• Title/Summary/Keyword: 공사비 영향요인

Search Result 116, Processing Time 0.021 seconds

Analysis of Factors for Improvement of Economic Feasibility of Construction Cost to Spread Application of OSC Construction Method for Apartment Housing (공동주택 OSC공법 적용 확산을 위한 공사비 분야 경제성 개선 요인 분석 - PC 부재 설계, 제작, 운송, 시공을 중심으로 -)

  • Yun, WonGun;Shin, Eun-Young;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.55-63
    • /
    • 2021
  • Recently, as the problem of the traditional on-site labor-intensive construction production method has been raised due to changes in construction work labor and site conditions, the OSC method is gradually spreading as an alternative to this. Even in apartment houses, the application of the PC method is expanding centered on the underground parking lot, but the high cost structure is a problem compared to the conventional formwork method. In this study, factors affecting the calculation of construction cost in the economic evaluation, which are the core of determining the construction method for apartment buildings, are derived through domestic and foreign literature review and expert advice, the importance was analyzed through an opinion survey targeting industry experts. The measures to reduce construction cost were mainly derived from the improvement of the design and manufacturing process. It is expected that the factors affecting the construction cost and improvement measures of the PC method derived from this study will serve as a direction for technology development to spread the application of the PC method for apartment houses in the future.

Cost Prediction Model using Qualitative Variables focused on Planning Phase for Public Multi-Housing Projects (정성변수를 고려한 공공아파트 기획단계 공사비 예측모델)

  • Ji, Soung-Min;Hyun, Chang-Taek;Moon, Hyun-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.91-101
    • /
    • 2012
  • In planning phase of Public Multi-Housing Projects, it is required to develop the methodology and criteria for fair cost prediction with influencing power from planning phase to occupancy phase. Many studies still have focused on the prediction of cost by multiple regression. However, there is no logical explanation about the influence of nonmetric variables for the prediction of cost in planning phase. Accordingly, this research pursues a cost prediction model including nonmetric variables for use in planning phase. There are 3 steps of this research : 1) Finding the factors influencing construction cost and assigning variables for a multiple regression. 2) Conducting a dummy regression analysis with nonmetric variables and model validation by comparing actual cost data. 3) Developing the ratio of RC structure cost to wall structure cost by using cost predection model. The results could establish cost prediction process including the influence of nonmetric variables and the ratio of RC structure cost to wall structure cost.

Development of an Effective Time Scheduling Mechanism of the Structural Framework for the High-rise Apartment Housing -Focusing on One Cycle Time Scheduling Mechanism of Typical Floor- (아파트 골조공사의 공기단축 및 효과적 공정운영 방안 -기준층 사이클 공정분석을 중심으로-)

  • Han Choong-Hee;Bang Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.87-96
    • /
    • 2004
  • The construction duration in apartment construction is an important factor which affects project cost. Henceforth, the time shortening is essential to retrench project cost and project risk when there adopt Five-Day Workweek and introduce apartment sales after completion of construction. Therefore, the purpose of this study is to examine closely the affecting factors on the duration of framework which forms about $40\sim50\$ percent of total time in apartment construction by analyzing the schedule mechanism of typical floor and to show the reasonable time shortening methods by case study. The shown schedule mechanism and basic schedule table can utilize as a guideline in case of scheduling of framework in the existing construction method. Also, the shown time shortening methods by three case studies will guide the direction and process of time shortening while there need time shortening in many-sided projects.

Empirical Examination of Determinants Affecting Safety Incidents in Building Construction (건축공사 안전사고에 대한 현장 요인별 영향력 분석)

  • Hur, Youn-Kyoung;Lee, Seung-Woo;Yoo, Wi-Sung;Song, Tae-Geun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.583-593
    • /
    • 2023
  • For a holistic and precise assessment of safety benchmarks within a construction venture, it's paramount to delineate between the intrinsic features of the construction and its real-time, on-site performance metrics. In this study, we delved into genuine accident instances to discern the interplay between these construction attributes and on-ground performance determinants in relation to safety mishaps, employing the binomial logit analytical framework. Our scrutiny underscored that construction expenditure profoundly modulates the likelihood of fatal occurrences. Notably, variables pertinent to on-site safety protocols wielded considerable influence over both fatal mishaps and accidents implicating multiple personnel. These revelations intimate that while ascertaining the safety quotient of a construction initiative, a mere classification and recalibration based on fiscal dimensions can elucidate much. Yet, a comprehensive safety appraisal necessitates transcending quantitative indices, such as frequency of mishaps or casualty rates, to encapsulate the multifaceted interventions and strategies adopted at the construction locale.

A Study on Collusion Effects for Bid Award in Public Construction Works (공공 건설공사 담합이 낙찰에 미치는 영향 분석 연구)

  • Kim, Myeongsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.12-20
    • /
    • 2020
  • To estimate collusion effects on bid award in Public Construction works, this paper uses Logit Model, which is a choice variable model. Price, design, competition, and other factors are included, with a special focus on collusion, as independent variables in the model. The empirical results are as follows. First, collusion has little effects on bid award, but great impacts on bidding behavior. Secondly, the score of design is the most important and significant factors among all variables. Thirdly, competition has also significant effects on bid award. Finally it is analyzed that institutional framework and characteristics of public work have some effects on bidding award.

A Study on the Estimate Criteria and Influence Factors of Construction Duration of Domestic Firms -Focused on the Apartment Building Firms- (국내 건설 업체 공기산정 기준 및 영향요인 연구 -공동주택 중심으로-)

  • Kim Sun-Yeop;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.447-450
    • /
    • 2004
  • The domestic construction industry have focus on duration than construction cost. But recently it have interesting to The domestic construction industry, social requirement is changing. At the moderate speed duration has other angle of reducing cost and management of efficiency. specially Apartment building construction process is similar to other construction industry so it Is obtain a strong Point. This study on, A Target of construction industry is short duration than other it, general construction duration in summary schedule of level is studied, is based and construction duration for the point it is indicated reduction duration

  • PDF

Analysis on Characteristic of Construction Cost for Steel Box Bridge (강박스교량 공사비 특성 분석)

  • Sun, Chang Won;Kyung, Kab Soo;Kang, Shin Hwa;Kwon, Soon Cheol
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.1
    • /
    • pp.1-14
    • /
    • 2009
  • Estimating appropriate construction cost at the design phase is judged with one important issue to the efficient security and the execution of budget. Therefore, in this paper, to build fundamental data of appropriate construction cost for steel box bridges, the existing calculated document such as the quantity, unit price document and detail items etc.. was analyzed and the basic specification of the bridges was investigated. Also, by estimating the relationship between predetermined cost and construction items on the bridges, the paper is intended to produce basic data for the calculation of appropriate construction cost in planning phase. From the result, it was calculated ratio of construction item in the total construction cost and unit cost. And then it was deduced effect factor of construction cost in steel box bridge.

Analysis of the Technology Adoption Impact Factors for Automated Construction Equipment (건설 자동화 장비 도입을 위한 기술도입 영향요인 분석)

  • Lee, Chijoo;Lee, Ghang;Sim, Jaekyang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.56-64
    • /
    • 2013
  • New construction technologies, especially automated equipment, are rarely deployed on a construction site where many accidents and claims occur. This study analyzed and derived impact factors for technology adoption to improve the chance of adopting automated construction equipment to the field. First, impact factors were classified into functional and non-functional factors. Then the functional factors were divided into usability and functionality factors, and the non-functional factors into cost, construction property, and organization factors. Next, the importance and realization possibility of each impact factor were analyzed through a survey with experts. Usability and functionality were analyzed to have the highest importance and realization possibility. Lastly, the differences between construction companies and equipment development companies in the importance and realization possibility of each factor were analyzed. Construction companies recognized previous relationship, operator's attitude, members' will, and construction quality more important than equipment development companies.. The equipment development companies should consider these differences between the view of construction companies and that of equipment development companies on the impact factors. The result of this study can be used as a basis for evaluating for automated construction equipment in the preliminary development phase.

Development of Basic Construction Cost Estimation Model for Expansion of Underground Parking Lot Remodeling in Apartment Housing (공동주택 지하주차장 확대 리모델링 개략 공사비 산정 모델 개발)

  • Jeong, Eunbeen;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.42-52
    • /
    • 2021
  • The cost of remodeling parking lots of apartment houses accounts for about 20 percent of the total cost of remodeling. This means that when the remodeling cost of the underground parking lot is known, it becomes possible to estimate the total construction cost. The standard of estimation referenced when calculating the construction cost is difficult to apply to calculating the remodeling cost. Thus, a construction cost estimation model that reflects the characteristics of remodeling construction is necessary. This study developed a basic construction cost estimation model for expansion remodeling of underground parking lots of apartment houses that calculates the approximate cost of construction by reflecting the characteristics and design elements of remodeling. Based on literature review and consultation with experts, 37 activities of underground parking lot remodeling construction were derived. In order to enable calculation of approximate construction cost before the remodeling design drawing is finalized, the quantity calculation formula and unit price for each activity were presented. Based on expert advice, 13 factors that affect the increase in construction cost and weights of each factor were determined. As a result of applying three cases of remodeling complexes to the basic cost estimation model, the accuracy was confirmed to be 93 percent on average.

Development of Approximate Cost Estimate Model for Aqueduct Bridges Restoration - Focusing on Comparison between Regression Analysis and Case-Based Reasoning - (수로교 개보수를 위한 개략공사비 산정 모델 개발 - 회귀분석과 사례기반추론의 비교를 중심으로 -)

  • Jeon, Geon Yeong;Cho, Jae Yong;Huh, Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1693-1705
    • /
    • 2013
  • To restore old aqueduct in Korea which is a irrigation bridge to supply water in paddy field area, it is needed to estimate approximate costs of restoration because the basic design for estimation of construction costs is often ruled out in current system. In this paper, estimating models of construction costs were developed on the basis of performance data for restoration of RC aqueduct bridges since 2003. The regression analysis (RA) model and case-based reasoning (CBR) model for the estimation of construction costs were developed respectively. Error rate of simple RA model was lower than that of multiple RA model. CBR model using genetic algorithm (GA) has been applied in the estimation of construction costs. In the model three factors like attribute weight, attribute deviation and rank of case similarity were optimized. Especially, error rate of estimated construction costs decreased since limit ranges of the attribute weights were applied. The results showed that error rates between RA model and CBR models were inconsiderable statistically. It is expected that the proposed estimating method of approximate costs of aqueduct restoration will be utilized to support quick decision making in phased rehabilitation project.