• Title/Summary/Keyword: 고속도로 포장

Search Result 139, Processing Time 0.021 seconds

Development of Pavement Condition Index for the Municipal Pavements (시단위 포장도로의 포장평가지수개발)

  • Moon, Hyung-Chul;Suh, Young-Chan
    • International Journal of Highway Engineering
    • /
    • v.10 no.3
    • /
    • pp.221-230
    • /
    • 2008
  • In Korea, Expressway and National Highway System has been continually managed by their own pavement management system. The pavement condition evaluation system has not been developed for the municipal roads except for Seoul city. Therefore, this study focuses on analyzing the characteristics of distress in major city's pavement and developing the pavement condition index for the municipal PMS. Panel rating and pavement condition survey for the selected pavement sections were conducted for developing pavement condition index. Municipal level pavement condition index(MPCI) was developed by statistical analysis. Also, a sensitivity analysis for each independent variable of the MPCI and comparison with other pavement condition indicies, such as SPI and HPCI, were performed.

  • PDF

Characteristics of Pollutant Washed-off from Highways with Storm Runoff Duration (아스팔트 포장 고속도로의 강우 지속시간별 오염물질 유출 경향)

  • Kim Lee-Hyun;Lee Eun-Ju;Ko Seok-Oh;Kang Hee-Man
    • International Journal of Highway Engineering
    • /
    • v.8 no.1 s.27
    • /
    • pp.99-106
    • /
    • 2006
  • During the dry periods, many types of pollutant are accumulating on the paved surface by vehicle activities. Particularly, the highways are stormwater intensive landuses because of high imperviousness and high pollutant mass emissions from vehicles. The accumulated pollutants in highways are washed-off during a rainfall event and are highly contributing on water quality of receiving water bodies. The stormwater runoff from the highways are containing various pollutants such as metals, oil & grease and toxic chemicals originated from vehicles. Therefore, this research is performed to find pollutant characteristics in the magnitude of statistical pollutant concentrations during storm periods. During the monitoring periods, the first-flush phenomenon is visibly occurred on most storm events, which is confirmed from hydro- and pollute-graphs. The 95% confidence intervals of washed-off pollutant concentration are ranged to 154.7-257.1 mg/L for 755,138.9-197.6 mg/L for COD, 3.5-6.4 mg/L for oil & grease, 6.3-9.2 mg/L for TN and 2.3-3.31 mg/L for TP. The first flush effect is mostly occurred within initial 30 min of storm duration.

  • PDF

Development Status of Korea Accelerated Loading and Environment Simulator (KALES) (한국형 포장가속시험시설의 개발현황)

  • Yang, Seong-Cheol;Yu, Tae-Seok;Eom, Ju-Yong
    • International Journal of Highway Engineering
    • /
    • v.2 no.2
    • /
    • pp.139-148
    • /
    • 2000
  • Currently existing Accelerated Pavement Testing (APT) systems developed in several countries have been employed mainly to test the performance of asphalt pavement. Meanwhile, the length of concrete pavement is similar to that of asphalt pavement in expressways of Korea. and is expected to increase due to its durability and compatibility to our weather condition. To meet the society's demand of having our own APT system which can examine the long-term performance of concrete pavement, a contract study to develop Korea Accelerated Loading and Environment Simulator (KALES) for concrete pavement has been performed for 3 years from 1997 through 1999. Through the project, a detailed design was Peformed for the KALES system in which the entire structure of KALES, loading mechanism, wandering mechanism, suspension system, driving system were proposed. Also in advance to design a full-scale KALES system, a sample scale model was manufactured and tested for operating motion and force distribution. It is evident that the proposed prototype KALES system will provide higher degree of traffic simulation and durable operation, based on the satisfactory fatigue analysis.

  • PDF

Development of Deep Learning Based Deterioration Prediction Model for the Maintenance Planning of Highway Pavement (도로포장의 유지관리 계획 수립을 위한 딥러닝 기반 열화 예측 모델 개발)

  • Lee, Yongjun;Sun, Jongwan;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.34-43
    • /
    • 2019
  • The maintenance cost for road pavement is gradually increasing due to the continuous increase in road extension as well as increase in the number of old routes that have passed the public period. As a result, there is a need for a method of minimizing costs through preventative grievance preventive maintenance requires the establishment of a strategic plan through accurate prediction of road pavement. Hence, In this study, the deep neural network(DNN) and the recurrent neural network(RNN) were used in order to develop the expressway pavement damage prediction model. A superior model among these two network models was then suggested by comparing and analyzing their performance. In order to solve the RNN's vanishing gradient problem, the LSTM (Long short-term memory) circuits which are a more complicated form of the RNN structure were used. The learning result showed that the RMSE value of the RNN-LSTM model was 0.102 which was lower than the RMSE value of the DNN model, indicating that the performance of the RNN-LSTM model was superior. In addition, high accuracy of the RNN-LSTM model was verified through the comparison between the estimated average road pavement condition and the actually measured road pavement condition of the target section over time.

Consideration of Speed Camera for Controling Road Traffic Noise (과속 단속카메라의 고속도로 소음저감대책 적용 효과 검토)

  • Kim, Chulhwan;Choi, Yoonhyeock;Chang, Taesun;Kim, Deuk Sung
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.868-869
    • /
    • 2014
  • 고속도로 주변에 공동주택이 건설되면서 도로소음에 의한 민원이 크게 증가하고 있다. 이러한 민원에 대한 소음대책 방법으로 방음벽이 주로 사용되고 있지만, 공동주택이 고층화 되어감에 따라 방음벽만으로는 대책이 어려운 경우가 자주 발생하고 있다. 이에 따라, 최근에는 방음터널, 저소음포장, 과속 단속카메라 등이 소음대책 방법으로 제안되고 있고, 본 연구에서는 과속 단속카메라의 소음저감효과에 대해 분석하고 평가하였다.

  • PDF

A Study on the Factors Affecting on the Life of Bonded Concrete Overlay Pavement using the LTPP Data of U.S.A (미국 LTPP Data를 활용한 접착식 콘크리트 덧씌우기 포장 수명에 영향을 미치는 인자에 관한 연구)

  • Lee, Seung Woo;Son, Hyeon Jang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4D
    • /
    • pp.555-564
    • /
    • 2011
  • More than sixty percentages of the highway constructed by concrete pavements in South Korea and over half of the concrete pavements were twenty years or older. The most of South Korea road is hard to provide a bypass in conditions of network of roads. Asphalt concrete overlay has been used for the overlay of aged concrete pavement. However, the cost of maintenance and rehabilitation in an asphalt overlay is expensive by early damage. Therefore, bonded concrete overlay was recently attempted in South Korea as an alterative method of rehabilitation for aged concrete pavement. Hence, it needed to investigate the factors to find performance of the bonded concrete overlay life. However, there is no performance data of the concrete overlay in South Korea. This study was to make a database of an affecting of the pavement life and draws statistical analysis of the performance data on the LTPP (Long Term Pavement Performance) database of U.S.A.

Behavior and Resistance to the Reflection Crack of Composite Pavement with Waterproof Membrane (접착식 방수층을 적용한 합성단면포장의 반사균열 저항특성 분석 연구)

  • Suh, Young-Chan;Lee, Yong-Mun;Kim, Jun-Hyung;Cho, Nam-Hyun
    • International Journal of Highway Engineering
    • /
    • v.14 no.2
    • /
    • pp.1-10
    • /
    • 2012
  • As old concrete pavements of over 20years in age are increasing in expressways, the repair and rehabilitation of concrete pavement have become an important issue. Although asphalt overlay is widely used as an alternative to rehabilitate the old concrete pavement, problems due to infiltrated water such as reflection crack and pothole are imposing a very serious threat to its performance. This study proposes waterproof membrane as a solution to minimize the damage due to reflection crack and infiltrated water, and accelerated pavement testing was carried out for the performance comparison of composite pavement with waterproof membrane and ordinary tack coating. The experiment used water spraying to simulate rainfall, and the behavior and moisture resistance characteristics of overlay pavement were analyzed. The experimental result indicated that the strain pattern of waterproof membrane section differed from ordinary tack coating section because waterproof membrane caused the asphalt pavement and concrete pavement to move together. Additionally, since waterproof membrane minimized the infiltration of water and delayed the occurrence of reflection crack by about 70% in comparison to ordinary tack coating method. Moreover, the damage due to infiltrated water also decreased.

Determination of Nonpoint pollutant Unit Loads in Toll-gate of Highway (고속도로 영업소 토지이용에서의 비점오염원 원단위 산정)

  • Son, Hyun-Geun;Lee, Eun-Ju;Lee, So-Young;Kim, Lee-Hyung
    • Journal of Wetlands Research
    • /
    • v.10 no.1
    • /
    • pp.69-75
    • /
    • 2008
  • Toll-gate in highways often received the pollution impact from transportation/vehicular activities. Thus, concentrated pollutants carried by stormwater runoff are directed to nearby streams affecting the water quality and ecosystem. In order to determine the environmental impact on nearby waterbodies and predict the future impact by stormwater runoff, the unit pollutant loads from various landuses are really important. This research was performed to characterize the stormwater runoff and to provide the unit loads from Toll-gate landuses in Korea. The monitoring was conducted at toll gate locating in Gaeryoung City during 2006-2007. The water quality parameters including TSS, COD, DOC, TN, and TP were analyzed and also the flow rates were measured during the monitoring. In this paper, EMCs will be calculated by using the monitored water quality concetraions and flow rates, which will be used to determine the unit pollutant loads from the toll-gate of highway.

  • PDF

Real-Time Pavement Damage Detection Based on Video Analysis and Notification Service (동영상 분석을 통한 실시간 포장 손상 탐지 및 알림 서비스)

  • Park, Juyoung;Lee, Heuisoon;Kang, Kyungtae;Kim, Byung-Hoe
    • KIISE Transactions on Computing Practices
    • /
    • v.24 no.2
    • /
    • pp.59-66
    • /
    • 2018
  • In this paper, we propose a system to detect various damage automatically inflicted on road pavement by collecting and analyzing data from acceleration and camera sensors in real time. The proposed system sends the collected images, acceleration signals, and GPS coordinates to the road manager and the database in the remote server, shortly after detecting the damage to the road pavement. Our study makes three key contributions. The proposed system 1) enables road managers to maintain road conditions quickly, accurately, and conveniently; 2) allows road mangers to take care of various kinds of damage to the road pavement at the initial stage; and finally 3) even makes it possible to track the damage, which suggests that the integration of a high-level decision support function becomes affordable. We tested the sensitivity and precision of the proposed system against real-time data obtained from the vehicles driving on the highway at an average speed of 100 km/h. With ten iterations, the proposed system achieved an average sensitivity of 74% and an average precision of 84% in road pavement damage detection, which is comparable with the best competing schemes.

Estimation for optimum crush depth to prevent reflection crack for Rubblized-PCC in PCC pavements (노후콘크리트포장 원위치 파쇄기층(Rubblized-PCC)의 반사균열 억제를 위한 적정 파쇄 깊이 산정)

  • Lee, Seung-Woo;Chon, Sang-Min
    • International Journal of Highway Engineering
    • /
    • v.6 no.4 s.22
    • /
    • pp.101-108
    • /
    • 2004
  • Asphalt overlay method is a general method to extend the of life old concrete pavements. However, reflection cracks are the typical problem of the AC overlay on distressed concrete pavement. Joint sealing, stress absorbtion layer have been used to prevent reflection cracks however partial success of to delay the timing of reflection cracking was recognized. Reflection crack problem can be eliminated by using rubblization method, which crush concrete pavement slab into piece of aggregate size that can be used base material. Previous research on rubblization method indicated that the size of rubblized PCC ranged 40-70mm at upper layer, and more than 100mm at lower layer. In this study, the adequate depth of rubblized PCC that ran prevent reflection cracking of AC overlay is estimated base on the simulation test of reflection cracking with 0, 10, 20cm rubblized PCC base.

  • PDF