• Title/Summary/Keyword: 공법 선정

Search Result 415, Processing Time 0.02 seconds

A Study on the Selection System of Waterproof Method by Using Database (데이터베이스화에 의한 지수공법 선정시스템에 관한 연구)

  • 천병식;최춘식;하광현
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.6
    • /
    • pp.43-59
    • /
    • 2002
  • In this study, database systems which were used to select the waterproof method according to leakage patterns of underground structures were built by performing pilot tests, reviewing literatures, and analysing the gathered data statistically. The database was built by using check lists which consisted of 5 major items and 73 subdivided items, and 26 major parameters according to 4 classified grades were determined on the base of survey which considered various in-situ conditions. The database of waterproof methods was comprised of 10 methods which were applied in Korea. From the database of waterproof methods, application ranges and design conditions of waterproof methods were suggested. From the results of study, database system consists of parameters selection database, waterproof method database, and design condition database. From the results of pilot tests, when the database of waterproof methods was applied to design stage, saving time and reducing mistakes for selecting waterproof method were gained. In addition, when the database of waterproof methods was applied to construction stage, effects such as evaluation of applicability of waterproof method, improvement of constructability and post management were expected.

A Study on the Construction Method selecting scheme using Fuzzy Relative Preference Ratio method (퍼지 R.P.R(Relative Preference Ratio)기법을 이용한 건설프로젝트의 공법선정에 관한 연구)

  • Lee Dong-Un;Kim Kyung-Whal
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.143-150
    • /
    • 2004
  • Nowaday, The tendency of complexity and extension of construction fields increase the need for efficient works managements like a construction management. Consequently, by the introduction of Decision-Making Theories, researches for improving construction field's efficiencies are actively performed. Fuzzy Analytical Hierarchy Process method is invented, so that describes a decision maker's ambiguous linguistic judgment with fuzzy numbers. but most of researches on Fuzzy-AHP use symmetric triangular fuzzy function for estimating each evaluation item with the consequence that exact judgments are impossible. those limits are caused by the point that employed fuzzy ranking methods can not support dissymmetric fuzzy numbers. In this research, we aims to overcome this problem with R.P.R(Relative Preference Ratio) method and suggest improved Fuzzy-AHP method which can use dissymmetric fuzzy triangular numbers.

A Neural Network Model for Selecting a Piling Method of Building Construction (건축공사 말뚝공법 선정을 위한 신경망 모델 개발)

  • Cheon Bong-Ho;Koo Choong-Wan;Um Ik-Joon;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.317-322
    • /
    • 2004
  • As a construction project in urban area tends to be high-rise and huge, the importance of the project's underground work, in terms of the cost and the schedule, is gradually increasing. It's extremely significant to choose a proper filing method, at the stage of underground work. However, in piling work many change orders have been occurred since a piling method is experientially selected based on uncertain information and many earth factors to consider. It has effects on the cost and the schedule of the project. In this study, we have suggested a decision model for piling method that can be used to determine and verify the suitable piling method in design and pre-construction phase of a project. Based on historical data, a neural network model has already proven to be efficient. The tests of the model for selecting a suitable piling method have progressed exactly with the data of 150 piling works which were done room 2000 to 2004 in Korea. The optimization or the developed neural network model has progressed with the data for teaming. The validity of the neural network model has been verified.

  • PDF

Decision Making Model using Multiple Matrix Analysis for Optimum Construction Method Selection (다중 매트릭스 분석 기법을 이용한 최적 건축공법 선정 의사결정지원 모델)

  • Lee, Jong-Sik;Lim, Myung-Kwan
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.4
    • /
    • pp.331-339
    • /
    • 2016
  • According to high-rise, complexation, and enlargement of buildings, various construction methods are being developed, and the significance of construction method selection about main work types has emerged as a major interest. However, it has been pointed out that hand-on workers cannot consider project characteristics carefully, and they lack an objective standard or reference for main construction method selection. Hence, the selection is being made depending on hand-on workers' experience and intuition. To solve this problem, various studies have proceeded for construction method selection of main work types using Artificial Intelligence like Fuzzy, AHP and Case-based reasoning. It is difficult to apply many different kinds of construction method selection to every main work type with consideration for characteristics of work types and condition of a construction site when selecting construction method in the field. Accordingly, this study proposed the decision-making model which can apply to fields easily. Using matrix analysis and liner transformation, this study verified consistency of study models applied in the process of soil retaining selection with a case study.

An Analytic Hierarchy Process based Decision Support System for Selecting Foundation Practice (계층분석법 기반의 기초공법 선정 의사결정지원시스템)

  • Lee, Chung-Hyun;Jeong, Keun-Chae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.129-139
    • /
    • 2012
  • It is one of the most important decision making problems to select the adequate foundation practice for the downtown construction project. However the foundation practice has not been selected systematically yet by considering various construction field conditions in many projects. The foundation practice is often informally selected on the basis of only past experiences and skilled engineer's opinion. For making the selection process systematically, in this study, we propose a decision support system (DSS) for selecting foundation practices based on the Analytic Hierarchy Process (AHP) and the Preference Function (PF). In the proposed DSS, the AHP is used for making the selection process more reasonable and the PF is used for considering the decision maker's preference. To validate the proposed DSS, we apply the proposed DSS to the pre-performed construction projects. The application results show that the proposed DSS gives the same foundation practices with the implemented foundation practices that the skilled foundation engineers select after carefully analyzing construction field conditions. The proposed DSS can be used as a useful tool for making decisions to select the foundation practice in the construction fields.

Electric Power_Power Interview - (주)대우건설 'DBS 공법' 2009 대한민국 10대 신기술 선정

  • 대한전기협회
    • JOURNAL OF ELECTRICAL WORLD
    • /
    • s.397
    • /
    • pp.52-53
    • /
    • 2010
  • 지식경제부는 12월 15일 서울그랜드인터콘호텔 그랜드볼룸에서 올해 국내에서 개발된 세계최초 세계 최고 수준의 신기술 제품중에서 경제적으로 파급효과가 큰 대한민국 10대 신기술을 선정 발표했다. 10대 신기술 및 기술대상 선정은 전기 전자, 기계 항공, 재료 화학, 생명과학 환경자원 등 분야별 전문가로 구성된 기술대상 심의위원회에서 기술검토와 현장조사를 바탕으로, 기술의 우수성 국내산업에 미치는 파급효과 등을 기준으로 중소 대기업 등을 안배하여 선정하였다. 환경자원 분야에서 영예의 신기술로 선정된 '대우 통합 고효율 바이오가스 생산 및 활용 공법 : DBS 공법'<(주)대우건설>의 주역인 박현수 선임연구원의 인터뷰를 게재합니다.

  • PDF

A Case Study of Selecting Rock Excavation Method Considering the Geological Conditions in Daejon Area (대전지역의 토목지질학적 조건을 고려한 암파쇄공법 선정에 관한 사례연구)

  • 윤성현;이광열;안명석;류창하
    • Explosives and Blasting
    • /
    • v.19 no.4
    • /
    • pp.11-22
    • /
    • 2001
  • 토목공사장에서 암파쇄 작업은 경제성과 안정성에 지대한 영향을 미치는 작업이다. 본 논문은 대전지역에서 수행된 암파쇄 공법 설계 및 시공사례로서, 현장암반의 특성을 고려한 적정발파공법을 선정하기 위하여 대상 지역의 지질현황을 조사·분석하고, 또한 민원이 첨예한 도로개설 공사장에서 시험발파를 실시하여 이를 토대로 암절취 공법을 선정하여 시공한 사례보고이다. 대전지역의 지질은 선캠브리아기의 변성암류와 변성퇴적암류 및 이를 관입한 심성암류와 중생대 화강암으로 이루어져 있는 복잡한 분포를 이루고 있다. 사례연구 대상 현장은 편상구조가 현저한 관입 편상화강암 및 화강암질 편마암으로 구성되어 있었으며, 시험발파 및 분석결과를 기초로하여 25.5m이내 지역은 HRS 등 무진동 파쇄공법의 적용을 제안하였고, 25.5∼36m 범위의 대부분 지역은 진동제어를 할 수 있는 제어발파공법을 권장하였고, 기타 진동 영향권에서 비교적 안전한 것으로 나타난 지역은 소발파공법을 적용하도록 제안하였다. 제안된 안에 따라 설계를 보완하고 시공한 결과 문제의 발생없이 성공적으로 시공이 완료되었다.

  • PDF

A Case study on the Application of Vibration Controlled Blasting Method (진동제어발파공법 적용 사례에 관한 연구)

  • 손영복;김재훈;원연호
    • Explosives and Blasting
    • /
    • v.21 no.3
    • /
    • pp.61-71
    • /
    • 2003
  • 최근 도심지 굴착공법 선정시 주변환경에 대한 관심이 높아지면서 민원발생을 감안하여, 발파공법이 아닌 기계굴착공법(TBM, SHIELD 등) 등이 부분적으로 적용되고 있다. 그러나 이들 굴착공법들은 굴착조건의 변화에 따라 적용 한계성이 있고, 한계구간이 직면할시 시공성이 극히 떨어지거나 적용 자체가 불가능하게 된다. 이에 따라, 공사기간의 연장, 공사비의 증가 및 적용자체가 불가 할 경우는 공사중단에 이르게 되어 시공과정에서 다른 굴착공법으로 전환되는 사례가 빈번히 발생되고 있다. 따라서 본 사례는 도심지 터널구간으로 당초 할암공법으로 설계되었으나 암반의 강도가 높고 굴착단면적이 협소하여 할암공법이 적용될 수 없었다. 이에 대한 대안공법으로 TBM이나 기타 장비에 의한 기계굴착공법을 검토하였으나, 터널연장이 짧고 터널노선의 곡선부 반경이 작아 대형장비의 투입이 어려운 굴착조건 때문에 최종적으로 폭약을 이용한 발파굴착 공법을 선정하였다. 그러나 발파공법은 진동 및 소음이 필연적으로 수반되기 때문에, 주변 환경공해가 허용하는 범위 내에서 최대한의 시공성과 안전성 여부를 판단하기 위하여 발파진동 및 소음의 허용수준을 설정한 후 시험발파를 실시하였으며, 그 결과에 따라 진동제어발파공법을 적용하였다.

A Study on the Optimum Method Selection Using Matrix Analysis (매트릭스 분석(Matrix Analysis)을 활용한 최적 공법 선정에 관한 연구)

  • Park, Hyun-Jung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.4
    • /
    • pp.913-919
    • /
    • 2014
  • This study regards to a method how to select the optimized earth retaining technology among four target technologies which are applied to underground construction work by analyzing relative weight values of major influence factors. In this study, major affected zone and influence factors are analyzed through questionnaire survey to select a suitable earth retaining technology for downtown area, and an optimized earth retaining technology is proposed by using the matrix analysis based on them. Also, by systematically analyzing the weight values and methods of alternatives selection through consideration the importance of alternatives evaluation criteria, the importance of affected zones is evaluated to determine the optimized alternative. It is concluded that when performing the analysis to select the earth retaining technology which should consider a variety of constraints, the convergence with information processing technology in the field of IT is effective to analyze and optimize many constraints.

QFD-Based Integrated Model of Dismantling Method Selection and FMEA Risk Assessment for Work Stage (QFD 기반의 해체공사 공법선정과 FMEA 위험성평가 통합 모델)

  • Lee, Hyung-Yong;Cho, Jae-Ho;Son, Bo-Sik;Chae, Myung-Jin;Kim, Hyun-Soo;Chun, Jae-Youl
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.6
    • /
    • pp.629-640
    • /
    • 2021
  • According to statistics from the Ministry of Land, Infrastructure and Transport in 2018, approximately 37% of residential buildings in Korea need to be reconstructed. Due to the rapid growth of the demolition industry, many side effects such as environmental destruction and safety accidents are becoming a problem in the demolition of existing buildings. This study proposes a decision-making process for selecting the most suitable dismantling method for field application by comprehensively considering safety, economic feasibility, and environmental characteristics. In particular, field applicability is evaluated by evaluating risk factors for the selected method. To this end, this study proposes the TOPSIS method for the selection of the dismantling method using the QFD development concept, and the FMEA method as a continuous development process of the selected method.