동굴 내의 전기조명시설 요령

  • 변태근
    • Proceedings of the Speleological Society Conference
    • /
    • 1996.09a
    • /
    • pp.84-84
    • /
    • 1996
  • 동굴의 전기 시설은 전문가에 의하여 작성된 동굴 도면과 지형지물의 철저한 조사에 의한 전기 시설의 설계가 이루어진 후에 전기공사업 자격자에 의하여 시공되고, 설계자 또는 감리기관에 의하여 시공의 감독이 이루어져야 한다. 다음으로 시설 후의 관리, 유지, 보수가 더욱 중요한 것으로 조명등의 전구 교체라든가 등기구 교체시 설계 도면에 의거하여 설계자의 의도를 벗어나서는 안될 것이며, 기본 도면에 의한 보수공사 또는 재설계가 이루어진 후에 설계에 의한 보수공사가 시행되는 것이 일반적인 상식임이다.(중략)

  • PDF

Crafting a Quality Performance Evaluation Model Leveraging Unstructured Data (비정형데이터를 활용한 건축현장 품질성과 평가 모델 개발)

  • Lee, Kiseok;Song, Taegeun;Yoo, Wi Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.157-168
    • /
    • 2024
  • The frequent occurrence of structural failures at building construction sites in Korea has underscored the critical role of rigorous oversight in the inspection and management of construction projects. As mandated by prevailing regulations and standards, onsite supervision by designated supervisors encompasses thorough documentation of construction quality, material standards, and the history of any reconstructions, among other factors. These reports, predominantly consisting of unstructured data, constitute approximately 80% of the data amassed at construction sites and serve as a comprehensive repository of quality-related information. This research introduces the SL-QPA model, which employs text mining techniques to preprocess supervision reports and establish a sentiment dictionary, thereby enabling the quantification of quality performance. The study's findings, demonstrating a statistically significant Pearson correlation between the quality performance scores derived from the SL-QPA model and various legally defined indicators, were substantiated through a one-way analysis of variance of the correlation coefficients. The SL-QPA model, as developed in this study, offers a supplementary approach to evaluating the quality performance of building construction projects. It holds the promise of enhancing quality inspection and management practices by harnessing the wealth of unstructured data generated throughout the lifecycle of construction projects.

Analysis of Ambivalence Differences among Groups for Temporary Firefighting Facilities of Workers at Construction Sites (공사현장 근로자의 임시소방시설에 대한 집단 간 Ambivalence 차이분석)

  • Moon, Pil-Jae;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.765-778
    • /
    • 2021
  • The purpose of this study is to prevent fire accidents in advance by deriving prior knowledge among groups about temporary fire-fighting facilities of workers at construction sites and devising appropriate improvement measures. The findings are as follows.First, in the case of fire extinguishers, statistical attention was paid to the contractor, supervisor, partner worker and fire extinguisher manager between designations. 87% of fire managers and 70% of facility supervisors said fire extinguisher management managers needed to be designated for each type of construction, which requires designation of fire extinguisher management managers, frequently checking and relocating. Second, in the case of simple fire extinguishing facilities, statistical attention was paid to the application of penalties for unauthorized use of fire extinguishing facilities with construction companies, supervisors, and business partners.Third, in the case of emergency alarm measures, statistical attention was paid to the application of emergency alarm sound to temporary broadcasting facilities with construction works, supervisors, and business partners.Fourth, in the case of induction, statistical attention was paid to the application of connection between construction works, supervisors, and partner workers, such as passage guidance, emergency lighting, etc.It was found that 65% of construction workers and 55% of electrical workers had different applications such as aisle guidance and emergency lighting for each type of business partner. In order to resolve blind spots such as evacuation zone guidance due to the structure of the building, it is necessary to easily distinguish the direction of the entrance door from a long distance by applying it in conjunction with passage guidance lights and emergency lighting.

The Voluntary Assurance of Quality by Contractors in the Construction Phase (건설 공사단계에서 수급자 중심의 품질확보방안)

  • Cha, Sang-Ho;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.292-300
    • /
    • 2011
  • The construction industry in Korea has seen significant improvements in quality management techniques, driven by the dramatic development of new technology through Manhattanization and enlargements, but compared with technical development, the level of building quality improvement is still lagging behind. In the meantime, as the interest in construction quality soars due to changes in user consciousness, the level of quality that is being demanded is rising. The government has reinforced quality systems by implementing responsible supervision requirements and granting overseas companies permission to enter the supervision business in Korea, and private sector companies also are attempting quality improvement through quality assurance approaches like the preliminary qualification screening system and ISO 9000 series. But currently, building constructions are done only according to the construction specifications of project owners, whose design, materials and construction methods are already decided, and do not leave any necessity or opportunity for technical developments for the quality improvement of contractors. Therefore, in this study, a work process and system improvement plan for payment regulations is proposed, with which contractors can secure quality voluntarily in the building construction phase.

해외건설공사 수행절차(5)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.10 s.219
    • /
    • pp.48-50
    • /
    • 2008
  • 해외건설공사를 성공적으로 수행하기위해서는, 낙찰통보전 낙찰가능시점부터, 현장소장을 비롯한 현장준비팀을 조직 운영하여, 계약서류상의 각종 요구사항, 승인사항, 인 허가사항, 현지법,공법,계약조건, 공정계획, 인원소요계획, 장비소요계획 등을 검토 한다. 또 현장답사 등을 통하여 견적시에 계획되고 작성된 모든 내용을 검토 보완, 수정 및 Update함과 동시에,선발대를 현장에 투입해 발주자로부터 현장을 인수하고 가설공사를 시작하며 조기착공에 서두른다. 단, 현장투입 전 발주자로부터 접수한 Letter of Intent(낙찰/계약의향서)상의 착공관련 조건을 확인하거나 Notice to Proceed(착공지시서)의 접수를 확인해야 한다. 시공자의 입장에서 건설공사의 궁극적인 목표를 이익의 극대화로 볼 때, 공사초기에서의 신속한 동원이야말로 목표달성에 이르는 지름길이며, 발주자 및 감리자로부터 신뢰를 받아 공사 전반에 걸쳐 순조로운 현장운영을 가능케 하는 것이다.

  • PDF

A Case Study on the Demolition of Power Plant with Blasting Method for the First Time in Korea (국내 최초 발파공법 적용 발전소 해체 사례)

  • Oh, Ki-Taek
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.87-88
    • /
    • 2023
  • 서해안 최고의 동백정해수욕장과 마량리 동백나무숲은 1970년대 오일쇼크 이후 에너지 자립을 위해 발전소를 건설하면서 사라졌다. 그 당시 준공된 화력발전소는 전력공급 이라는 소임을 완수하고 2021년 부터 동백정의 아름다운 옛 모습 그대로 지역주민에게 돌려 주기위한 친환경 사업으로 발전소 철거공사를 시작, 동백정 복원공사를 추진 하기로 했다. 고층 및 중량물의 건축물 및 구조물을 안전하게 해체하기 위해서는 국내 최초 발전소 철골구조물에 대한 발파·전도공법을 채택 하였다. 철거작업은 고위험 공종으로 참여 주체인 발주자, 설계자, 감리자, 시공자 및 근로자 전 계층의 참여로 사전 위험성평가를 통해 근원의 위험요인 발굴 및 안전대책 수립, 수립된 안전대책 100% 이행을 통해 무재해 준공 달성 하기를 기대한다.

  • PDF

건축법중 개정법률(안)

  • Korea Institute of Registered Architects
    • Korean Architects
    • /
    • no.8 s.79
    • /
    • pp.54-63
    • /
    • 1975
  • 정부에서(건설부)제안한 건축법 중 개정 법률안이 지난번 임시국회 때, 국회건설위원회에서 일부수정 채택하고, 국회법사위에 회부했는데 오는 정기 국회에서 통과될 것이 거의 확실시 되는 바, 동 건설법 개정안에서 제53조(면적, 높이 및 층수의 산정 등)의 2항 신설로 협회 총회에서까지 수차 논란되었던 정화조 설계는 오물 청소법 제14조의 규정을 적용 받지 않도록 규정함으로서 부당한 규제가 없어지게 된 점과 제6조(건축물의 설계 및 감리 등)에 제7항을 신설하여 공사감리자에게 불이익을 줄 수 없도록 규정한 것과, 대체적으로 회원업무에 불리한 방향으로 개정되지 않은 것을 다행으로 여기며, 본 협회에서는 건설위원회에서 채택한 동 건축법 개정 법률안과 본 협회에서 정부에 건의한 동법 개정안의 내용을 동시에 게재하여 봅니다.

  • PDF

A study on the status and improvement of construction management in Gwangjin-Gu Culture & Sports Center (광진구민회관의 건설사업관리 적용현황과 개선방향에 관한 연구)

  • Jung Jae-Jin;Yoo Byeong-Gi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.32-39
    • /
    • 2003
  • Owners, local autonumous entities, have a burden on operating project for the lack of their management capacity such as specialty and human resources. In this reason, they want to perform project with CM methods. But there have been only a few case of CM operation and application in a huge construction project. The complex formations of CM and responsible management are used in those project. This situation originates in the lack of CM specialist. Because the CM service used in those case is generally performed as the mixture of responsible management service and design management service, it is not the prototype of CM. The purposes of this study are to present the solutions to the problems concerned with the design development phase management, design phase VE, the application of Fast-Track, PMIS operation and CM execution, etc, and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Gwangjin-Gu Culture & Sports Center.

  • PDF

A Study on the improvement of current construction safety management system (건설공사 안전관리 개선방안에 관한 연구)

  • Jung, Jae-Woo;Kim, Tae-Yang;Kim, Hang-Su;Cho, Young-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.691-694
    • /
    • 2007
  • Today, current society is unceasingly changing. This phenomenon accelerate building to high-rise and complex. According to that, to build a construction structure, the safety management facilities, safety education & training for employee and consciousness for safety should be set aside. But, the occurrence of safety injury is not decreasing now. Therefore, to reduce safety injury and to enhance the consciousness of employee for safety, redesign of safety management system, reallocation of safety liability for privity, revise of safety educational system were suggested in this paper.

  • PDF