• Title/Summary/Keyword: 계획창정비

Search Result 5, Processing Time 0.017 seconds

Mid-term Requirement of 'Elements of Depot Maintenance' draft (창정비요소 개발 과정정립을 통한 창정비요소개발 발전을 위한 제언)

  • Ahn, Jung-Jun;Kim, Jong-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.638-647
    • /
    • 2018
  • We have to prepare for the existing threats from North Korea and potential threats in the future. It is important to utilize our resources as effectively as possible to build military power that brings victory in a war. Based on a sustainable required operational capability, weapons systems at the acquisition stage need to maintain a combat-readiness posture and ensure operational sustainability. To achieve this, establishment of procedures that develop elements of depot maintenance at the beginning, which enables economical and effective depot maintenance during that stage, is essential. First, the requirement paper needs to develop the concept of the depot maintenance requirement through the pre-study outlined by this paper. Second, at the system development stage, a Development Plan of Depot Maintenance draft should be proposed. This is the initial paper that can develop the elements of depot maintenance, and it should be verified by a field test. Third, each force's logistics command should write a Depot Maintenance Direction draft and a Mid-term Requirement of Elements of Depot Maintenance draft with the proven Development Plan of Depot Maintenance draft. Also, the verified paper needs to be realized and renewed by the time the Requirement of Elements of Depot Maintenance draft is completed. In conclusion, the procedures explained above will contribute to build an economical and effective military power in a reality faced with a resource shortage and threats from the enemy.

Planned Depot Maintenance Interval Decision for Unmanned Aerial Vehicle through Reliability and Maintainability Based Simulation and Operating & Support Cost Analysis (신뢰도 및 정비도 기반 시뮬레이션과 운영유지 비용분석을 통한 무인항공기의 계획창정비 주기결정)

  • Sang Yeob Lee;Jun Hyun Son
    • Journal of Aerospace System Engineering
    • /
    • v.17 no.5
    • /
    • pp.1-10
    • /
    • 2023
  • This research sought to determine the optimal cycle of Planned Depot Maintenance (PDM) for Unmanned Aerial Vehicle (UAV), and PDM through Reliability and Maintainability-based simulation and Operating and Support (O&S) cost analysis using Reliability and Maintainability analysis results. The effectiveness of the PDM was verified economically, and the optimal PDM interval that balances UAV effective operations and sustaining engineering costs was presented.

A Study on the Necessity of Verification about depot level maintenance plan through the Weapons System cases analysis (무기체계 사례 분석을 통한 창정비개발계획안 검증 필요성 연구)

  • Ahn, Jung-Jun;Kim, Su-Dong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.2
    • /
    • pp.76-82
    • /
    • 2019
  • This study has done to search for a solution to remove risk limitedly caused by separating weapon system acquisition from operation and maintenance at the view point of Logistic Commander who's responsible for stable operation and maintenance after acquiring weapon system. At the System development stage, unverified overhaul development plan may cause additional manpower and costs after the development, and furthermore it is likely to have risk to lower reliability of the military. Thus, research and development agency should write overhaul development plan at the System development stage, and it should be verified through evaluation and verification test. Secondly, during research and development, institutional supplementation is needed to calculate human and material resources writing overhaul development plan. Thirdly, it should be able to analyze proper operation & maintenance plan and cost for overhaul plan at the pre-investigation stage. Fourthly, the base which can develop overhaul concept and overhaul factors should be included in the need and need determination document. Lastly, for the weapon system which has small amount of high power figure, project management should be performed to be able to specify at the each acquisition level of weapon system to realize Article 28, clause 3 and 4 of Defense business law.

프랑스식 잠수함 전력 건설

  • Jo, Deok-Un
    • Defense and Technology
    • /
    • no.10 s.128
    • /
    • pp.34-41
    • /
    • 1989
  • 프랑스가 제안하는 효율적인 기술이전계획은 점진적인 과정이다. 시작단계에서는 프랑스에서 제공하는 잠수함의 정비유지에만 제한 적용되며, 정비 엔지니어와 기술자들이 계획된 방법으로 잠수함의 개념과 기술에 관한 지식을 획득할수 있을 것이다. 목표는 현지 조선소가 잠수함의 창정비(overhaul)를 능숙히 수행할 수 있도록 하는 것이다. 또한 기술이전은 자국내 잠수함 건조의 경우 3단계에 걸쳐 수행된다(p.39 참조)

  • PDF

An Approach to Maintenance Cost Estimation for Aircraft Turbofan Engines (항공기용 터보팬 엔진의 성능변수를 이용한 정비 주기 및 비용 예측에 관한 연구)

  • Kang, Myoung-Cheol;Ogaji, Stephen;Pilidis, Pericles;Kong, Chang-Duk
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.257-262
    • /
    • 2008
  • This study presents a detailed analysis of aircraft engine maintenance cost based on the relationships between engine performance and geometric parameters. Some trend equations based on the engine performance and maintenance database were developed for the estimation of shop-visit interval, work-scope, man-hours, material cost and Life Limited Part cost. The results show that this approach can give a more reasonable and detailed estimation of engine maintenance cost than older empirical methods.

  • PDF