• Title/Summary/Keyword: 공병

Search Result 279, Processing Time 0.024 seconds

Mathematical model and heuristic for the assignment of military engineering equipments in ROK army (공병 장비의 최적할당을 위한 수리모형 및 휴리스틱 알고리즘)

  • Park, Jongbok;Ahn, Namsu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.4
    • /
    • pp.138-144
    • /
    • 2020
  • The Army's engineers are carrying out a range of operations using various equipment, of which, artillery unit support is the representative engineering operation field. The main task of the artillery unit is to attack the enemy's center with firepower from the rear of a friendly force. The artillery must move its original position after firing several times to prevent exposure of the shooting position. This paper proposed a mathematical model and heuristic algorithm that can be used to determine the optimal allocation among engineer equipment, the team (work), and position while reflecting the constraints of the construction of an artillery position. The model proposed in this paper derived the optimal solution for the small size problems, but it takes a long time to derive the optimal solution for the problem of equipment placement of the engineer battalion and brigade scale. Although the heuristic suggested in this study does not guarantee the optimal solution, the solution could be obtained in a reasonable amount of time.

A Study on Analysis and Improvement of Current Korean Army's Mine Detector (한국 군 운용 지뢰 탐지기 현실태 분석 및 개선 방안 연구)

  • Kim, Chi-Wook
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.13 no.5
    • /
    • pp.229-233
    • /
    • 2013
  • Mine detector of troops is different from other equipments. It is a base of a miner branch's combat, combat support and mission. But its notion is too obsucure and each troops' model and maker of it is so different and most of it is old type so there are a lot of malfunctions. Hence, I will define management of mine detector and figure out these days miner troops' mine detector situation. I will collect experts' opinions too. Through a discussion we could found improvement plan and develop it adequate for future operational environment. Proceeding all these courses and finally making it weaponize are the points of this writing.