• Title/Summary/Keyword: 공사이력

Search Result 69, Processing Time 0.023 seconds

A Study on the Life Cycle Cost Analysis of Light Railroad Transit Bridges (경량전철 교량의 생애주기비용 분석에 관한 연구)

  • Lee, Du-Heon;Kim, Kyoon-Tai;An, Dong-Geun;Jun, Jin-Taek;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.384-389
    • /
    • 2006
  • The needs for Light Railroad Transit(LRT) have been increased due to the heavy traffic congestions in large cities like Seoul, Korea. Korean government is seeking the LRT system development (including planning, designing, construction, and maintenance and operations) in terms of public-private-partnership (PPP). At the private sector side, it is crucial to estimate the life cycle cost (LCC) to project the cash flow during the O&M period. Since the most construction and O&M cost of LRT project is at the bridge construction, a cost analysis model and a cost breakdown structures (CBS) on LRT bridges are discussed through in depth literature reviews. Construction and maintenance cost of bridges are collected and analyzed. LCC is analyzed by types of bridge superstructures and historical data of repair and rehabilitation (R&R) is investigated. There have been scarce number of LCC analysis on railway bridges. This research delivers a well-defined CBS and maintenance cost data, which will be a great benefit to the systematic maintenance strategy development for railroad bridges.

  • PDF

COBie Document Prototype for supporting BIM based Smart Maintenance of Buildings (BIM 기반 건축물 스마트 유지관리 지원 COBie 문서 프로토타입)

  • Koo, Kyo-Jin;Park, Sang-Hun;Cho, Dong-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.12
    • /
    • pp.60-68
    • /
    • 2019
  • For effective building maintenance, the collection and management of various maintenance date such as work history information and material information is required. Despite the introduction of information management technologies and systems to reduce the amount of maintenance work of buildings, which have become larger and more complex, the maintenance information is not being utilized properly. As an alternative, research on the introduction and utilization of BIM is being conducted continuously. However, the BIM models generated at the design phase are not utilized in practice due to a lack of architectural maintenance information. This study proposed a COBie document prototype to support BIM-based smart maintenance tasks performed by building managers. In order to formalize various types of maintenance work procedures, a BIM-based maintenance process model is presented in two categories: inspection and maintenance. Among the BIM attribute data of the BIM model generated at the design phase, the parameters corresponding to the maintenance necessary information for each basic process are derived. Based on this, we proposed a COBie document prototype consisting of seven spreadsheets. The results of a case study confirmed that the KBIMS library-based BIM model created at the design phase without the maintenance information can be used at the maintenance phase.

A Study of the Advanced Strategy for ICT-based Public Compensation Business (ICT 기반 공익사업 보상업무 첨단화 방안 연구)

  • Seo, Myoung Bae
    • Smart Media Journal
    • /
    • v.9 no.1
    • /
    • pp.75-83
    • /
    • 2020
  • Compensation services that are indispensable during large-scale public utilities projects have been gradually increasing with the recent increase in construction, but there are no systematic compensation services due to the complicated procedures and manual work. For this reason, various problems such as construction period delays due to various complaints, corruption in compensation work, and impossible to trace the history of compensation data in the past are emerging. In this paper, in order to solve this problem, in-depth interviews and questionnaires were conducted to find out the problems of each compensation status. Based on this, 3 core technologies and 10 technical needs based on ICT were selected to improve the compensation work by deriving STEEP analysis and Issue Tree. The three core technologies are big data-based decision-making and prediction technology, advanced measurement technology, and open cloud-based compensation platform technology. In order to introduce the derived technologies to the institutions in charge of compensation, the possibility of technology diffusion by project operators was suggested based on the results of the current status of informatization by institution. Based on the core technology derived from this paper, it is necessary to make a prototype that can be advanced in compensation work and apply it to each institution and analyze the effect.

A Study on the Necessity and Applicability of Interactive Electronic Technical Manual(IETM) for Construction Projects (건설분야 전자매뉴얼의 필요성 및 특성분석을 통한 실무적용성 연구)

  • Kang, Leen-Seok;Jung, Won-Myung;Kwak, Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.99-108
    • /
    • 2005
  • Interactive electronic technical manual(IETM) for construction projects means an electronic tool that regulations and specifications related to construction method or maintenance process ale described by electronic book type. It has a meaning of integrated information system that includes virtual reality(VR), 3D animation and image contents for representing real construction information so that user can easily understand the construction situation and maintenance process. The basic information and technical manuals of construction facilities are being written as paper documents in our construction industry. As the result, the information management in the maintenance phase of construction projects is inefficient, and maintenance cost is being increased. This study attempts to improve the lack of understanding about construction IETM through the analysis of necessity and unique function of construction IETM comparing with the IETMS in other industry, Finally, this study shows a scenario of construction IErM for mitigating natural disaster of construction facilities to verify applicability of IETM.

A study on estimation status and improvement plan of the repair and replacement cycle of a building (건축물 수선교체주기 산정현황과 개선방안에 관한 연구)

  • Kim, Jong-Rok;Son, Jae-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.193-198
    • /
    • 2010
  • This study aimed at presenting the improvement plan for estimation of the repair and replacement cycle to analyze these current problems by considering the repair and replacement cycle theoretically and examining estimation status of home and abroad, and then drawing implication and problem based on brainstorming and expert opinion. The findings of a study is as follows. First, the problem is, for the domestic, that there is no clear standard of division to the cycle of repair and replacement and the repair and replacement cycle considering capability to deal with the change by construction method, development of the function of material and the number of years of progress is not being applied. That is, an estimation of economical repair and replacement cycle which considers the case that a large scale repair with the level of remodeling is done between 25 years and 35 years is necessary. For estimating the repair and replacement cycle, foreign country is providing this according to the use or the level of function of a building, but it is not the case for the domestic. A characteristic of each building should be reflected and the standard of estimation of the repair and replacement cycle to new construction material or method should be prepared to improve this. In addition, the method of classification of the subject item for the repair and replacement is necessary to be reorganized to be able to apply the standard of initial construction item of a building. Also, it is considered that a service standard which can reset the repair and replacement cycle based on status of a building with escape from the existing definite setup of the repair and replacement cycle through the management of background data of the repair and replacement is going to be necessary.

A Study on Estimating of Probability Distribution and Mean Life of Bridge Member for Effective Maintenance of the Bdrige (효율적인 고속도로 교량의 유지관리를 위한 교량 부재별 수명분포 및 평균수명 산정 방안 연구)

  • Lee, Yongjun;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.57-65
    • /
    • 2016
  • This study found a proper parametric life distribution based on maintenance history data of each bridge member under the jurisdiction of the Korea Expressway Corporation for the past 10 years by introducing the concept of reliability and suggested a measure to calculate the mean life and reliability of each bridge member using the parameter obtained with the maximum-likelihood classification. As a result of analyzing the exponential distribution, weibull distribution and log normal distribution being utilized frequently in order to find the parametric life distribution type which well described the life data of each bridge member, it was found that the log normal distribution and weibull distribution described the characteristics of the relevant life data the best. As a result of calculating the mean life of each bridge member based on the estimated parameter, the average life of the steel bridge coating was 18.51 years which was the longest, followed by the bridge deck as 17.56 years. The mean life of the drainage facility and the bridge bearing were 12.27 years and 12.57 years respectively, showing the shortest life.

Field Application of RFID for the Cavity Maintenance of Under Pavement (도로하부 공동의 유지관리를 위한 RFID의 현장 적용성 평가)

  • Park, Jeong Jun;Shin, Eun Chul;Kim, In Dae
    • Journal of the Society of Disaster Information
    • /
    • v.15 no.4
    • /
    • pp.459-468
    • /
    • 2019
  • Purpose: The cavity exploration of the lower part of the road is carried out to prevent ground-sinking. However, the detected communities cannot be identified by the cavity location and history information, such as repackaging the pavement. Therefore, the field applicability of RFID systems was evaluated in this study to enable anyone to accurately identify information. Method: During temporary recovery, tag recognition distance and recognition rate were measured according to underground burial materials and telecommunication tubes using RFID systems with electronic tag chips attached to the bottom of the rubber cap. Result: The perceived distance and perceived rate of depth for each position of the electron tag did not significantly affect the depth up to 15cm, but it did have some effect if the depth was 20cm. In addition, water effects from nearby underground facilities and rainfall are relatively small, and the effects of wind will need to be considered during the weather conditions of the road. Conclusion: The RFID tags for field application of the pavement management system store various information such as location and size of cavity, identification date, cause of occurrence, and surrounding underground facilities to maximize cavity management effect with a system that can be computerized and mobile utilization.

A Fundamental Experiment for Field Application of the under Pavement Cavity Management System Using RFID (RFID를 이용한 도로하부 공동 관리 시스템의 현장 적용을 위한 기초 실험)

  • Shin, Eun Chul;Park, Kwang Seok;Park, Jeong Jun
    • Journal of the Society of Disaster Information
    • /
    • v.15 no.3
    • /
    • pp.391-401
    • /
    • 2019
  • Purpose: In this study, the location and history information of the cavity identified in the cavity exploration, such as repacking of the pavement, is not known. Therefore, it is to review the field applicability of RFID(Radio Frequency Identification) systems that enable anyone to accurately identify information. Method: Basic experiments were conducted for field applicability for cavity recognition distance, recognition and recognition rate, tag performance and tag type, reader interference, communication, underground burial impact, and duplicate recognition by RFID system. Results: As a result of the depth of tag and reader recognition, the electronic tag chips and readers applied in the basic experiment are judged to be effectively applicable in the field environment where the road cavity is located. Conclusion: The RFID tags for field application of the pavement management system store various information such as location and size of cavity, identification date, cause of occurrence, and surrounding underground facilities to maximize cavity management effect with a system that can be computerized and mobile utilization.

Improvement Strategy & Current Bidding Situation on Apartment Management of Landscape Architecture (공동주택 조경관리 입찰 실태와 개선방안)

  • Hong, Jong-Hyun;Park, Hyun-Bin;Yoon, Jong-Myeone;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.48 no.4
    • /
    • pp.41-54
    • /
    • 2020
  • This study was conducted to provide basic data for a transparent and fair bidding system by identifying problems and suggesting improvement measures through an analysis of the bidding status for construction projects and service-related landscaping of multi-family housing. To this end, we used the data from the "Multi-Family Housing Management Information System (K-apt)" that provides the history of apartment maintenance, bidding information, and the electronic bidding system to examine the winning bid status and amount, along with the size and trends of the winning bids by year, and the results of the selection of operators by construction type. As a result, it was found that out of the total number of successful bids (36,831), 4.4% (16,631) were in the landscaping business, and the average winning bid value was found to be about 24 million won. According to the data, 73% of the landscaping cases were valued between 3 million won and 30 million won, and 58.6% of the cases were in the field of "pest prevention and maintenance". 36% of the total number of bids were awarded from February to April, with "general competitive bidding" accounting for 59.8% of the bidding methods. As for the method of selecting the winning bidder, 55% adopted the "lowest bid" and "electronic bidding method," and 45% adopted the "qualification screening system" and "direct bidding method." As an improvement to the problems derived from the bidding status data, the following are recommended: First, the exception clause to the current 'electronic bidding method' application regulations must be minimized to activate the electronic bidding method so that a fair bidding system can be operated. Second, landscaping management standards for green area environmental quality of multi-family housing must be prepared. Third, the provisions for preparing design books, such as detailed statements and drawings before the bidding announcement, and calculating the basic amount shall be prepared so that fair bidding can be made by specifying the details of the project concretely and objectively must be made. Fourth, for various bidding conditions in the 'business operator selection guidelines', detailed guidelines for each condition, not the selection, need to be prepared to maintain fairness and consistency. These measures are believed to beuseful in the fair selection of landscaping operators for multi-family housing projects and to prepare objective and reasonable standards for the maintenance of landscaping facilities and a green environment.