Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.31
no.1
/
pp.99-107
/
2013
With the expansion of the development and use of surveying equipment recently, by the establishment of infrastructure for network RTK surveying of the NGII, network RTK surveying has been widely used in surveying industry. Currently, in public surveying regulations, site calibration with minimum 5 evenly spaced bench marks is needed for using network RTK surveying results as leveling. But the range between and the number of bench marks for site calibration can be varied according to the geoid undulation. In this study, in order to verify this, Incheon area having regular geoid undulation and Taebaek area having irregular geoid undulation are selected as study area and network RTK surveying have been done. Then the accuracy of site calibration by range between and the number of bench marks have been compared. As a result of this study, in order to meet a tolerance of vertical precision (0.1m) that has been set in public surveying regulations, there is a necessity for improving the regulations so that the range and number of bench marks, to be used for site calibration of network RTK surveying, can be applied complementarily.
Proceedings of the Korea Contents Association Conference
/
2003.11a
/
pp.431-435
/
2003
GPS측량 방법은 크게 나누어 후처리 방법과 실시간 처리 방법으로 구분되며 후처리 방법은 다시 Static, Stop&Go 및 동적(Kinematic) 방법으로 세분되고 실시간 처리 방법은 DGPS(Differential GPS)와 RTK(Realtime Kinematic) 방법으로 세분된다. 이와 같은 여러 가지 측량법 중 우리나라의 실무에서는 유독 후처리 방법 중의 Static 측량과 실시간 처리방법중의 DGPS 측량이 주로 사용되어 왔는데, 그런 배경에는 여러 가지 원인이 있으나 무엇보다도 가장 큰 원인은 공공측량 작업규정 등의 측량 관련 법규에서 다양한 종류의 GPS측량기법을 제도적으로 인정하지 못함으로 인하여 일반 측량기술자들의 GPS에 대한 인식이 결여된 때문이라 볼 수 있다.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.36
no.6
/
pp.457-467
/
2018
Currently, the regulation and rules for public surveying and the UCPs (Unified Control Points) adapts those of the triangulated traverse surveying. In addition, such regulations do not take account of the unique characteristics of GNSS (Global Navigation Satellite System) surveying, thus there are difficulties in field work and data processing afterwards. A detailed procesure of GNSS processing has not yet been described either, and the verification of accuracy does not follow the generic standards. In order to propose an appropriate procedure for field surveys, we processed a short session (30 minutes) based on the scenarios similar to actual situations. The reference network in Seoul was used to process the same data span for 3 days. The temporal variation during the day was evaluated as well. We analyzed the accuracy of the estimated coordinates depending on the parameterization of tropospheric delay, which was compared with the 24-hr static processing results. Estimating the tropospheric delay is advantageous for the accuracy and stability of the coordinates, resulting in about 5 mm and 10 mm of RMSE (Root Mean Squared Error) for horizontal and vertical components, respectively. Based on the test results, we propose a procedure to estimate the daily solution and then combine them to estimate the final solution by applying the minimum constraints (no-net-translation condition). It is necessary to develop a web-based processing system using a high-end softwares. Additionally, it is also required to standardize the ID of the public control points and the UCPs for the automatic GNSS processing.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.40
no.4
/
pp.343-350
/
2022
The computerization project for underground facilities in Korea began in earnest after the city gas explosion in Seoul in 1994, and the Daegu subway explosion in 1995. As such a large-scale gas explosion accident caused enormous economic loss including human casualties and potential benefits, the need for computerized for efficient management of underground facilities was greatly emphasized in society. Meantime, computerization of underground facilities has been carried out according to the basic plan for building national geographic information system. In this study, problems were identified based on the current status of construction and management of underground facility information, as well as laws and regulations, and directions for establishing quality standards were presented. In addition, construction work standards such as 「Public Survey Work Regulations」, design standards, standard specifications, and technical specifications, gas technology standards, design standards, and communication works so that underground facility information can be linked and utilized in construction work by examining the linkage of the underground facilities, the targets that can be used for quality level information on underground facilities were derived, and a proposal to revise the construction standards was presented. In the future, if the quality standards are established, it is expected that the accuracy and utilization in the construction field will be increased.
Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
/
2003.10a
/
pp.433-437
/
2003
고해상도 위성영상을 이용하여 수치표고모델(DEM) 및 정사영상을 제작해서 수치지도의 갱신 및 지형공간정보체계의 자료기반으로써 활용할 수 있다. 본 연구에서는 Sobel 연산자를 이용하여 경계추출을 행한 후 스크린 디지타이징 방법으로 경계선을 추출하였다 이렇게 추출된 벡터자료와 기존수치지도와의 중첩을 통해서 건물, 도로, 임야의 평균위치오차를 분석해 보았다. 평균위치오차가 공공측량의 작업규정에 대한 1 : 5,000 수치지도 제작의 허용오차범위에는 들지 못하였지만, 특정 부분의 지형·지물의 경우에는 수정, 보완이 가능한 것으로 나타났다. 그리고, 산악지역 보다는 도심지에서의 경계추출이 뚜렷하기 때문에 위치정밀도가 향상됨을 알 수 있었다.
The Journal of Korea Institute of Information, Electronics, and Communication Technology
/
v.15
no.4
/
pp.249-256
/
2022
In the case of Drone Photogrammetry, the "pixel to point tool" module of Metashape, Pix4D Mapper, ContextCapture, and Global MapperGIS, which is a simple software, are widely used. Each SW has its own logic for the analysis of aerial triangulation, but from the user's point of view, it is necessary to select a SW by comparative analysis of the coordinate values of geospatial information for the result. Taking aerial photos for drone photogrammetry, surveying GCP reference points through VRS-GPS Survey, processing the acquired basic data using each SW to construct ortho image and DSM, and GCPSurvey performance and acquisition from each SW The coordinates (X,Y) of the center point of the GCP target on the Ortho-Image and the height value (EL) of the GCP point by DSM were compared. According to the "Public Surveying Work Regulations", the results of each SW are all within the margin of error. It turned out that there is no problem with the regulations no matter which SW is included within the scope.
Park, Jin Sol;Han, Joong-Hee;Kwon, Jay Hyoun;Shin, Han Sup
Spatial Information Research
/
v.22
no.3
/
pp.23-24
/
2014
NGII (National Geographic Information Institute) has been providing VRS (Virtual Reference Station) service so that could determine precise positioning in real time since 2007. However, since the VRS service has to maintain the connected status with VRS server, the number of users who can use VRS service are limited by capacity of VRS server. To solve this problem, NGII has been providing FKP (Virtual Reference Station) service using one way telecommunication from November 1, 2012. Therefore, it is predicted that the usage of FKP service will increase in public surveying and cadastral resurveying in the future. However, the studies with respect to analysis of FKP precision for applying to public surveying and cadastral resurveying is not conducted enough. In this study, to analyse the application possibility of FKP on the public surveying and cadastral resurveying, the two kind analysis were performed. First is the analysis of accuracy according to the configuration of reference station of FKP and VRS. One is consisted of same reference stations, another is consisted of different reference stations. Second is the accuracy anlalysis of horizontal and vertical positioning acquiring VRS and FKP data in various measurement environment based on VRS regulation. Result of first study, Positioning accuracy according to the configuration of the reference stations satisfies related regulation. However, accuracy of FKP in case of different reference stations is worse than in case of same reference stations.. The result of second test shows that the horizontal precision of FKP and VRS in good measurement environment satisfy the allowed precision. However, in some case, horizontal precision of FKP and VRS in poor measurement environment exceed the allowed precision. In addition, the number of exceeding the allowed precision in the FKP is more than the VRS. The vertical precision of the VRS satisfy related work provision. In conclusion, the result of this study shows that the FKP only in open area should be used for public survey and cadastral resurvey. Therefore the additional studies with respect to the improvement of FKP precision should be conducted.
Proceedings of the Korea Water Resources Association Conference
/
2020.06a
/
pp.232-232
/
2020
하천기본계획 수립이나 생태하천 조성사업 등 다양한 하천사업에서 하천측량은 대상 하천의 지형 현황과 과거 사업이후의 변화량을 확인할 수 있는 중요한 요소이다. 국내 측량 기준인 공공측량작업규정(국토지리정보원)에서 하천 측량은 육지부에서는 횡단측량을 수부에서는 수심측량을 실시하고 수심측량은 음향측심기 사용을 원칙으로 한다. 국내 대부분의 수심측량은 단빔 음향측심기를 사용하고 있는 실정이며 일부 수심 확보 구간 또는 연구목적으로 멀티빔 음향측심기를 적용한 사례가 일부 보고된 바가 있다. 최근 수심측정이 가능한 항공수심측량(Airbone LiDAR Bathymetry) 장비 중 핵심계측기기인 Green LiDAR 센서 국산화 및 경량화에 관한 연구가 진행중이다. 이에 본 연구는 국내 하천 여건에서 개발 센서가 어느 정도의 활용성을 확보할 수 있는지를 검토하였다. 우선 환경부가 운영중인 수질자동측정망 71개 지점의 정기측정성과 중 탁도에 관한 일자료를 확보가 가능한 45개 지점을 대상으로 G-LiDAR 센서의 SD(Secchi Depth)를 기준으로 가용계측일을 산정해 보았다. 분석기간은 '12. 7.부터 '19.12.까지이며 분석기간중 SD 1.5m(1.94 NTU 추정) 기준을 만족하는 기간은 한강 2.07년, 낙동강 0.64년, 금강 2.21년, 영산강 2.71년으로 나타났다. 또한 지점별 가용기간 분석결과 분석기간인 7.33년 동안 탁도 기준이하인 운영 가능 기간은 연중 평균 80여일(2.74개월)로 나타나 제한적이나마 활용이 가능할 것으로 확인되었다. 향후 현장조사를 통해 공공측량 성과와 대상수계의 탁도 실측자료와의 연계분석을 통해 정확한 활용성 검토를 수행할 예정이다. 향후 적용 센서의 개발 성능목표를 달성한다면 하천내의 다양한 분야에서 활용이 가능할 것으로 기대된다.
Kim, Jae-Myeong;Lee, Byung-Woon;Choi, Yun-Soo;Yoon, Ha-Su
Spatial Information Research
/
v.18
no.4
/
pp.23-32
/
2010
Water mains underground facilities are essential components to make up urban infrastructure. In order to manage these water mains underground facilities systematically and scientifically, GIS (Geographic Information System) had been constructed. For the sake of construction of GIS for water mains underground facilities, an exact underground detection and the construction of DB (Data Base) for buried water mains underground facilities should be preceded. In this study, in order to find out the ways to improve exact detection rate of data, the statistical analysis for the causes of detection raw degradation was done, and standardization methods of detection through a case study were suggested, When water mains underground facilities were measured, the detection of non-metallic water pipes was not carried out. The reason was that the results of detection was uncertain and detection was difficult because the assessment of public measurements was vulnerable. Moreover, due to the absence of standardized operating regulations for detection, systematic surveys weren't conducted. In this study, methods to standardize works over the detection of water mains underground facilities were presented so that we can improve the detection rate when we are doing that. As the proposals to improve detection rate, effective performance assessment over non-metallic pipes were presented, and related issues to supplement work regulations of public survey were described systematically.
The purpose of this study is digitalization of earthwork such as development of 3D terrain analysis platform using latest technologies including unmanned aerial vehicle and terrestrial laser scanner to ultimately achieve earthwork automation. It is necessary to develop related element technologies and to establish regulations so that it can be applied to the domestic construction projects. As a result of pilot project about the earthwork surveying automation technology, it was confirmed that information such as terrain coordinates, soil, boring, and excavation volume is acquired smoothly. In this paper, we investigate related regulations and manuals in Japan and propose the improvement plan of domestic regulation. We plan to study regulations from early to final construction stage, combine with the 'regulation for public surveying', and improve the regulations in detail.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.