• Title/Summary/Keyword: 고장시간간격

Search Result 72, Processing Time 0.016 seconds

A Study on Determination of Capacity for Pump and Detention Pond in Small Basins for Flood Control (소유역에서 홍수조절용 펌프 및 유수지 규모의 결정에 관한 연구)

  • Ahn, Tae-Jin;Park, Jong-Yoon;Lyu, Heui-Jeong;Kim, Joong-Hoon
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.3 s.134
    • /
    • pp.385-398
    • /
    • 2003
  • The concept of the effective storage ratio has been suggested to determine the size of detention pond by the previous researchers. The 11 pump - pond facilities in Dongdu-chun city were selected to analyze the critical duration for design rainfall and the storage ratio for each rainfall duration in this study It has been then found that the criteria of the maximum storage ratio is not reasonable for determining the size of detention pond because the difference of storage ratio with respect to each rainfall duration is too small. Moreover, since the size of pond compared with the pump capacity is not always big enough, the pump should be frequently operated, which may result in pump failure. Thus, the pond should be sufficiently sized to prevent the possibility of the pump failure due to frequent operation. According to the analyses for changing pump capacity, it has been found that if the function of the pond compared with the pump is concentrated, determining the size of pond based on the storage ratio is operationally feasible for even small basin. Thus, an improved procedure based on the storage ratio for determining the size of detention pond in small basin has been suggested. The results by the proposed procedure considering pump switching frequency may lead to reasonable pump operation. A simple linear programming model has been also adopted to figure out the relationship between pump capacity and pond size. It has been shown that the determination lot the size of detention pond based on conventional hydrologic flood routing in pond is feasible for only urban districts not rural areas.

Analysis of Abnormal Values Obtained from National Groundwater Monitoring Stations (국가지하수 관측소 측정자료의 이상값 분석)

  • Yi Myeong-Jae;Lee Jin-Yong;Kim Gyoo-Bum;Won Jong-Ho
    • Journal of Soil and Groundwater Environment
    • /
    • v.10 no.1
    • /
    • pp.65-74
    • /
    • 2005
  • National groundwater monitoring stations have been managed throughout the country by Korea Water Resources Corporation (KOWACO) in order to monitor variations in quantity and quality of groundwater resources. A multi-sensor installed in each monitoring station well measures groundwater level, water temperature and electrical conductivity every six hours and the logged data are automatically transmitted to a host computer in KOWACO. Meanwhile despite regular station inspection and replacement of deteriorate or broken devices, abnormal values or outliers often occur due to intrinsic limitations of automatic monitoring and transmission. Thus prompt recognition and measures to these values are essentially required to reduce disturbance and missing period of the data. In this study, time and frequency of outlier occurrence were analyzed for the water level data obtained from national groundwater monitoring stations within the Han river basin in 2000. The analysis results indicated that the most prominent patterns of the outliers were rapid decline for water level, no variation for temperature and steep decline for electrical conductivity. This study provided a sample criterion for determining the outlier for each parameter.