새 정부는 '행복주택 프로젝트', '임대형 보금자리주택 확대' 등 공공 임대주택 공급확대를 주요 정책과제로 추진할 것으로 보인다. 이러한 공공임대주택 확대 정책은 기본적으로 바람직하나 임대주택의 양적 질적 향상을 위해서는 민간과 공고의 역할 분담이 필요하다. 여기서는 현대경제연구원의 '민간 임간주택 산업 활성화 방안' 보고서를 통해 일본의 민간 임대주택 산업 발전 사례를 분석하고 국내 임대주택 산업구조 개선을 위한 정책적 시사점을 도출해 본다.
Journal of Korean Association for Spatial Structures
/
v.8
no.6
/
pp.85-94
/
2008
This paper is concerned with the domestic and foreign PV integrated projects in view of structural design. These projects are classified with public and display 6 facilities. The evaluated items are natural integration with building, engineering details and innovative new design. 6 domestic public and display facilities are frequently using isolated supporting system at roof, but show weakness in design integration. But the cases, using the PV panel in the stage of design some display facilities, are increasing. In the other hand, foreign public and display facilities are using the modul connection majorly and the structural and design integration are obtained.
Proceedings of the Korea Database Society Conference
/
2001.11a
/
pp.526-535
/
2001
우리나라 시스템 통합(System Integration) 프로젝트는 최근 들어 공공부문을 중심으로 점차로 대형화되고 장기간에 걸쳐 수행되는 추세에 있다. 그러나, 프로젝트를 주도해야 할 IT 인력의 이직률이 증가되고 근속기간이 점차 단축되는 현상은 국내 산업계의 기술축적과 경쟁력 제고에 걸림돌이 되고 있다. 본 연구의 목적은 대규모 시스템 통합 프로젝트를 수행 도중에 이직한 IT 인력의 이직 원인이 무엇인지 알아보며 이직방지를 위한 대안을 제시하는 것이다. 이를 위해 기존의 연구에서 공통적으로 제시하는 이직 영향요인을 업무측면, 인간관계 측면, 처우측면으로 재구성 한 설문분석을 통해 어떤 요소들이 이직에 큰 영향을 미치는지를 분석하였다. 또한 사례연구를 통해 응답자들을 업무적 성향과 처우적 성향별로 분류하여 이직에 영향을 준 각 측면별 이유와 해결책 및 시사점을 도출하였다. 본 연구의 결과는 IT인력에 대한 기존의 이직방지 대책보다는 효율적으로 IT인력을 운용 할 수 있는 참고기준이 될 수 있을 것이다.
Proceedings of the Korea Database Society Conference
/
1999.10a
/
pp.165-171
/
1999
형상관리는 프로젝트를 추진함에 있어 현실적으로 필수적인 관리 항목으로 인식할 필요성이 대두되고 있다. 그 이유는 프로젝트를 성공적으로 완료하기 위해서는 전체 프로젝트 공정을 통해 사전에 계획된 절차에 준하여 단계별로 어떻게 추진되고 있는지 추진과정을 추적, 확인되어야 하며, 또한 추진 결과에 있어 단계별로 어떤 결과물이 양산되고 있는지를 검증 및 확인하여야 하기 때문이다. 본 논문에서는 이러한 형상관리를 위해서는 프로젝트 수행 초기에 형상관리 계획을 입안하기 위한 형상관리 조직형태를 제안하며 작성된 계획서에 수록된 형상관리 조직을 운영함에 있어 필요한 형상관리활동의 주요 내용들에 대해 국내외 표준 및 지침에 대해 조사하였으며, 현실적으로 공공 프로젝트를 추진함에 있어 형상관리를 위한 필수관리 항목과 문서화 기준 및 이들 문서들간의 연관성에 대해 연구, 제안한다.
Public construction projects are implemented by government or public agencies using public resources to enhance the welfare of the people. Therefore, this paper investigates the impact factors for public construction performance. Then, the weights for impact factors are assigned using AHP. The impact factors are categorized into construction policies, project management efforts, and project environment. Further, 16 detail impact factors are listed in each category. The results show that weights are ordered in appropriate budget, reasonable project implementation process, and pre-project planning. These impact factors are related with pre-construction management activities. However, construction related impact like procurement, work difficulty, and construction environment show relatively low weights. The results can be useful to improve construction performance with managing impact factors showed high weights.
Proceedings of the Korean Institute of Building Construction Conference
/
2009.05b
/
pp.203-207
/
2009
These days Construction Industry is one of the major industry in public project and it has many problems. And Construction Industry highly respond to a chage of IT, politics, economy, domestic and international situation. And it causes an uncertainty in Korea economy. The goal of this paper is showing the efficiency application of BIM in Public Project. And this paper follow three steps. First, these day's trend of BIM and delivery method are researched. Second, major factors are thrived to appreciating BIM Third, delivery method based on BIM is proposed. Major factors of delivery method are researched to make guide line of delivery method in public project in the future.
Proceedings of the Korea Information Processing Society Conference
/
2007.05a
/
pp.497-501
/
2007
최근 소프트웨어 개발 기술이 발전함에 따라 사용자들의 관심이 높아지면서 컴포넌트 기반의 개발방법이 빠르게 도입되고 있다. 사용자의 서비스에 대한 요구가 다양해지면서, 다양한 요구를 소프트웨어에 반영하여 단기간에 개발해야 하는 경우가 점차 늘어나고 있으며 산출물의 수도 점차 증가하고 있는 추세이다. 그러나 현실적으로 사업 유형별, 사업 주체별, 그리고 적용 방법론 별로 납품해야 하는 산출물이 서로 다르고, 산출물의 내용 역시 개발목적과 관리목적에 따라 다양하므로 이러한 내용들을 표준화하기가 쉽지 않은 것이 현실이다. 이런 점을 고려하여 본 논문에서는 각 방법론에 대한 산출물들을 비교 정리하여 향후 단기 개발 공공 프로젝트에서 산출물 선정 및 관리를 효율적으로 할 수 있는 가이드라인을 제시하고자 한다.
Journal of the Korean Institute of Landscape Architecture
/
v.44
no.2
/
pp.11-24
/
2016
This study, which takes the New York Governors Island project as an example, is an in-depth analysis of the process of participatory design for transforming a space that had long been isolated from the public into a park and/or communal space. We found that the process of participatory design at each project phase consists of the following. First, in the preparatory phase, there was construction of public discourse: efforts to find a consensus to develop the space in a public-driven direction was led by various initiatives. Second, by opening the site to the public before the design phase and by consistently inviting a wide range of activities, a community was formed and its attachment to the site was established. Third, after the competition until the completion of the project master planning phase, substantial and active participatory design was enabled through social interaction of the community formed and developed over many years. Fourth, in the detail design and implementation phase, a traditional and passive way of participatory design such as public hearings was used, thereby preserving the expertise of professional designers. Public participation was reflected most in the master planning phase to create a broad framework of the park, while professionals designed the more specific aspects; this efficient and effective approach enabled both citizens and professionals to dutifully take part in developing the park. The results of this study can be summarized as follows. The mode of participatory design should be varied at each project phase, from construction of public discourse, to formation and development of the community, to participatory design for social interaction. Furthermore, it is effective to preserve the unique roles of citizens and design professionals. It is particularly important to extend the process of participatory design to include the construction of public discourse and community.
In recent public institutions and banks to improve competitiveness in the integration of information systems projects are larger in size and may be the project's ever-growing need appropriate software project management plan. However, between the effect of the project management area for systematic research was scarce. Through this study, previous research in the important area of project management is developed, and "scope, schedule, quality, human resources, risk" of each area of impact analysis and the interaction between the progress of each area, the planning, execution, completion Performance levels were analyzed separately. Affected and Performance Analysis of the results to assess the level of the project management model is presented.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.