Kim, Seon-Ho;So, Jae-Min;Kang, Shin-Uk;Bae, Deg-Hyo
Journal of Korea Water Resources Association
/
v.50
no.7
/
pp.489-502
/
2017
The objective of this study is to propose and evaluate the BAYES-ESP, which is a dam inflow prediction method based on Ensemble Streamflow Prediction method (ESP) and Bayesian theory. ABCD rainfall-runoff model was used to predict monthly dam inflow. Monthly meteorological data collected from KMA, MOLIT and K-water and dam inflow data collected from K-water were used for the model calibration and verification. To estimate the performance of ABCD model, ESP and BAYES-ESP method, time series analysis and skill score (SS) during 1986~2015 were used. In time series analysis monthly ESP dam inflow prediction values were nearly similar for every years, particularly less accurate in wet and dry years. The proposed BAYES-ESP improved the performance of ESP, especially in wet year. The SS was used for quantitative analysis of monthly mean of observed dam inflows, predicted values from ESP and BAYES-ESP. The results indicated that the SS values of ESP were relatively high in January, February and March but negative values in the other months. It also showed that the BAYES-ESP improved ESP when the values from ESP and observation have a relatively apparent linear relationship. We concluded that the existing ESP method has a limitation to predict dam inflow in Korea due to the seasonality of precipitation pattern and the proposed BAYES-ESP is meaningful for improving dam inflow prediction accuracy of ESP.
Both competent authorities and private entrepreneurs face plenty of risks when negotiating BTO(Build Transfer Operation) methods of PPI(Private Participations in Infrastructures) projects. Also, success and failure of projects largely depend on the concession agreement contract. In this study, for more efficient negotiation, major issues are examined, and quantitatively analyzed to find out not only the relationship but also the characteristics of which these issues share. Questionnaire research was conducted through both research and by experts who were divided into an ordering agency, design company and constructor. Characteristics of major issues were quantitatively analyzed using the Likert index method, ANOVA(ANalysis of VAriance) and AHP(Analytic Hierarchy Process) analysis. Case studies were examined in order to estimate construction cost, rates of return, government finance support, level of operation-revenues guarantees, estimating operational costs and usage fees. With these 6 items, relative priority, relative impression which is sensible to risk and extent of difficulty in presenting data which is objective were quantitatively analyzed by the ordering agency, design company and constructor groups. From the analysis, there were some similarities between the design company and constructor groups while there was less of similarities between the ordering agency and design company or constructor. The government is diversifying the methods of project promotion, and PPI project from infrastructure-centered to public culture facilities are being expand. The current study will provide not only supporting efficient negotiation but also revitalizing PPI projects.
Korean Journal of Construction Engineering and Management
/
v.9
no.6
/
pp.137-146
/
2008
Both competent authorities and private entrepreneurs face plenty of risks when negotiating BTO(Build Transfer Operation) methods of PPI(Private Participations in Infrastructures) projects. Also, success and failure of projects largely depend on the concession agreement contract. In this study, for more efficient negotiation, major issues are examined, and quantitatively analyzed to find out not only the relationship but also the characteristics of which these issues share. Questionnaire research was conducted through both research and by experts who were divided into an ordering agency, design company and constructor. Characteristics of major issues were quantitatively analyzed using the Likert index method, ANOVA(ANalysis of VAriance) and AHP(Analytic Hierarchy Process) analysis. Case studies were examined in order to estimate construction cost, rates of return, government finance support, level of operation-revenues guarantees, estimating operational costs and usage fees. With these 6 items, relative priority, relative impression which is sensible to risk and extent of difficulty in presenting data which is objective were quantitatively analyzed by the ordering agency, design company and constructor groups. From the analysis, there were some similarities between the design company and constructor groups while there was less of similarities between the ordering agency and design company or constructor. The government is diversifying the methods of project promotion, and PPI project from infrastructure-centered to public culture facilities are being expand. The current study will provide not only supporting efficient negotiation but also revitalizing PPI projects.
Proceedings of the Korea Water Resources Association Conference
/
2009.05a
/
pp.1812-1816
/
2009
이미지 해석에 의한 유속장 측정방법은 유체역학분야에서 지난 30 여년 동안 많이 활용되어온 속도측정 기법으로 오늘날에는 이를 수공학 분야에서 이를 유량측정 등 수리현상 해석에 활용하려는 시도가 다각적으로 이루어지고 있다. 이에 본 연구에서는 이미지 해석에 의한 유속장 측정방법을 용담댐 시험유역에 적용하여 그의 자연하천에서의 적용성을 검토하고자 한다. 이미지 해석에 의한 유속장 측정방법은 PIV(Particle Image Velocimetry)로 통칭되고 있으며, PIV는 seeding, illumination, recording, 및 image processing의 네 가지 요소로 구성된다. seeding을 위해서 유체를 따라 흐를수 있는 작은 입자를 유체에 첨가한다. 유체를 따라 흐르는 입자들의 선명한 이미지를 얻기 위해서illumination이 필요하다. PIV를 이용하여 흐름을 해석하기 위한 illumination은 일반적으로 이중펄스 레이저가 이용된다. 이렇게 유속장 해석을 하려는 유체에 대하여 seeding 및 illumination이 준비되면 단일노출- 다중 프레임법, 혹은 다중노출-단일 프레임법으로 흐름을 recording을 한다. image processing은 이미지를 다운로드하고, 디지타이징 및 화질향상을 하는 전처리(pre-processing), 상관계수의 산정에 의한 유속 벡터의 결정 및 에러 벡터를 제거하고 유속장을 그래프화하는 후처리(post-processing) 과정으로 구성된다. LSPIV(Large Scale PIV)는 PIV의 기본원리를 근거로 하여 기존의 PIV에 비하여 실험실 내에서의 수리모형실험이나 일반 하천에서의 유속측정과 같은 큰 규모$(4m^2\sim45,000m^2$)의 흐름해석을 할 수 있도록 Fujita et al.(1994)와 Aya et al.(1995)이 확장시킨 것이다. PIV와 비교시 LSPIV의 다른 점은 넓은 흐름 표면적을 포함하기 위하여 촬영시에 카메라의 광축과 흐름 사이의 각도가 PIV에서 이용하는 수직이 아닌 경사각을 이용하였고 이에 따라 발생하는 이미지의 왜곡을 제거하기 위하여 이미지 변환기법을 적용하여 왜곡이 없는 정사촬영 이미지로 변환시킨다. 이후부터는 PIV의 이미지 처리 방법이 적용되어 표면유속을 산정한다. 다만 이미지 변환을 PIV 이미지 처리 전에 하느냐 후에 하느냐에 따라 유속장 해석결과에 차이가 있다. PIV의 네가지 단계를 포함하여 LSPIV의 각 단계를 구분하면, seeding, illumination, recording, image transformation,image processing 및 post-processing의 여섯 단계로 나뉘어진다 (Li, 2002). LSPIV를 적용시 물표면 입자의 Tracing을 위하여 자연하천에서 사용하기에 적합한 환경친화적인 seeding 재료인 Wood Mulch를 사용하여 유속을 측정하였다. 적용지점은 용담댐 상류의 동향수위관측소 지점으로 이 지점은 한국수자원공사의 수자원시험유역이 위치하고 있다. 이미지의 촬영은 가정용 비디오 캠코더 (Sony DCR-PC 350)을 이용하여 두 줄기의 흐름에 대하여 각각 약 5분 동안의 영상을 촬영한후 이중에서 seeding의 분포가 잘 이루어진 약 1분간을 추출한후 이를 이용하여 PIV 분석에 이용하였다. 대체적으로 유속장의 계산이 무난하게 이루어지었으나 비교적 수질 상태가 양호하고, 수심이 낮고, 하상재료가 자갈로 이루어져 있어 비슷한 색상의 seeding 재료를 추적하기 어려운 구간이 발생한 부분에서는 유속의 계산이 정확히 이루어지지 않았다.
This study proposes an approach to improve the accuracy of land assessment result focused on the Land Suitability Assessment. The detailed analysis processes are; (a) that they are analyzed considering resistance in distance measurement on the space characteristics of location, and; (b) that an assessment result is measured according to the threshold definition of membership function, which is applied in estimating conservation suitability. The assessment results are; firstly, the method considering resistance better reflects the local characteristics of area with worse accessibility including rivers and mountains than one by linear distance; secondly, the existing method that the maximum value of a target area is defined as the maximum threshold may draw a value evaluated lower than a threshold definition considering the distribution of measured indices. Finally, satellite images are overlapped with the assessed results, the applicability level from the approach proposed by this study is more coincident with the present status. The assessment method proposed by this study can be meaningful in view of that it improves the accuracy of Land Suitability Assessment. Furthermore, it can be applied as SDSS, which can support effective establishment of urban policies, in case of complementing the problems in executing the assessment system.
Journal of Korea Spatial Information System Society
/
v.8
no.1
s.16
/
pp.107-118
/
2006
In this paper, several network algorithms were tested to find an optimal one for telecommunication network design. Algorithms such as Dijkstra's shortest path algorithm, Ford-Bellman's shortest path algorithm, Prim's minimum spanning tree algorithm, and Kruscal's minimum spanning tree algorithm were reviewed and compared in terms of feasibility and resulted network construction cost. Then an optimal algorithm that is most suitable for telecommunication network design was selected. For more specific and quantitative analysis of the selected algorithm, it was implemented to a real telecommunication network construction site. The analyzed results showed that the suggested design method when compared with the conventional one, reduced the network construction cost considerably. The total network length estimated by the conventional method were 5267 meters while the suggested method resulted in 4807 meters. Thus the new method reduced the total network length by 8.7 percent which is equivalent to 97,469,000 Won of construction cost. Considering the frequent telecommunication network constructions, due to new urban developments in the nation, the economic benefit of the suggested telecommunication network design method will be significant. In addition to the construction cost savings, the suggested telecommunication network design procedure possesses several other economic benefits. Since the design procedure can be standardized and automatized, it can reduce the design cost itself and the skill acquirement periods required for new or inapt design crews. Further, due to the standardized and automatized design procedure, any telecommunication network design results can accessed more objectively.
Korean Journal of Construction Engineering and Management
/
v.14
no.3
/
pp.115-122
/
2013
Construction Standard Productivity Manual (CSPM) has been used for estimating the contract amount of public construction projects. CSPM has been annually either revised and/or newly enacted with high costs. Therefore, This study makes use of CYCLONE, which is a simulation modeling and analysis system specialized in construction operation, to improve the revising and enacting processes of CSPM. This paper presents the CSPM revision module that is an Add-in to Web-CYCLONE. The new module can be effectively used to incorporate the auxiliary tasks and the non-productive tasks into AL-Form operation model. The outputs obtained from the models using he CSPM revision module and from work sampling were compared to verify the usability of the add-in modules. This study verifies that the new module can effectively assist enacting and/or revising CSPM.
Journal of Korean Tunnelling and Underground Space Association
/
v.25
no.2
/
pp.101-120
/
2023
Electrical resistivity survey have been widely conducted at diverse scales, from a few centimeters for laboratory tests to kilometers for field tests. It measures electrical resistance through relationship of electric potential difference and current between two electrodes penetrated on the surface of medium, and eventually quantifies electrical resistivity known as inherent properties of the medium. In field or full-scale test, it assumes the electrodes as equivalent half-sphere electrodes that have a same surface area with different electrodes for ease of calculation because the contact area between electrode and medium is small and sufficient distance between two electrodes. However, small-scale laboratory test is significantly affected by the electrode geometries (penetrated depth, height, radius of electrode and distance between electrodes), which change the equipotential surface and electric current flow. Indeed, the electrode geometries may eventually cause a difference of electrical resistivity value. This study reviews the theoretical electrical resistance derived with various electrode geometries (half-sphere, cylinder, cylindrical with half-spherical tip, cylindrical with conical tip) and verifies the developed numerical module by comparing results with the theoretical electrical resistance. The distributions of electrical resistance around electrodes and among electrodes are analyzed. In addition, it is discussed how the electrical characteristic of cylindrical electrode with conical tip widely used in field test has effect on the electric current flow.
Numerical simulations by three-dimensional Particle Flow Code($PFC^{3D}$, Itasca) considering distinct element method (DEM) were carried out for prediction of triaxial compression test with sand material. The effect of scale conditions for numerical model and distinct material on final prediction results was analyzed by numerical models under various scale conditions, and following observations were made from the numerical experiments. It is very useful to model the initial material condition without any porosity conversion from 2-D to 3-D DEM. Numerical experiments have shown that in all cases considered, 3D distinct element modeling could provide good agreement on stress-strain behavior, volume change and strength properties with laboratory testing results. It was important thing to assess reasonable scale ratio of numerical model and distinct elements for saving calculation time and securing calculation efficiency under condition with accuracy and appropriateness as numerical laboratory. As results of DEM simulations under various scale conditions, most of results show that shear strength properties as cohesion and internal friction angle are similar in condition of $D_{mod}/D_{gmax}$ < 10. It shows that 3-D distinct element method could be used as efficient tool to assess strength properties by numerical laboratory technique.
The Journal of The Korea Institute of Intelligent Transport Systems
/
v.12
no.3
/
pp.42-52
/
2013
In this study, value of VMS (Variable Message Sign) traffic information is estimated by using CVM (Contingent Valuation Method), which is developed to quantify the value of non-marketable goods in environmental economics. CVM is used to estimate the value of goods provided by a project under consideration and then the project feasibility can be indirectly examined on the basis of the estimated value. This study focuses on estimating to estimate value of traffic information provided through VMS, a part of the transportation system enhancement project by Korea Expressway Corporation which is aimed at mitigating traffic problems on expressways. In particular, this study analyzes value of information separately by trip purpose, information type, and traffic flow condition. A state preference survey was designed to estimate the value of non-marketable traffic information. To maximize reliability of the survey results, a pilot survey was taken before the main survey. The open-ended question method was adopted in capturing users' willingness-to-pay. Both Tobit and binary Probit models were applied in estimating the value of VMS traffic information and their parameters were estimated using the maximum likelihood estimation. The estimation results suggests that the value of traffic information perceived by users is 518.28 KRW.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.