• Title/Summary/Keyword: 공공 발주자

Search Result 147, Processing Time 0.028 seconds

Strategy Planning for the Development of the Facility-Based Lifecycle Integrated Project Information Portal (시설물 기반 생애주기 통합 건설정보 체계 구축 전략 연구)

  • Kim, Sung-Il;Cho, Jung-Hee;Chang, Chul-Ki
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.9
    • /
    • pp.26-36
    • /
    • 2019
  • Since more than 30 different information systems are collecting and providing construction related information, it is difficult for information users to figure out where and how to acquire the required information. Even if the user find the information, it is hard to meet users demand. Because the current systems accumulate the data just as administrative data and can do not connect the information from the different phases of the lifecycle for the specific facility. The information collected and managed in different information systems should be integrated in terms of lifecycle of the facility to improve money for value of public investment, the quality of life by improving quality of the facility and to provide the foundation for big data utilization in the construction industry. This paper suggested strategic planning for the development of the (assumed name) "The Lifecycle Integrated Construction Information Portal" as a foundation to use the data in construction industry, by investigating prerequisites and suggesting conceptual framework of the system.

SI Project Success and Failure in Korea thru Standish CHAOS Report (Standish CHAOS Report로 본 한국 SI Project의 성공과 실패에 관한 분석 연구)

  • Yoon, Hyeong-Seok;Lee, Seouk-Joo;Lee, Dong-Hyun;Kim, Neung-Hoe;In, Hoh Peter
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2009.11a
    • /
    • pp.827-828
    • /
    • 2009
  • 매년 국내 많은 기업 및 공공기관에서 정보시스템 관련 프로젝트를 수행하고 그 결과는 성공이라고 발표되고 있으나, 2009년 Standish 보고서에서 성공 32%, 도전 44%, 실패 24%이라고 발표되었다.[1] 프로젝트를 수행하는 업체나 발주 업체는 그 성패에 따라서 기업의 운명이 달라진다. 본 연구에서는 실제 공급자(개발업체)가 수행한 프로젝트 사례(A사 282건)를 Standish CHAOS 보고서에 명시된 성패 기준으로 하여 조사 및 통계 분석한 결과는 Standish 보고서에 비교해서 실패 11%( A사 실패 35%) 높게 나왔다. 그 이유는 프로젝트에 대한 관리 프로세스 미정착되어 있으며, PM의 역량에 의해서 좌우 되어진다. 따라서 실패율을 낮추기 위한 지속적인 프로젝트 관리 프로세스가 필요하다. 본 연구의 목적은 국내 IT환경에 개발업체에서 수행한 프로젝트 성공과 실패에 관한 연구로서 (1)기존 문헌을 통하여 프로젝트의 성패에 대한 기준을 정립하고, (2)이를 Standish와 비교하고, (3) 프로젝트 계획 및 관리 프로세스의 중요성을 인식하여 성공을 높이는데 기여하고자 한다.

A Study on Risk Analysis and Management Plan for Development Projects (개발사업(산업단지, 골프장)의 리스크 분석 및 관리방안)

  • Jeong, Min Young;Lee, Min Jae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.2
    • /
    • pp.229-238
    • /
    • 2022
  • With rapid industrialization since the 1960s, development projects have contributed to the development of the national economy. In addition to the development projects promoted by the government, private project operators are also promoting development projects for reasons such as increased public convenience, insufficient financing of SOC assets, and expansion of their own development projects other than public orders. However, as the economy has been stagnating due to several factors such as continued supply of facilities for decades and recent COVID-19, the success of the development projects are unsure these days. Therefore, this study attempted to analyze project costs through the case of such development projects, and to present a plan to judge and manage the risks of each project cost item in advance. The AHP technique, which is widely used as a risk factor selection method for existing development projects, was used, and items were determined through interviews with experts related to development projects in order to stratify the upper and lower subjects of the risk. We analyzed how the derived risk factors affect the business performance through sensitivity analysis, and finally substituted the risk factors management plan into the risk response strategy and suggested.

An Analysis of Perceptions by Road Construction Engineers on ICEC Framework at the time of System Transition, from Responsibility Supervision to Construction Management (II) - Focused on CM Terminology & ICEC Coordination - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(II) - CM 용어와 ICEC 조정을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1357-1366
    • /
    • 2015
  • This study (II) aims to draw up the future-oriented construction policy recommendations based on the outcomes as a result of a broad research and conducting questionnaire surveys on the arguable issues raised by construction engineers for roads and bridges in the course of previous study (I) implementation. As for the question of "The term 'Construction Management (CM)' which currently is defined in two (2) ways", 45% of respondents have answered that two (2) different types of CM should be unified into one (1) CM type as is the case in most advanced countries. About the question of "The ways to educate the CM professionals", many respondents have preferred to acquire CM professional certificate after receiving education for a certain period of time from private CM training institutions. As for the question of The revised draft that the ICEC grade of special engineers for design, construction and quality control areas shall be "more than 78 points from a more than 75 points by the original draft." 52% of respondents preferred to maintain the original draft. About the question of "The reason why the CM system has not been working well yet." 62% of respondents have answered that the staff members who are in charge of handling public project procurements are concerned about the fact that their roles (or activities) might be deprived as a result of CM adoption. In order for the CM system to be activated, based on the notion that the construction projects must be out soured, the reshuffle of the headquarter organization of Ministry of Land, Infrastructure and Transportation (MLIT) should be preceded.

A Study on the Problem and Improvement of Screening System of Low Price Subcontracting by Analyzing a Standard of Judgement Criteria (원도급자 측면에서의 저가하도급 판정기준의 문제점과 개선방안)

  • Kim, Soon-Young;Han, Choong-Hee;Baek, Tae-Ryong;Kim, Kyoon-Tai;Lee, Jun-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.107-116
    • /
    • 2009
  • As the Fundamentals of Construction Business Act was revised in December 2004 and its implementing ordinances and enforcement regulations were adjusted in June 2005, the screening system of low price subcontracting has been an obligation to the public owners, having brought about arguments for and against since it enacted in 1983. The statutes for low price subcontracting have been reinforced from this year; for example, it underlines to submit to a project and builds an information network of subcontracting works. The system's original intention was that prevents shoddy and fraudulent constructions caused by low price subcontracting and precludes disturbances of fair trade by screening that whether it satisfies the conditions or not in advance. But, the criterion for the existing low price subcontracting has several issues having held up a true mirror to the real situation. It is arguable to discharge an important task with the primary purpose. This dissertation have researched the problem with a deposit of subcontract and the low price subcontracting basic rate are being used by the criteria for deciding whether it is a low price subcontracting or not, so showing the plan of reformation based on the findings, it wishes to contribute toward making the most of the system's essential intent.

Developing a Program Performance Management Framework for Mixed-use Development in Urban Regeneration Projects (입체복합공간 개발사업의 프로그램 성과관리 체계 구축)

  • Lee, Kang-Wook;Hong, Hwa-Uk;Park, Hee-Dae;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.141-152
    • /
    • 2011
  • The market volume of urban regeneration projects has steadily increased, thereby mixed-use development also shows significant market growth. However, previous researches on urban regeneration mainly deduced suggestions and plans for institution improvement based on comparison between projects implemented the inside and outside of the country. Whereas, researches on project management closely related to project success were limited, particularly in performance management. Accordingly, this research aims at developing a program performance management framework for public clients so as to succeed mixed-use development projects. Through extensive literature review and expert interview, this research developed performance indices for diverse facilities, risk management framework and integrating method of program performance score. The proposed framework is able to consider total life cycle from basic planning to maintenance phase and to check real-time performance level. Moreover, risk management framework can periodically assess and control the level of inherent risks within performance indices. The results can contribute to improve existing performance management practices and be basis for a web-based system developed in future.

Panamax Second-hand Vessel Valuation Model (파나막스 중고선가치 추정모델 연구)

  • Lim, Sang-Seop;Lee, Ki-Hwan;Yang, Huck-Jun;Yun, Hee-Sung
    • Journal of Navigation and Port Research
    • /
    • v.43 no.1
    • /
    • pp.72-78
    • /
    • 2019
  • The second-hand ship market provides immediate access to the freight market for shipping investors. When introducing second-hand vessels, the precise estimate of the price is crucial to the decision-making process because it directly affects the burden of capital cost to investors in the future. Previous studies on the second-hand market have mainly focused on the market efficiency. The number of papers on the estimation of second-hand vessel values is very limited. This study proposes an artificial neural network model that has not been attempted in previous studies. Six factors, freight, new-building price, orderbook, scrap price, age and vessel size, that affect the second-hand ship price were identified through literature review. The employed data is 366 real trading records of Panamax second-hand vessels reported to Clarkson between January 2016 and December 2018. Statistical filtering was carried out through correlation analysis and stepwise regression analysis, and three parameters, which are freight, age and size, were selected. Ten-fold cross validation was used to estimate the hyper-parameters of the artificial neural network model. The result of this study confirmed that the performance of the artificial neural network model is better than that of simple stepwise regression analysis. The application of the statistical verification process and artificial neural network model differentiates this paper from others. In addition, it is expected that a scientific model that satisfies both statistical rationality and accuracy of the results will make a contribution to real-life practices.