• Title/Summary/Keyword: 공사인력관리

Search Result 161, Processing Time 0.024 seconds

Development of Time-Cost Trade-Off Algorithm for JIT System of Prefabricated Girder Bridges (Nodular GIrder) (프리팹 교량 거더 (노듈러 거더)의 적시 시공을 위한 공기-비용 알고리즘 개발)

  • Kim, Dae-Young;Chung, Taewon;Kim, Rang-Gyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.12-19
    • /
    • 2023
  • In the case of the construction industry, the relationship between process and cost should be appropriately distributed so that the finished product can be delivered at the minimum fee within the construction period. At that time, it should be considered the size of the bridge, the construction method, the environment and production capacity of the factory, and the transport distance. However, due to various reasons that occur during the construction period, problems such as construction delay, construction cost increase, and quality and reliability degradation occur. Therefore, a systematic and scientific construction technique and process management technology are needed to break away from the conventional method. The prefab(Pre-Fabrication) is a representative OSC (Off-Site Construction) method manufactured in a factory and constructed onsite. This study develops a resource and process plan optimization system for the process management of the Nodular girder, a prefab bridge girder. A simulation algorithm develops to automatically test various variables in the personnel equipment mobilization plan to derive the optimal value. And, the algorithm was applied to the Paju-Pocheon Expressway Construction (Section 3) Dohwa 4 Bridge under construction, and the results compare. Based on construction work standard product calculation, actual input manpower, equipment type, and quantity were applied to the Activity Card, and the amount of work by quantity counting, resource planning, and resource requirements was reflected. In the future, we plan to improve the accuracy of the program by applying forecasting techniques including various field data.

Smart Water Management for Rural Water District for the pilot operating (농촌수자원 Smart 물관리를 위한 시범지구 운영)

  • Kim, Jin-Taek;Oh, Seoung-Tae;La, Min-Chul
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.444-444
    • /
    • 2012
  • 본 연구는 세계적인 기후변화와 물부족 현상에 따라 우리나라에도 향후 물부족에 대비한 농업용수의 친환경적인 적정 관리의 필요성이 절실해지고 있으며 친환경 녹색기술 개발과 농촌수자원의 체계적인 관리가 중요한 국가적인 문제로 대두되고 있다. 농촌은 고령화와 인구감소로 인하여 농업기반 수리시설과 농업용수의 전통적인 인력관리가 어려워지고 있으므로 이를 혁신할 수 있는 친환경, 녹색기술, 정보통신기술(ICT) 융합으로 농촌수자원 관리기술의 개발하고 이에 농업용수를 효율적인 관리를 위하여 농촌지역 수리시설과 농업용수 관리를 위해 정보통신기술과 센서네트워크 계측제어기술 및 모바일기술을 적용하여 농촌수자원 스마트 물관리를 위한 시범지구를 운영 하였다. 시범지구는 섬진강댐 수계의 동진도수로, 김제간선, 정읍간선으로 용수를 공급하는데 이중 수혜면적 17,600 ha, 수로연장 59 km의 김제간선에 시범지구로 선정하였다. 김제간선의 용수공급량은 년평균 163,748천톤의 공급하고 있다. 시범지구 운영은 5개년 중 1차년도(2011년)에는 현장시설 설치 총 87지점에서 15개소를 설치하였으며 시범지구의 영농 및 물관리 특성, 용수공급량 조사 분석하였으며 시범지구의 운영시스템 구축과 Smart 물관리 프로그램(Web, App)개발 하였다. 시범지구 운영은 한국농어촌공사 물관리분야 관련 신기술의 실용화를 위한 인큐베이트 역할을 하며 통합수자원관리시스템과 연계하여 체계적인 현장 물관리 기술의 보급과 공사의 대표적인 물관리 시범지구로 활용 및 사업 홍보 효과에 기여할 것으로 기대되고 있다.

  • PDF

An Application of Safety Management for Tunnel Construction Using RTLS Technology (RTLS기술을 이용한 터널공사현장의 실시간 안전관리 적용방안)

  • Kim, Dae-Won;Moon, Sung-Mo;Cho, Hun-Hee;Kang, Kyung-In
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.12-20
    • /
    • 2011
  • Recently, construction site scale has been growing larger along with the growth of national economy. As construction market requires time reduction, cost saving, and improving quality, a cutting-edge technology applied research has been gradually studied for more efficient project management. In particular, the Real Time Location System (RTLS) technology, a real-time location tracking system of construction resources, can be effectively used in safety management. This technology has been studied and applied in various industries including architectural, marine, urban, and other industries. However, although tunnel construction in civil engineering has a narrow space and many safety risks, there are not researched about this content. Therefore, this study proposes an advanced safety management model for tunnel construction using the RTLS technology and a measurement method of the feasibility of this model in the construction site.

Performance Evaluation of Recycled Synthetic Resins Euro-form by Injection Modeling Method (합성수지계 사출성형 재생유로폼의 성능 평가에 관한 연구)

  • Chung, Byeung-Yeul;Lee, Hyun-Chul;Kim, Jun-Hee;Go, Seong-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.105-113
    • /
    • 2010
  • Method or work type improvement is needed in relation to reducing cost and increasing efficiency by ensuring construction quality and reducing labor in the form work process. This would have a great influence on the entire construction process, and make the process of adopting materials and methods more rational and economic. Hence, this study aimed to develop a Synthetic Resins Euroform that could improve durability, water-proofing, sophistication, and organizational unity through the use of injection modeling. Accordingly, this paper first investigated various performance requirements and necessary techniques, and then verified feasibility by evaluating the physical safety and technical validity when it is applied to construction field. In addition, this study evaluated the constructability, safety performance, environmental performance, and systemic excellence in terms of maintaining convenience of Synthetic Resins Euroform. Moreover, to verify feasibility in the construction field, this study analyzed and evaluated the maximum stress by measuring the load and deformation of the space of the horizontal furring, which is attached to Euroform as an armature.

Highly Efficient Checklist for the Safety Management of Reinforced Concrete construction (철근콘크리트 공사의 효율적 안전관리를 위한 체크리스트 제안에 관한 연구)

  • Shim, Un-Jun;Suh, Hyung-Suk;Ahn, Yong-Sun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.7-17
    • /
    • 2010
  • Modern construction technology has been highly systemized, which has simplified the construction methods applied to construction sites. However, on reinforced concrete construction sites, there have recently been many new disasters, and these have been bigger than before due to the heavy dependency on manpower. This study investigates the cause and cases of disasters during reinforced concrete construction. In addition, the study surveyed the psychological condition of construction site personnel in relation to the safety awareness and the causes of disasters, while deriving the basic components related to disasters on construction sites in order to analyze the relationship between each component to suggest an efficient safety management measures checklist. Construction site personnel should utilize the results drawn from this study as a disaster prevention tool to use in a safety education class, and not consider this simply as statistical data, but as a checklist to ensure full awareness of the appropriate priorities for safety categories to utilize in the reinforced concrete construction in order to execute reasonable safety management.

Improvement of Personnel Cost and Placement Scale of Quality Manager for Construction (건설공사 품질관리자의 인건비 및 배치규모 개선)

  • Lee, Chang-Hyo;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.2
    • /
    • pp.327-335
    • /
    • 2018
  • In order to calculate the quality management cost of construction work, the process must conform to relevant laws and regulations. In details, the cost of the various items such as quality test fee and quality control activity cost are required to be calculated. Regarding the quality management costs, the labor cost is applied to the quality examination fee and the calculation unit quantity in the construction quality management duties. The application of the unit price of the labor cost stipulates that Construction Association of Korea and Korea Engineering & Consulting Association apply the unit price which is surveyed and published. However, in the related laws and regulations, the standard of the quality manager and quality tester is not clear. This accounts for the confusion in the cost of construction management and the cost of labor. In the current law, the allocation standard of quality control personnel is specified according to the size of the construction, but the standard of placement of quality testers is not specified. At the construction site, there is no assignment criteria manpower for quality testers except quality managers, or very little work is being done. The quality control personnel conducts the quality test work to be carried out by the quality tester, and this carrying out heavy work. Therefore, it is difficult to maintain quality control activities. In this study, the labor cost of quality management expenses and the allocation criteria of quality managers and quality testers are established and presented for the purpose of securing the quality of the construction work and preventing the construction work. It is stipulated that the standards of the relevant laws and regulations, which are not clear, should be classified into quality control personnel and quality testers according to the size of the construction. Based on the unit price of Korea Engineering & Consulting Association, the personnel expenses of quality managers and quality testers are proposed to apply the unit price of engineer (professional engineer, specialist, advanced, intermediate, beginner) and skilled technicians (advanced, intermediate, beginner).

Development of Wireless Communication System and Application Program for Realtime Schedule Management at Construction Site (건설현장 실시간 공정관리를 위한 무선통신시스템 구축 및 응용프로그램 개발)

  • 진교홍;이혜원;김지홍
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.8 no.1
    • /
    • pp.192-199
    • /
    • 2004
  • As the construction site becomes larger, more complex and more special, the information of construction is expanded in quantity and specialized in quality. Therefore the computing system is necessary to effectively manage the construction schedule management. At present, main office at construction site bring in the computing system to perform the schedule management, so the data input and access for schedule management is performed by engineer on foot between construction site and main office. Therefore in this paper, we arrange wireless communication system between construction site and main of office and develop application program for data input and access of schedule management immediately using PDA at construction site. Through the our system we can improve the schedule management at construction site, and we can look forward to reduction of manpower, equipments, time, and money in whole construction.

Improvement plan going into other countries of domestic construction companies (국내 건설업체의 해외진출 활성화 방안)

  • Park, Hwan-Pyo;Shin, Eun-Young;Lee, Kyo-Sun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.225-234
    • /
    • 2008
  • The engineering competitiveness of domestic construction companies is 70$\sim$80% of advanced countries. And Korean' companies fall behind China and South-East Asia in a competitive price. Recently, there are increased the amount of overseas order received in Korean construction companies. But, there is not enough the supporting policy of government. Therefore, this research compared and analyzed the competitiveness of domestic construction companies throughout benchmarking support system of overseas construction in advanced companies. Such research was obtained through business trip & consultation with related specialists for the difficulties of domestic companies in advancing into overseas market. This research provided governmental plans to advance into overseas market. First, this research provided assurance system and connected plan of ODA(Official Development Assistant) in construction. Second, this research suggested the improvement of overseas marketing survey and overseas construction marketing center. Third, this research provided the support system of bidding information and the training system of professionals.

가입자시설 집중보전 시스템 개발

  • Gang, Seong-Su;Kim, Dong-Su
    • ETRI Journal
    • /
    • v.5 no.3
    • /
    • pp.39-47
    • /
    • 1983
  • 수작업에 의한 보전관리방식은 고장신고에 의하여 수행되는 사후 관리방식으로서 가입자 회선의 급속한 증가에 따라 필요한 보전 인력 확충이 어렵고 보전 작업량의 예측이 힘들어 정확한 보전계획 수립이 불가능하다. 또한 고도로 숙련된 운용요원을 요구하는 수동식 시험대는 교환기종마다 상이하여 획일적인 보전관리가 이루어지지 않는다. 이러한 문제점을 해결하기 위하여 가입자 시설 집중보전 시스템 (SLMOS)을 개발하였다. SLMOS구성은 일정 지역별로 지역보전 센터를설치, 여러 전화국을 수용하는 형태로서, 가입자 고장신고 접수 및 수리시험 요원을 집중시켜 인력절감을 꾀하며 각종 보전업무의 전산화로 가입자 서어비스의 질적 향상 및 능률적인 보전관리를 도모한다. 가입자 고장신고는 집중화된 접수요원이 담당하며 전화번호만 key-in시키면 고장원인 및 수리약속 시간이 CRT화면에 나타나므로 가입자에게 정화한 정보를 제공한다. 지역보전 센터의 프린터에는 접수요원이 받은 고장신고 내용 및 심야에 실시된 예방시험의 결과가 출력되므로 통제석에서 이를 분석, 해당 수리 시험석으로 분배한다. 모든 요원의 작업내용은 고장기연 data base에 저장되므로 지역보전 센터 의 관리자는 원하는 각종 통계, 분석 자료를 출력시킬 수가 있어 보전업무의 효율적 운영을 할 수 있게된다. SLMOS의 software개발에 UNIX 0S를 사용함으로써 machine independence와 시스템의 융통성 및 Portability를 추구하고있으며 신고접수, 수리에 mask기법및 한글사용으로 용이하게 시스템을 사용할 수 있도록 하였다. 자동 선로시험 장치에 $\mu$-processor를 내장시켜 예방시험 기능의 추가와 자동 고장판정으로 운용요원의 기량에 의존하는 방식의 탈피를 시도하였다. 본 연구개발은 81년에 착수하여 84년에 완료할 예정이며 82년말 중앙전화국 시험실에서 연구소 computer와 on-line 방식으로 시험 운용을실시하였다. 83연도에 시스템기능을 보완 및 추가 개발하고 84년도에 현장 및 실용화 시험을거쳐 한국전기통신공사에 공급할 계획이다.

  • PDF

A Study on the Priority Safety Management Items in the Medium and Small sized Construction Sites (중·소규모 건설현장 중점 안전관리 항목에 관한 연구)

  • Jang, Yun-Ra;Go, Seong-seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.38-49
    • /
    • 2020
  • As the quality of life has been improving, people are getting higher interest and higher expectation for safety. However, the accident rate at the construction site is still high. Therefore, it is urgent to secure the safety at the construction work. Due to the nature of the construction industry, construction sites are directly exposed to the external environment. The possibility of accident occurrence is increased due to various factors such as the always variable processes, the diversity of manpower input, the increase in vulnerable class, and the danger of construction equipment..Particularly, the disasters occurring at the small- or medium-sized construction sites (budget ≤ 12 billion KRW) account for 88.9% of the total disasters at construction sites (73.4% for casualty). It was due to the lack of management caused by the absence of supervisors and insufficient safety measures. Moreover, it is difficult for the small- or medium-sized construction sites to apply basic safety measures such as safety education and safety facility installation by themselves in order to prevent disasters because they don't have sufficient safety organizations. It is because they have relatively less safety personnel and poorer technology system than large-sized construction sites. Therefore, in order to reduce accidents in construction, it is necessary to prevent accidents at the small- and medium-sized construction sites. From this point of view, the objectives of this study were to identify the key risk items causing accidents frequently by analyzing the accidents at construction sites and identifying problems associated with safety management, and to secure the safety at the small- and medium-sized construction sites.