 공정-공사비가 통합관리될 수 없어 작업분류체계(WBS)를 이용한 EVMS를 도입하여 공정별 공사비 세부집행현황을 파악하고자 한다. 이를 위해 도로건설사업을 대상으로 계획, 측정단계 중심으로 작업분류체계 및 관련 기능을 개발 및 적용하고자 한다.
Proceedings of the Korea Information Processing Society Conference
/
2003.05b
/
pp.939-942
/
2003
본 연구과제는 건설업체의 현재 문제점은 각 업체별로 상이한 분류 및 식별코드체계를 사용, 품목표기방식, 속성 포맷의 불일치, 용어와 단위의 불일치, 현 업계에서 사용하는 코드 분류체계는 호환이 되지 않고 국제적으로 사용할 수 없는 부적합한 실정이다. 따라 기존의 통합정보시스템과 별개로 관리 운영이 이원화되어 오던 각종 건설정보를 건설CALS/EC 핵심기술을 적용하며 건설표준 ERP 템플릿시스템을 개발 할 목적으로 한다. 따라서 본 연구에서는 건설표준 ERP 템플릿시스템과 건설통합분류체계의 표준코드의 연계로 건설CALS/EC 핵심기술이 적용된 건설표준ERP(통합DB)를 구축과 건설공사의 물량산출 데이터의 체계화된 물량예측과 물량공정의 통합화와 설계정보, 시공정보 및 관리유지정보의 연계하여 그리고 현장관리 및 원가관리정보의 통신망접속으로 건설통합정보를 제공한다.
Journal of the Korea Institute of Building Construction
/
v.10
no.1
/
pp.199-212
/
2010
To establish an infrastructure for technology and information in the domestic construction industry, several construction regulations pertaining to construction information have been institutionalized. However, there are major problems with the domestic information classification system, earned value management (EVM) and project management information system (PMIS). In particular, the functions of the current PMIS have consisted of a builder-oriented system, and as EVM is not applied to PMIS, the functions of reporting, analysis and forecast for owners are lacking. Moreover, owners cannot confirm information on construction schedule and cost in real time due to the differences between the EVM and PMIS operation systems. The purpose of this study is to provide a framework that is capable of operating PMIS efficiently under an e-business environment, by providing a proposal on how to establish a work breakdown structure (WBS) and an EVM - PMIS integration model, so that PMIS may provide the function of EVM, and stakeholders may have all information in common. At the core of EVM - PMIS integration is the idea that EVM and PMIS have the same operation system, in order to be an activity-based system. The principle of the integration is data integration, in which the information field of an activity is connected with the field of a relational database table consisting of sub-modules for the schedule and cost management function of PMIS using a relational database management system. Therefore, the planned value (PV), cost value (CV), actual cost (AC), schedule variance (SV), schedule performance index (SPI), cost variance (CV) and cost performance index (CPI) of an activity are connected with the field of the relational database table for the schedule and cost sub-modules of PMIS.
Proceedings of the Korean Information Science Society Conference
/
2012.06b
/
pp.16-17
/
2012
국토해양부는 지방국토관리청의 도로공사와 관련하여 발생하는 공사비 정보의 교환 및 공유를 목적으로 작업분류체계 기반의 공사비 관리 항목을 추가하여 전자설계도서 작성 납품 지침을 개정하였다. 이를 반영하고 문제점 개선 및 활성화를 위하여 5개 지방국토관리청에서 관리중인 10개 도로건설공사를 시범적용 사업으로 지정하여 발생하는 공사비 정보를 디지털 수량산출정보로 관리하고 있다. 시범사업을 진행하면서 건설공사에 발생하는 설계변경 업무를 전자화하여 관리하는 기능을 개발하고 추가 적용하였다. 이를 통해 건설사에서 생성한 설계변경 정보를 건설사와 발주처가 동일한 형태로 공사비 정보를 공유 및 관리 가능하도록 하였다.
Proceedings of the Computational Structural Engineering Institute Conference
/
2009.04a
/
pp.360-363
/
2009
토목구조물의 설계 패러다임이 2차원에서 3차원으로 전환될 때 효율성과 재활용성의 관건이 되는 기술적 제약사항이 호환성이다. 대부분의 캐드 엔진이 형상모델 수준에서 호환성 혹은 연계성을 지원하고 있지만 3차원 정보모델에서 요구하는 정보모델의 호환성은 지원하고 있지 않은 실정이다. 이 논문에서는 콘크리트 박스 교량에 대해서 3차원 교량 정보 모델을 구성하고 건설 프로세서에서 이를 활용할 수 있는 방안을 시범적으로 적용한 사례를 정리하였다. 적용 대상 구조물은 FSM 공법으로 시공되는 경간 40미터의 콘크리트 박스거더 교량이다. 견적, 시공시뮬레이션, 해석 등의 프로세서의 요구사항을 반영한 분류체계에 따라 형상모델의 체계를 정의하고 각각의 형상모델 단위에 정보를 부여하는 방식을 사용하였다. 개별 프로세서를 위한 솔류션에서 이러한 형상과 정보가 연계된 내용을 받아들이거나 캐드 엔진에서 필요한 형태로 내보내는 방식을 모두 시도하였다. 3차원 형상 모델과 시간이 부여된 4D 시뮬레이션을 활용하여 공사 스케쥴에 따라 모델 레이어 분류 작업으로 공사 진행 단계가 가상으로 보여진다. 시범 적용을 통해서 가상건설 시스템의 구성하는 개별 솔류션 혹은 정보체계에 대한 문제점과 개선사항을 도출하였다.
Kim, Song-Hwa;Kim, Sung-Kyum;Cho, Chang-Yeon;Son, Jae-Ho;Kim, Jae-On
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.403-407
/
2007
Korean Government conducted "a research for establishing the integrated construction information classification system" and suggested the classification system for the first and second level in terms of the complexity in May, 2001. The Ministry of Construction and Transportation announced a standard of the integrated construction information classification system using previous research in August, 2001. Since 2005, many BTL projects have been constructed for the educational facility. However, there is mixed official standard of the system for the educational facility. Moreover, it is difficult for the SPC to use the current "integrated construction information classification system", since the item in the educational facility cannot be easily located in the current system. Thus, this research suggests an efficient maintenance system for the educational facility. Two classification systems, space-oriented and element-oriented systems, are suggested to increase efficiency of the classification system.
Korean Journal of Construction Engineering and Management
/
v.5
no.6
s.22
/
pp.90-100
/
2004
The importance of information management has been emphasized in Korean construction industry, Both public and private have invested to establish and operate construction CALS, construction management (CM), computer integrated construction(CIC), and earned value management system(EVMS). A standard construction information classification system is essential to operate the systems mentioned above. Therefore, Korean government released Integrated Construction Information Classification System(ICICS) in 2001. However, the ICICS is not widely used in construction due to: 1) difficulty of changing existing system, 2) insufficient publicity of the ICICS, and 3) no legal binding force. Especially, participants in construction do not recognize applicability of the ICICS. This research surveyed the degree of recognition and utilization of the ICICS. This survey includes both customized classification systems used by companies and the ICICS and investigates the degree of utilization and drawbacks. The results show some construction companies use their own classification systems and the others use the ICICS prepared by the government. Furthermore, the degree of recognition is in sufficient. The degree of use in design management, specifications, cost and schedule management is very limited. The publicity and education are critical to induce the utilization of the ICICS. The necessity of revision was recommended based on pilot project study that is performed to measure the degree of application of ICICS on the projects. Therefore, this research proposes the measurement model for information application and analyzes the degree of utilization of the ICICS in different phases of construction.
Recently, the utilization of the BIM system has been extended to cost and resource simulation, visualized management of construction site information and application of augmented reality including basic 3D modeling. Therefore, various BIM functions are being developed for practical applications. However, since clear classification criteria and knowledge information of BIM functions are not sufficient for field engineers, it is difficult to identify the necessary BIM functions for a construction project. This study suggests a BIM function breakdown structure considering the individual functional properties and a process model that can be ordered by applying BIM in a railway construction project. The proposed delivery model is used to obtain a practical utilization of BIM by analyzing features applicable to railway construction projects; model is verified using a case project.
Korean Journal of Construction Engineering and Management
/
v.8
no.6
/
pp.159-166
/
2007
Work delay is one of the facts that make the reliability of construction projects decrease. Therefore, it is important to classify and prioritize the delay factors. This research analyzed key delay factors in apartment house construction through survey. The results of analysis are as follows. (1) Insufficient work force is the key delay factor in structural and finish work. (2) Improper craft of worker is the key delay factor in electrical work. (3) Incompletion of proceeding work is the key delay factor in mechanical work.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.