• Title/Summary/Keyword: 공급자 계약서

Search Result 15, Processing Time 0.026 seconds

Comparison of Success Rates of Supply Chain Contract using Simulation (시뮬레이션을 이용한 공급사슬 계약 성사율 비교)

  • Gao, Yang;Seo, Dong-Won
    • Journal of the Korea Society for Simulation
    • /
    • v.31 no.1
    • /
    • pp.19-27
    • /
    • 2022
  • This study compares and analyzes wholesale(or price-only) contract, revenue-sharing contract, quantity-flexibility contract, and channel-rebate contract in a decentralized supply chain consisting of one supplier and one retailer. By setting the parameters of each coordination contract based on the previous results, we conduct simulations using @RISK for several combinations of these parameters. Under the supply chain coordination, we evaluate the probability of successfully signing a contract and the participant in favor of each contract. As a result, the quantity-flexibility contracts is most advantageous for the retailer and the channel-rebate contracts is most advantageous for the supplier. It revealed that revenue-sharing contracts can be used more flexibly because they can be selected in the widest range to redistribute profits between supplier and retailer.

Supplier Management Research for Disaster Mitigation Activities and Prevention of Major Disasters (재해경감활동과 중대재해예방을 위한 공급자 관리 연구)

  • Kim, Sang-Duk
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.71-72
    • /
    • 2022
  • 본 연구는 발주기관과 사내 공급자의 재해경감활동관리체계 연계성 강화에 대하여 연구하고자 한다. 기업재난관리표준에 정하고 있는 공급자 전략에 대한 요구사항을 파악하고, 발주기관과 공급자의 적용사례를 검토 분석하여 재해경감활동관리체계의 연계성 강화를 위한 절차를 도출한다. 기업재난관리표준의 요구사항인 공급자 전략에 대하여 명확히 정의하고, 연계성 강화를 위해서 발주기관과 공급자가 적용하는 절차와 그 절차에 의하여 산출된 결과물을 공유하는 표준화된 절차가 필요하다는 시사점에 대한 해결방안을 연구하였다. 공급자의 재해경감활동관리체계 수립 절차중 중요한 절차의 연계성 강화를 위한 개선안을 제안하였으며, 제안된 내용과 절차를 기업재난관리표준과 관련 규범에 반영할 것을 제시한다

  • PDF

Supply Contract Intelligence : The Impact of Stockout and Overstock Experiences Using System Dynamics Simulation Model (공급사슬지능 : 시스템 다이나믹스를 이용한 재고 과부족 경험이 공급사슬에 미치는 영향 분석)

  • Noh, Yonghwi;Choi, Donghyun;Rha, Jin Sung;Suh, Yongkee
    • Journal of Intelligence and Information Systems
    • /
    • v.19 no.2
    • /
    • pp.21-38
    • /
    • 2013
  • The purpose of this study is to investigate the influence of behavioral factors (buyer's tendency to reflect stockout and overstock experiences in ordering decision) on the supply chain performance. This study employs system dynamics to examine the influence of these behavioral factors derived from the interview with several representatives of retailers in South Korea. The results show that different contract can bring different performance (total profit, seller's profit, buyer's profit, order quantity, sales quantity, overstock, and stockout). The results also suggest that these behavioral factors play a significantly influential role in the performance of supply contract. These results imply that supply contract should be established based on the analysis of behavioral factors of supply chain participants.

A Study on the Practical Suggestions in the Contract for the Turnkey Supply of an Industrial Plant - Focused on the Commentary of ICC Model Contract - (턴키방식 플랜트계약의 실무상 유의점에 관한 연구 - ICC 표본 계약서의 해설을 중심으로 -)

  • Oh, Won-Suk;Lee, Ki-Ok
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.53
    • /
    • pp.3-29
    • /
    • 2012
  • This article examines the Practical Suggestions in the Contract for the Turnkey Supply of an Industrial Plant based on a study focused on the commentary of "ICC Model Contract" clause which is encouraged by ICC. Especially practical issues are inquired into on business and legal perspective as follows. First, in regard to supply of technical documentation, equipment and spare parts, it is important to supplier and purchaser to agree on obtaining technical documents necessary for installing and operating plant, and also components necessary for it's maintenance. Second, it is about erection, testing, taking over and training chapter. Both parties need to agree about the process of the arrival of equipments and assembly conducted by the supplier and following examination and also training purchaser to operate it Third, when it comes to price, payment conditions, bank guarantees, parties are to make decision on the pricing, payment conditions and currency of contract-payment. Lastly, it is necessary to reach an agreement of the issue of whether it is to be defined as delay or non-performance of the contract and also it's consequences about rights and obligation.

  • PDF

Research on Improving the Method of Establishing a Disaster Reduction Activity Management System linked with In-house Suppliers (사내 공급자와 연계된 재해경감활동관리체계 구축방법 개선 연구)

  • Kim, Sang Duk;Kim, Chang Soo
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.2
    • /
    • pp.365-374
    • /
    • 2021
  • Purpose: This study aims to study the reinforcement of the connection between the ordering agency and the in-house supplier's disaster reduction activity management system. Method: The requirements for the supplier strategy specified in the enterprise disaster management standard were identified, the application cases of agency A and supplier B were reviewed, and procedures for reinforcing the linkage of the disaster reduction activity management system were derived. Result: In order to clearly define the supplier strategy, which is a requirement of the enterprise disaster management standard, and to reinforce the linkage, it was studied that the procedure applied by the ordering agency and the supplier, and a standardized procedure for sharing the results produced by the procedure were necessary. Conclusion: Among the procedures for establishing a disaster reduction activity management system for in-house suppliers, an improvement plan was proposed to reinforce the linkage of important procedures, and the proposed contents and procedures were suggested to be reflected in the enterprise disaster management standards and related norms.

e-LEARNING SCORM

  • Mun, Nam-Mi
    • Digital Contents
    • /
    • no.11 s.126
    • /
    • pp.116-118
    • /
    • 2003
  • 미국의 ADL(Advance Distributed Learning)에서 제안한 스콤(SCORM; Sharable Content Object Reference Model)은 2000년 미국 국방부에서 발주한 6억달러에 이르는 e-러닝(e-Learning) 구축 입찰 계약에서 가이드라인으로 쓰여졌다. 용역 입찰 제안서에 스콤을 기초로 해 e-러닝 시스템을 구축하겠다는 내용이 명시돼야만 입찰에 참여할 수 있었던 것이다. 현재 제안된 e- 러닝 기술표준안들에 대한 국제인증 여부와 관계없이 e-러닝 실수요자 및 공급자의 움직임에 따라 이러한 추세는 향후 더욱 확대될 전망이다. 이 글에서는 실질적인 국제 표준으로 가장 근접해 있는 스콤의 내용 및 기술적 특징에 대해 설명하고자 한다.

  • PDF

Suggestion for the Enhancement of Military Supplies via Segregation of Defense Quality Management System (국방 분야 품질경영시스템 세분화를 통한 군수품 품질향상 방안)

  • Ju, Jin-Chun;Kim, Sung-kon;Lee, Jong-chan;Ahn, Nam-Su
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.251-261
    • /
    • 2016
  • Recently, many weapon related quality issues have arisen in the armed forces, such as failures of K-21 Infantry Fighting Vehicles, K-9 self-propelled mounts, and grenade explosion during boot training. Since all of the issues are repetitive phenomena, we examined the defense quality management system and identified the possible solutions for it. Since the government quality assurance agency performs their quality assurance activity using the system evaluation technique, we first reviewed the regulations related to the defense quality management system. Then, we benchmarked some other advanced quality management systems. We suggested two types of defense quality management system, one for small (in terms of the amount of the contract) competitive contracts and the other for large private contracts. For the first one, we adopted the framework of MIL-I-45208 (Inspection System Requirement), while for the second one, we adopted the framework of NATO AQAP 2310 (Quality Management System Requirements for Aviation, Space and Defense Suppliers).

Process Improvements for Reducing Apartment Defects after Completion (준공후 아파트 하자 저감을 위한 절차개선 방안 연구)

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.355-361
    • /
    • 2018
  • Many defects are occurring in apartments, the main residential area in Korea. This is due to a lack of construction skills and a lack of management. As many apartments are provided to buyers, the dispute over defects after completion is increasing rapidly. The Housing Act was amended so that local governments could order contractors to repair defects. However, even if defects are resolved after a defect is generated, it is not a fundamental solution that can be satisfied because buyers have to endure the pain caused by the defect. So, it is necessary to protect the interests of buyers by fundamentally reducing defects in apartments. Therefore, in this study, it was suggested that the asymmetry of the information about the apartment buyers should be resolved at the time of sale of the apartment, the final drawings should be a contract document, the review period of the apartment house supervision should be secured, the appropriate supervisory fee should be secured at the time of contract change and the payment procedure should be improved.

건설산업경쟁력 강화와 부실방지대책(안)

  • 한국주택협회
    • 주택과사람들
    • /
    • no.54 s.71
    • /
    • pp.185-206
    • /
    • 1996
  • 1.건설제도의 국제화와 경쟁기반 구축 $\bullet$건설산업을 기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$사후관리 등 전 분야에 걸쳐 경쟁력 있는 산업으로 육성-기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$유지관리 등 건설산업 전반에 관한 기본사항을 법제화-대규모 공사의 경우 발주자를 대신하여 건설공사의 기획$\cdot$설계$\cdot$발주$\cdot$감리$\cdot$시공관리 등 업무의 전부 또는 일부를 종합적으로 조정$\cdot$관리하는 $\lceil$건설사업관리$\rfloor$제도를 도입 $bullet$건설공사 $\lceil$현장실명제$\rfloor$도입을 통한 하도급제도의 정비-전문건설업자로부터 하도급, 위탁, 고용 등의 형태로 공사에 참여하는 현장근로자를 신고 받아 권익을 보호하고 시공책임도 부과하는 $\lceil$현장실명제$\rfloor$도입 $\bullet$공사완성보증제, 손해배상보증제도를 도입하고, 신용상태 $\cdot$시공능력에 따라 보증 요율 등을 차등화 하여 부실업체를 배제 $\bullet$건설공사관련 각종 계약서와 시방서 등 제기준을 정비하여 발주자$\cdot$시공자 등 건설주체간의 역할과 책임을 명확화$\bullet$건설분쟁을 신속하고 객관적으로 조정$\cdot$중재하기 위하여 $\lceil$건설분쟁중재원$\rfloor$으로 확대 개편 2. 건설인력의 육성과 고용안정$\bullet$경쟁력 제고의 관건인 우수인력 확보를 위하여 대학교육 제도의 개선을 포함한 건설 인력 수급대책을 추진 - 대학의 건설관련 학과 정원을 2000년까지 매년 일정규모로 증원하여 고급기술 인력을 배출 현재 50$\%$에 불과한 건설관련 국가기술자격자를 2000년에 70$\%$까지 제고 - 감리 등 전문인력을 양성하고, 선진외국 감리 회사를 활용하여 국내 업계와의 경쟁을 유도 $\bullet$건설현장의 최일선에서 품질을 담당하고 있는 건설기능공의 고용안정과 복지향상을 위한 획기적인 대책을 마련 - 건설기능공의 자긍심과 사회적 책임의식을 고취하기 위해 기능공이 여러 현장을 전전하여 근무하더라도 경력관리, 공제금 등의 합산 관리가 가능하도록 $\lceil$건설 근로자 복지카드$\rfloor$제도를 도입 *$\lceil$건실시연구단$\rfloor$을 구성$\cdot$구체적인 운영방안을 수립 - 건설 업체 실정에 맞는 현장위주의 기능검정제도 도입 $\cdot$자격증이 현장에서 요구되는 기능수준과 숙련도를 제대로 반영할 수 있도록 검정방법을 현장 실기위주로 개선하고 자격검정업무도 건설협회 등의 자격 검정능력을 향상시켜 위탁$\cdot$시행하는 방안을 검토 3. 공사시행기관의 전문성과 책임성 제고 $\bullet$시장이 개방되어 건설공사가 국제적인 관행에 따라 이루어질 것에 대비하여 시행기관에 계약$\cdot$공사관리 등 전문직공무원을 집중 교육하여 양성 $\bullet$ 조달청이 대행하여 공사계약을 하는 경우라도 설계변경은 발주기관이 자체적으로 할 수 있도록 허용 $\bullet$ 기술직 공무원의 기술향상을 위하여 관련 공무원의 확충, 해외연수, 현장교육 강화 등을 지속적으로 추진 $\bullet$ 충분한 사전조사를 거쳐 사업계획을 수립하도록 $\lceil$건설공사 시행절차$\rfloor$를 규정 $\bullet$ 공사기간 3년 이상의 공사에 대하여는 최대한 계속비사업으로 편성토록 계속비제도의 운영을 활성화 4. 건설현장의 품질관리체제 구축 $\bullet$ 현장배쳐플랜트 설치를 확대하여 레미콘의 품질관리를 일원화하고 현장에서 레이콘을 배합하는 건식공법을 채택 - 현장레미콘생산시설(B/P)설치 확대로 콘크리트 하자에 대한 책임한계 일원화 유도 - 레미콘 재료인 골재$\cdot$시멘트$\cdot$물을 공장에서 혼합하여 공급하는 현행 습식배합 대신에 물만을 현장에서 혼합하는 건식 배합방식을 도입 $\bullet$철강재$\cdot$철구조물의 품질을 보증하기 위하여 일정기술을 갖춘 공장에서만 제작토록 하는$\lceil$공장인증제$\rfloor$를 도입 - 제작시설과 품질관리 등을 심사하여 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 사후관리를 일괄 책임질 수 있도록 $\lceil$시공 및 유지관리 일괄계약제도$\rfloor$를 도입 - 대형교량$\cdot$소각로$\cdot$하수처리장 등 유지관리에 전문성이 요구되는 분야부터 시범적으로 도입 $\bullet$건설자재의 표준화$\cdot$정보화사업을 조속히 추진 5. 건설업체에 대한 지원 강화 $\bullet$일부 공공사업자의 경우 관행화되어 있는 대금일부의 어음 또는 채권지급방법을 단계적으로 축소 $\bullet$매월 감독이나 감리원의 기성확인에 의하여 시공자에게 공사대금을 직접 지급토록 하는 등 대금 지급절차를 간소화 6. 민간 건축물에 대한 안전확보 $\bullet$충실한 설계가 이루어지도록 제도를 개선 - 설계도서 작성기준을 제정하고 다중이용시설에 대하여는 건축심의단계에서 구조검토 등 설계심의를 의무화 $\bullet$대형다중이용시설에 대한 감리 강화 - 감리전문회사 수준의 감리체제로 전환하고 감리대가도 공공수준으로 인상하고 적용요율대로 지도$\cdot$감독 강화

  • PDF

Designing Payments for Environmental Services on Genetic Reserve Forest in Korea (생물다양성서비스 지불제 도입방향: 산림유전자원보호림을 대상으로)

  • Ahn, SoEun;Lee, Chang-Hoon;Ryu, Kwang-Su
    • Journal of Korean Society of Forest Science
    • /
    • v.97 no.3
    • /
    • pp.305-315
    • /
    • 2008
  • Payments for Environmental (or Ecosystem) Services (PES) are emerging as new conservation policy tools. The basic concept underlying PES is that users pay to providers of environmental services for ensuring the continual provision of services based on the voluntary contracts. The purpose of this paper is to introduce the concepts and types of PES and to design a pilot PES scheme for biodiversity/ecosystem conservation on Genetic Reserve Forest in Korea. Genetic Reserve Forest is one of the protected areas designated in Korea to maintain forest biodiversity. PES is designed for the pine forests only in Genetic Reserve Forest, which corresponds to 943 ha. Service providers are to manage their forests based on the contracts in ways that maintain and enhance forest biodiversity and receive the payments in return. The payments are calculated as the sum of management, monitoring, and opportunity costs, resulting 1,140,378 won/year/ha (it corresponds to approximately $1,227 based on the 2007 average exchange rate 1$ = 929.2 won). Because PES are relatively new policies, however, more work needs to be done. Future work includes researches on the correlation between forest biodiversity and management practices and the economic evaluation of forest biodiversity. In addition, enhancing awareness on PES and education of stakeholders are warranted to further develop the scheme.