• Title/Summary/Keyword: 골재 하역

Search Result 2, Processing Time 0.019 seconds

Environmental Maintenance Technology for Concrete Manufacturing Industry by Using an Automatic Fugitive Dust Reduction System (비산먼지 자동 저감시스템을 이용한 콘크리트 제조업 환경 유지관리 기술)

  • Hyun-Woo Cho;Yoon-Seok Chung;Deuk-Hyun Ryu;Yun-Yong Kim
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.4
    • /
    • pp.70-77
    • /
    • 2023
  • Fine dust is a cause of serious ecological problems, and fugitive dust generated from construction sites is a major source of fine dust in Korea. However, at construction sites, including concrete manufacturing industry sites, measurements are rarely made at the fugitive dust generation stage, and passive removal methods are the majority. Therefore, in this study, a fugitive dust measurement method suitable for managing fugitive dust generated during aggregate unloading in the concrete manufacturing industry sites was selected. In addition, the purpose was to analyze the amount of fugitive dust reduction according to the operation of the reduction system by applying the automatic fugitive dust reduction system to the aggregate unloading site. As a result, the reliability of the light scattering method was secured through the comparative measurement of the beta-ray absorption method and the light scattering method, and the light scattering method correction coefficient was calculated and applied to the measured value of the fugitive dust particle mass concentration at the concrete manufacturing industry sites. In addition, the fugitive dust reduction rate according to the operation of the automatic fugitive dust reduction system was derived.

A Study on Estimating Construction Equipment Annual Standard Operating Hours (건설기계 연간표준가동시간 산정에 관한 연구)

  • Lee, Joong-Seok;Huh, Young-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.219-224
    • /
    • 2007
  • As use of construction equipment has been increasing continuingly, the proportion of equipment expense to the total construction cost has become higher. However, there is a difference between the equipment expenses section in 'Poom-Sam' and practical data, because 'Poom-sam' does not consider non-working days due to weather conditions, legal holidays and management conditions. Therefore, 'Poom-Sam' does not present a reasonable standard for estimating construction equipment expenses. In this study, to estimate realistic construction equipment operating hours, firstly, construction equipment was classified according to work, and weather conditions, in which each work could not be executed, were established. Then, weather data on Seoul and Busan(2004${\sim}$2006) and legal holidays were analyzed to suggest annual standard operating hours. The annual standard operating hours of earthmoving & excavating, compaction, and drilling equipment was estimated to be 1,430 hours, and lifting equipment, concrete paving equipment, asphalt paving equipment, concrete equipment, and crushing & conveying equipment were estimated to be 2,124 hours, l,156hours, 1,188hours, 1,688hours, and 2,152hours respectively.

  • PDF