Korean Journal of Construction Engineering and Management
/
v.13
no.1
/
pp.67-76
/
2012
There are index adjustment method and item adjustment method in estimation methods for price fluctuation rate of public constructions. A relevant regulation has put item adjustment method as a principle, but in most construction, contract sum adjustment has been made by index adjustment method. Hence, this study, by figuring out width and causes of the gap between index adjustment method and item adjustment method through direct comparative analysis, solved inequality caused by difference between them and suggested a rational way against irrationality of each method. For building operations of public housing construction, a detailed fluctuation rate by index adjustment method and item adjustment method of construction cost elements of the same construction, that is, direct material cost, direct labor cost and historical construction cost was estimated to analyze difference between two adjustments and establish its cause. Across the analysis, it was found that fluctuation rate by item adjustment method was estimated lower than that by index adjustment method and difference between methods for estimating fluctuation rate of quotation unit price and application of index unrelated to construction type and construction nature are main causes of the difference. This study has a significance in that, for smooth contract sum adjustment between contracting parties, it practically proved the real difference between adjustment methods by conducting comparative analysis of the difference in direct correspondence way.
Proceedings of the Korean Institute of Building Construction Conference
/
2005.11a
/
pp.117-120
/
2005
The business market of architecture has got a system that controls a deposit according to the price function. This system is written on a law of contract about countries. So the main body of construction has to make a reasonable contract. This study is written about a rate of numerical index on controling a deposit. We tried to fine problems and solutions of labor expenses, instrument costs and material costs which is so big and changable on the construction market Labor expenses are expressed according to the rate of construction scale between direct and indirect cost that applies ability of works. Instrument costs are expressed according to an output method of a unit price annually and a weight allowance of local instrument conditions and use frequence. The last material costs expressed according to a local weight allowance make a decision of the material cost index. They applies locally relative index more than absolute one on what uses the price rate of producers and importations. This solutions are not enough to apply to the real market, so it needs to exam and to be on the market after a feasibility study.
정부계약의 원가계산에 의한 예정가격 작성 및 물가변동으로 인한 계약금액 조정 시 반영되는 시중노임단가는 전국 2,000여개 건설현장을 대상으로 전체 건설직종 종사자들에게 실제 지급된 임금을 조사해 분석 산정한 것으로, 매년 상 하반기 1월 1일과 9월 1일에 대한건설협회 주관으로 공표되고 있다. 직종별 건설업 노임단가는 대한설비건설협회 홈페이지(www.kmcca.or.kr) ${\rightarrow}$ 공개자료실 ${\rightarrow}$ <건설업임금실태조사 공표>안내에서 다운로드 받을 수 있다. 본지는 회원사들이 궁금해 하는 임금실태조사부터 시중노임단가 발표까지의 전반적인 현황을 살펴본다.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.359-364
/
2003
The loss of potential opportunity profit which is consisting in the partial markups of the corporation would taking placed in related with the time-delay deeply, has customarily disregarded in contract adjustment under the principles of denial of cost accounting method, declined conjecture in the point of benefits and protection of the law in scope of compensation and the restricted conditions of constant contract. It is being resulted from that the policies of the general principles of accounting standards which is subjected to ask an objective data and evidence, and the denial system as a debt derived from imperfect legal theory applied by current law. Therefore, it is necessitated to find if any irrationality in the positive system is and further to draw an improved reasonable measures to adopt by review of constant system preparing tile reasonableness with the method of suitable quantification devices provided that any time-delay is induced by the party.
공정거래위원회(위원장 김동수)가 하도급거래에서 서면발급 및 보존관행을 정착시키기 위해 "바람직한 서면발급 및 보존에 관한 가이드라인"을 제정해 1월 1일부터 시행에 들어갔다. 가이드라인에는 ${\bigtriangleup}$하도급계약서(추가 변경계약서 포함) ${\bigtriangleup}$하도급계약 확인서면 ${\bigtriangleup}$목적물 등 수령증명서 ${\bigtriangleup}$검사결과 통지서 ${\bigtriangleup}$감액서면 ${\bigtriangleup}$기술자료 제공 요구서 ${\bigtriangleup}$계약변경 내역 통지서 등 7건은 의무발급을, ${\bigtriangleup}$목적물 등의 검사결과 및 검사 종료일 ${\bigtriangleup}$하도급대금의 지급일 지급금액 및 지급수단 ${\bigtriangleup}$설계 변경 등에 따라 하도급대금을 조정했을 때 사유 ${\bigtriangleup}$원재료 등의 가격변동 등에 따라 수급사업자가 하도급 대금 조정을 신청한 경우 협의내용 및 조정사유 등 7건은 보존 서면으로 명시했다. 이번 가이드라인은 동반성장협약 평가 항목에도 반영될 예정이다. 또한 공정거래위원회는 하도급법상 서면발급 또는 보존의무를 위반해 경고조치를 받을 때에는 교육이수를 권고하는 한편, 서면 미발급 등 혐의가 반복될 때에는 최고경영자(CEO)가 교육(3개월에 3시간)을 이수토록 규정했다. 특히 서면실태조사에서 서면 미발급 미보존 혐의가 장기간 상습적으로 이뤄졌다는 사실이 확인되면 직권조사를 거쳐 엄중할 방침이다.
Korea Mechanical Construction Contractors Association
월간 기계설비
/
no.11
s.208
/
pp.41-52
/
2007
행정자치부가 지난 9월 20일 지방계약법 시행령 개정안을 공포하고 이날부터 시행에 들어갔다. 개정된 시행령은 당초 행자부가 분리발주를 억제하기 위하여 지방계약법 제77조를 개정하여 '공사의 분할 및 분리발주 시에는 행정자치부 장관 등 상급기관에 보고'토록 입법예고 되었으나, 우리협회는 분리발주 활성화를 위하여 '기계설비공사 분리발주 근거 조항인 단서3호는 제외'토록 추진함에 따라 우리 협회의 의견이 반영된 시행령이 개정되었다. 또한 하도급관리계획을 불이행한 원도급업체는 앞으로 부정당업자로 제재받아 입찰참가자격이 최소 1개월에서 최고 6개월 미만까지 제한된다. 이밖에 물가변동과 관련하여 단품슬라이딩제를 도입해 특정자재의 가격이 15% 이상 등락할 경우 계약금액을 조정할 수 있게 했다. 이중 지방계약법 시행령 제 77조 개정 내용의 의의 및 우리 설비건설업과 신.구조문 대비표는 다음과 같다.
Korean Journal of Construction Engineering and Management
/
v.6
no.3
s.25
/
pp.81-89
/
2005
Delay schedule coming about duration extension is happening essentially because public construction project consist of many sub contractor. The method which can calculate delay day is suggested by many studies in case of happing delay schedule, but It is difficult to apply to real construction project because there is no mention about the control of The law of contract according to delay schedule. The law of Contract which is cost of account has more uncertain problem than FIDIC condition of contract. This study suggests method which can make extension of duration procedure clear in case of happing the reason of design change related with activity duration during carrying on construction, and a submission process of the reason of duration extension and modify schedule making way about section which is basis of calculating contract amount clear.
Korean Journal of Construction Engineering and Management
/
v.5
no.6
s.22
/
pp.203-211
/
2004
This study is the results to survey on the problems and improvable Policies for current escalation system in construction contracts, through a Delphi survey to experts. From the survey results, it is desirable to decide the fluctuation rate of construction cost, which is the requirement of escalation clause, on the basis of inflation rate or construction cost index. The desirable price fluctuation rate is proposed as a $3\%$ level. However, it is difficult for construction companies to cope with the sudden increase of material price in advance, arising from short-term shock factors such as exchange rate and international raw material's price. Accordingly escalation system for specified materials, as an exceptional mode, should be introduced. As a method to calculate the fluctuation rate, ARCA(adjustment rate for the categories of articles) is more desirable than ARI(adjustment rate for an index), because the ARCA can be more reflected the characteristics of each construction work.To rationalize the ARI method, it is needed to announce the wage index, material index and machinery expense index via detailed classification by construction types. Also, it is desirable to prescribe the bidding date as a starting date of the price change, rather than contact signing date. considering the price change can happen since the biddiilg stage.
Park Keun-Hyung;Kim Jeong-Jae;Choi Jea-Won;Kim Yong-Su
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.340-343
/
2004
The purposes of this study is to survey unfair aspect of specific provisions in the construction contract. The research method of this stud)'includes judicial precedents and a questionnaier survey. The result of thus study are as follows: 1) unfair payment condition gives increase to faulty construction. 2) shift of the responsibility gives increase to delay, 3) adjusted contract sum gives increase inappropriate compensation to contractor.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.