• Title/Summary/Keyword: 공사비절감

Search Result 190, Processing Time 0.024 seconds

Assessment of Project Cost Reduction Potential Adopting Cases-Synthetic Approach - Focused on the Apartment Building Construction Project - (시공방법 개선사례 조합에 의한 원가절감 가능성 평가)

  • Choi, Jong-Soo;Choi, Young-Jun;Chae, Seong-Tae;Yoo, Sung-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.135-144
    • /
    • 2009
  • The primary focus of this study has been directed towards assessing the potential impact of construction method improvement on a reduction in project cost. A total of 90 actual application cases were collected from a public organization and private construction firms, and 32 cases were used in analysis by adopting a synthetic approach. The level of cost reduction was measured in terms of material and labor cost by comparing the existing method and the improved method. An analysis of the results indicates that project cost can be reduced by up to 5.26 percent compared to a normal project by adopting a synthetic approach. Additional benefits include the assurance of uniform quality, savings in terms of labor and/or materials, and improved productivity. The potential of the applicability of this approach to other types of buildings and the implications of research findings were discussed in detail.

An Analysis of Cost Reduction Potentials for Modular Housing from the Long-term Perspective (장기적 관점에서의 모듈러 주택 공사비 절감기회 분석)

  • Kim, Hu Yong;Ryu, Kuk Mu;Kim, Kyoon Tai;Jun, Young Hun;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.124-134
    • /
    • 2018
  • Despite the many advantages of modular housing, low preference for modular housing for consumers who are familiar with RC structure leads to high construction cost of modular housing. The cost of modular buildings is about 130% of that of RC structures, so it is urgent to secure economical efficiency of modular buildings. Therefore, in this study, after calculating the savings amount of modular housing by type of construction work, economic analysis was conducted from a long - term perspective. In order to carry out the research, the authors compiled and analyzed the material cost, labor cost, and expenses incurred by each type of work by reclassifying the statement of the modular housing into the factory production and the site installation. After that, Pareto diagrams were created to find a core work that is included in the cost ratio of about 80%, and selected it as a cost reduction subject. Based on the assumption that the market size of domestic modular housing is similar to the level of modular advanced countries such as Japan and European countries, six cost reduction methods were set up that reflects the characteristics of the modular construction method and used for the expert interviews. Cost saving potentials in percentage from the interview were converted to the amount of savings that can be achieved by each type of method when applying the method. Finally, the findings of the study are expected to suggest long-term directions for technical development for modular construction and cost savings.

A Study on the Problem Analysis and Improvement Plan Development of the Construction Cost Saving Policy in the Public Educational Facilities Projects (공공교육시설 건설공사비 절감방안의 문제점 분석과 개선방향에 관한 연구)

  • Ock Jong-Ho;Han Seung-Hyen
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.98-106
    • /
    • 2001
  • The Ministry of Education and Human Resource Development has implemented the Construction Cost Saving Policy since 1998. The National Universities and Regional Education Committee have been required to follow the details of the Policy in constructing educational facilities in their jurisdiction. While the Policy has positive effect on construction cost saving of the entities, it has been criticized from the beginning of the Policy implementation because of its negative impact on project quality, education quality, trust in the public sector construction business, and solvent operation of the private construction companies which build the educational facilities in the entities. The research aims at investigating the pitfalls of the Policy and suggesting more reasonable approaches that can satisfy both the governmental entities and the private companies.

  • PDF

Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project - (건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 -)

  • Kim, Soo-Min;Cho, Jae-Ho;Lee, Jong-Sik;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.212-215
    • /
    • 2008
  • When managers predict exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But present of public construction cost estimation and management almost after the construction documents design phase. Therefore, construction cost management in the early stage and schematic design phase to generally use approximate estimating is not correct. Accordingly, this study analyze problem of current cost estimating method and a concrete cost plans make using case information of actual cost to analyze in schematic design phase. Possible to check going on the suitable design, this study conducts the preliminary research for the development of cost estimating model.

  • PDF

지하 굴착시 계측관리에 의한 가설부재의 절감

  • 김학수
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 1997.11a
    • /
    • pp.295-300
    • /
    • 1997
  • 건물지하터파기에서 지하굴착시 공사비절감 및 안전관리를 위하여 계측관리를 실시하였다. 본 빌딩은 길이와 폭이 38.6m, 28.5m, 터파기깊이는 17.5m로 원설계에서는 strut5단으로 토류벽을 지지하여 흙을 굴착하는 것으로 설계되어 있으나 토질주상도를 참고로 할 때GL-8.5m부터는 굳은 토사층 및 풍화암층이 나오는 상태이므로 원설계와는 달리 토층이 연약한 부분만 strut로 지지한 후 strut에 strain Gauge를 부착하여 굴착단계마다 strut의 응력을 검정하고 이 응력값이 부재의 허용응력 이내로 계속된다면 Strut단 수를 절감하는 방안으로 일을 추진하였으며 본문에서는 이에 대하여 설명하고자 한다. (중략)

  • PDF

롤러를 이용한 파이프 보온작업

  • 대일공무㈜
    • 월간 기계설비
    • /
    • s.50
    • /
    • pp.22-23
    • /
    • 1994
  • 조금만 생각을 달리해도 그 결과는 매우 달라질 수 있다. 공법개선이란 남다른 것이 아니라 이러한 작은 아이디어가 모아진 것으로서 간편한 시공방법은 물론 인력절감, 공기단축 등으로 인해 공사비 절감을 도모하는 한편 품질향상을 꾀할 수 있어 업계는 신공법 개발에 부심하 노력을 기울이고 있다.

  • PDF

초고층 아파트 최적설비 시스템

  • 김종필
    • Journal of the KSME
    • /
    • v.32 no.3
    • /
    • pp.230-240
    • /
    • 1992
  • 이 글에서는 국내 특성에 적합한 초고층아파트 설비시스템의 설계기법 확립 및 설비시스템의 최적모델을 정립함으로써 초고층 아파트 설비시스템의 효율향상은 물론 공사비절감, 품질향상, 공기단축 등의 효과를 통해 양질의 저렴한 주택의 기술개발에 기여하고 건설업의 대외개방에 대비한 국제경쟁력을 고취시키는데 필요한 초고층아파트 수직통로내의 열유동현상, 배관부식 방지기법 및 설비시스템의 구성요소별 설계방안 등에 대해 소개하고자 한다.

  • PDF

시설공사가격관리자료

  • Korea Institute of Registered Architects
    • Korean Architects
    • /
    • no.6 s.195
    • /
    • pp.83-87
    • /
    • 1985
  • 본 시설공사 가격관리 자료는 '84년도 조달청 시설국이 발주한 공사중 표준가격으로 활용할 수 있는 수준의 건축공사를 발췌하여 이를 비목별,공종별 단위당 공사비와 건물유형별로 중요자재 소요량 및 소요품수 등을 분석한 것입니다. 따라서 회원 여러분께서 본 자료를 잘 활용하면 건물종류별로 우리 실정에 알맞는 표준 건축물의 기준 자료로 이용할 수 있으며 또한 건축물의 과도한 고급화를 억제하여 예산을 절감하는 등 공사비 단가 간접통제 수단이 될 수도 있을 것입니다. 공사집행부서는 본 자료를 시설공사 계획 단계부터 발주, 시공 과정에 이르기까지 관리자료로 활용하시기 바라며 조달청에서는 본 자료를 각 수요기관이 계약요청하는 공사에 대하여 공사비 단가를 비교 평가하는 자료로 활용할 것입니다.

  • PDF