• Title/Summary/Keyword: 공사변경

Search Result 324, Processing Time 0.028 seconds

A Spatial Analysis Based on the Amendments in Seoul's 2030 Youth Housing Policy Using Propositional Logic (명제논리 기반 서울시 역세권 2030청년주택 운영기준의 개정효과 분석)

  • Kim, Seong-Hun;Cho, Hyeon-Jun;Choei, Nae-Young;Han, Dae-Jeong;Bak, Min-Ho
    • Journal of Cadastre & Land InformatiX
    • /
    • v.49 no.1
    • /
    • pp.157-179
    • /
    • 2019
  • The Seoul's 2030 Youth-Housing has been regarded as the only option to procure rental housing sites in downtown Seoul. But its supply did not catch up with the initial expectation, and the criticism that it may disrupt the current zoning system of the city has persisted. Consequently, the 2030 Youth-Housing policy has undergone amendments for six times within the last three years, and the significant changes in its guideline also have been made within the last one year. The study, in this context, tries to figure out the tendencies of those changes made in the guidelines so far by analyzing the aspects of the parcels allowable for Youth-Housing as well as the areas allowable for up-zoning. In the process, the propositional logic is to be adopted to draw the scope of the buildable areas for Youth-Housing. For this, the study refines the raw GIS data, inputs the values for each proposition, and proceeds the logical operation to judge every parcel of the city to discern whether it is eligible for a buildable site and/or for up-zoning for Youth-Housing. It is seen that: 1) the buildable sites rather evenly distribute around the peripheral subway-station areas while more concentrating on the quasi-residential and commercial areas; and 2) the areas eligible for up-zoning have the tendency to concentrate more on quasi-residential areas than others.

Development of Bill of Service Framework for Modular Housing Construction (모듈러 공법의 특성을 적용한 공동주택의 내역 체계 개발)

  • Hwang, Jinsub;Choi, Sanghee;Lee, Jaeseung;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.138-146
    • /
    • 2014
  • Modular construction is one of the arising issues in the Korean construction industry due to shorter construction period and higher productivity on site. It is also expected that modular construction market would expand rapidly because of increasing demand of small houses by nuclear families and eco-friendly construction. However modular construction cases have been limited in Korea because of little demand in the market and the construction prices are even higher that the regular reinforced concrete methods. Even worse, because there is no standard bill of services exists in the industry, it may lead to the risk of construction expenses. So, the purpose of this study is focused on the development of bill of services which reflects characteristics and process of modular construction. In order to do this, the concepts and process of modular construction, WBS and CBS are analyzed. Analyses of the case studies and experts interview were executed so that proper principles for organizing bill of service of modular construction is established. Finally according to the 3 steps of modular construction, factory manufacturing, on-site modular construction and on-site general construction, the standard bill of services were suggested with the related coding system.

An Analysis of the Duration of the Construction Document Phase of Large Public Building Projects Delivered by the Total Solution Service from 2009 to 2014 (공공기관 발주 대형건축공사 실시설계 기간에 대한 분석 및 개선방안 -2009년부터 2014년까지 공공발주 맞춤형 서비스 프로젝트를 중심으로 -)

  • Jung, Wooyoung;Lee, Taewon;Rhee, Pung-wook;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.89-97
    • /
    • 2015
  • This paper analyzes the duration of the construction document (CD) phase of 42 large public building projects delivered by the total solution service of Public Procurement Services in Korea from 2009 to 2014. The quality of construction documents significantly affects the quality of construction and facility management. Thus, securing appropriate time for the CD phase during project planning is important for the quality of a project. Currently, the duration of the CD phase is planned based on the construction costs of a project following a notice of the Ministry of Land, Infrastructure and Transport. However, our analysis results showed that the correlation between the actual duration of the CD phase and construction costs is very weak. The actual CD phase takes 1.33-1.79 times longer than the planned duration. The practitioners who were interviewed, were already aware that the correlation between the duration of the CD phase and the construction costs is weak. They identified the complexity of the project, the extent of the design changes, project type, client characteristics, and others as more influential factors on the CD phase than the construction costs. To improve the quality of CDs, a new guideline for determining an adequate CD phase duration should be studied and developed.

A study on the establishment of domestic criteria through analysis of shield TBM requirements in overseas ITB (Invitation to Bid) (해외 쉴드TBM 입찰안내서 분석을 통한 국내 발주 기준 정립에 관한 연구)

  • Kim, Ki-Hwan;Kim, Hyouk;Mun, Cheol-Hwa;Kim, Young-Hyu;Kim, Dong-Ho;Lee, Jae-Yong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.985-997
    • /
    • 2017
  • In many countries, most of the tunneling works have been ordered by the shield TBM, and also Korean companies are actively bidding and execute in this project. In case of Korea, refurbished machines are mainly using in power cable, gas pipelines, and water and sewage tunnel. Also in metro projects, shield TBM of over diameter 7m is required mainly by using brand new machine. Since the shield TBM is not easy to change once it is produced, it is necessary for the client to provide sufficient information on the production conditions so as to satisfy various characteristics of the construction. In this study, to manufacturing optimal shield TBM, the Client's TBM requirements of tunnel construction in Hong Kong and UK was analyzed and compared with the domestic requirements. The results are expected to provide as client's guidelines for bidding stage and manufacturing for shield TBM tunneling in Korea in the future.

Exploring Delays of The Mega Construction Project: The Case of Korea High Speed Railway (대형 건설사업의 공기지연분석: 경부고속철도 건설사업을 중심으로)

  • Han, Seung Heon;Yun, Sung Min;Lee, Sang Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.839-848
    • /
    • 2006
  • Korea has become the 5th country to own and operate the high speed railroad in 2004. However, there were many difficulties until Koreans enjoy the first bullet train service with the average hourly speed of 300km. The high speed railroad requires elevated quality standards differently from the traditional railways. In addition to the technical difficulties, the construction project itself was an unpleasant case with huge delays and cost overruns mainly due to the lack of experiences, deficiency of owner$^{\circ}{\O}$s role, and increase of public resistances triggered by environmental concerns. This paper analyzes the reasons for delays on this mega-project. With respect to the characteristics of the whole project level, it is very complicated/linear project, whose total length is around 412 km with the composition of various sections in the route of the railway which have basically different conditions. For that reason, the analysis is performed in both macro and micro level. First, macroscopic analysis is performed to find critical subdivisions in the railway route that induces the significant delay in the opening due date. Then, microscopic analysis is followed to quantify the causes and effects of delays focused on these critical subdivisions in more detailed way. Finally, this paper provides lessons learned from this project to avoid the decisive delays in performing the similar large-scaled projects.

철도의 전기$\cdot$신호설비 감시$\cdot$보전 시스템

  • 대한전기협회
    • JOURNAL OF ELECTRICAL WORLD
    • /
    • s.261
    • /
    • pp.70-76
    • /
    • 1998
  • 철도분야에서의 전기$\cdot$신호설비 고장은 열차의 정상운행에 차질을 일으켜 사회적으로 커다란 영향을 끼치게 되므로 설비의 유지관리를 위해서는 많은 노력이 필요하다. 또 이러한 보전작업에는 철도 설비가 널리 산재되어 있기 때문에 이동을 수반하는 작업, 열차가 통과하지 않는 야간 작업, 만일의 경우 위험을 수반하는 작업 등, 이 분야 특유의 작업이 있다. 한편 보전작업에 종사하는 기술자는 해마다 줄어들고 있으며 앞으로 젊은 근로자의 부족은 더욱더 심해질 것으로 보인다. 그러한 이유로 설비보전의 자력화, 미연의 고장방지, 고장의 조기복구와 재발방지를 목표로 지금까지 사람의 손에 의지해 오던 설비보전을 기계화하고 자동화하는 시스템을 개발하게 되었다. 이 시스템은 대상설비에 따라 다음의 3가지 시스템으로 분류된다. $\cdot$신호설비 보전시스템 $\cdot$변전$\cdot$수배전설비 보전시스템$\cdot$연선전기설비 보전시스템 이들시스템에 공통적인 주요 특징을 들면 아래와 같다. (1)사고를 미연에 방지하고 사고원인을 규명 이벤트발생 전후의 변화나 중장기트렌드를 원격감시할 수 있다. (2)시스템의 변경$\cdot$증설이 용이 인텔리전트단말에 의하여 처리를 계층화하였기 때문에 빌딩블록식으로 시스템을 확장할 수 있다. (3)경제적인 시스템 필드 네트워크의 채용으로 공사비를 삭감할 수 있다.

  • PDF

Fire Resistance Property of RC Structure Member Strengthened with Fiber Sheet (섬유시트로 보강된 철근 콘크리트 구조부재의 방ㆍ내화성능)

  • 이한승
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.2
    • /
    • pp.45-50
    • /
    • 2002
  • 근년, 철근 콘크리트조 구조부재의 열화 및 건축물의 용도변경에 따라 건축물의 보수 및 보강에 관한 공법의 개발 및 그 효과를 검증하려는 연구가 활발히 진행되고 있다. 이에 따라, 보강공법으로서는 경제성ㆍ시공성 면에서 우수한 탄소섬유시트, 아라미드섬유 시트, 유리섬유시트 보강공법 및 FRP판 보강공법 등 합성수지 접착제를 사용하는 새로운 보강공법들이 폭넓게 연구되어 현장 실용화되어 사용 중에 있다. 그러나, 이들 보강공법에 관한 연구는 주로 구조적인 내력 보강효과 산정에 관한 것이 대부분이고 보강후의 내화성능 및 내구성능에 관한 연구는 매우 부족한 실정이다. 이들 보강공법은 주로 에폭시수지계 접착제에 의하여 콘크리트와 보강재의 접착력에 의하여 내력이 전달되는 메커니즘으로 되어있어 화재가 발생한 경우 내화피복이 없다면 접착제 자체의 연소에 의하여 유독가스의 발생 및 접착강도가 크게 저하되어 그 구조적인 보강성능은 급속히 저하할 것으로 판단된다. 또한, 현재 이들 보강공사는 내화성능의 검토 없이 실제 시공이 이루어지고 있으므로 화재시에는 대형참사를 일으킬 위험성이 있다.(중략)

Design of Building Energy Management System (BEMS) for optimized operation (대형 빌딩 전력 운영 최적화를 위한 빌딩 전력 관리 시스템 설계)

  • Yang, Mi-Nuk;Kim, Kern-Joong;Kwon, Hyng-Suk
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.334-335
    • /
    • 2011
  • 국내에는 다양한 스마트 전력기기들이 충분히 개발되어 있는 상황으로 빌딩의 전력 관리 시스템(이하 BEMS)를 구축하고 효율적으로 사용하기 위한 인프라가 충분히 갖추어 있다. 하지만 기존 건물 내배선의 유연성 부족으로, 효율적인 운영을 위해서는 상태 정보를 취득하고 이를 바탕으로 전기 설비 구조 변경 공사를 통할 수밖에 없는 상황이다. 그리고 빌딩의 대형화에 따라 전력 사용량이 커짐으로, 운영을 통한 효율성 관리 여지가 커지고 있다. 따라서 본 문에서는 빌딩 내 전력 배분의 유연성을 가질 수 있는 전력 설비를 투자하고 이를 운영하기 위해 취득 데이터를 바탕으로 3상 급전 해석 코어를 설계하고 BEMS에 추가적으로 운영을 지원하는 시스템을 설계한다.

  • PDF

A Case Study of the Improvement of the Acoustics of a Traditional Music Hall according to the Acoustical Guideline of the Traditional Music (국악공연장 음향설계기준에 따른 음향개선 사례연구)

  • Shin Jic-Su;Lee Wangu;Haan Chan-Hoon
    • Proceedings of the Acoustical Society of Korea Conference
    • /
    • spring
    • /
    • pp.245-250
    • /
    • 2004
  • 본 연구는 국립국악원 우면당의 개보수공사에 있어서 새로이 변경되는 객석의 형태와 규모 및 목적에 맞는 최적의 실내음향설계를 제시하기 위하여 현재의 우면당 실내음향의 문제점을 파?하고 설계된 도면을 기초로 하여 과학적으로 분석, 평가함으로서 국악공연에 적합한 최적의 음향성능을 창출하고 이에 따른 실내마감 자재 및 설계, 시공방법 등을 제시하였다. 또한 시공후 음향성능에 대한 평가작업을 시행하여 시공전과 비교함으로서 그 개선의 결과를 검증하였다.

  • PDF

이슈 & 이슈 - 원하는 만큼 고쳐쓰는 '아파트 리모델링'

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.277
    • /
    • pp.48-55
    • /
    • 2013
  • 국토교통부(장관 서승환)는 수직증축 리모델링 허용 등을 포함한 '공동주택 리모델링 제도개선 방안'(6.5 발표)의 후속조치로 노후 공동주택 거주 주민이 부담 가능한 범위에서 불편사례를 선택적으로 개선할 수 있도록 '맞춤형 리모델링' 활성화를 위한 연구용역을 마무리하고, 조만간 가이드라인을 제작 발표할 계획이라고 밝혔다. 가이드라인에는 주차장 부족, 배관 노후화 등 노후 공동주택 거주 주민들의 주요 불편사항(급 배수관 노후화, 주차장 부족, 난방효율 저하, 승강기 부족 등)을 효과적으로 해소할 수 있도록 단지 동 세대 내에서 각각 시행할 수 있는 총 39가지의 리모델링 아이템에 대한 소개와 공사비 등의 정보가 포함될 예정이다. 먼저, 단지내 리모델링에는 데크 지하주차장 신설, 녹지 보육시설 및 헬스장 등 확충, 노후상가 철거 후 별동 증축 등이 포함되며, 아파트 개별 동 내에서는 급 배수관/전기 통신/소방 등 노후 설비 교체, 승강기 신설, 코어증축(복도${\rightarrow}$계단식 변경) 등이, 세대 내에는 문 창호 및 내장재 교체, 단열 기밀 등 에너지 성능 향상, 실내공간 재배치 등이 포함된다. 특히, 아이템별 이주기간을 재실형과 이주형으로 구분하여 주민 선택의 폭을 한층 더 넓힐 것으로 기대된다.

  • PDF