• Title/Summary/Keyword: 계류선박의 동요

Search Result 33, Processing Time 0.025 seconds

A Study on Analysis of Moored Ship Motion Considering Harbor Resonance (항만공진현상을 고려한 계류선박의 동요 해석에 관한 연구)

  • Kwak, Moon Su;Moon, Yong Ho;Pyun, Chong Kun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.595-608
    • /
    • 2013
  • This paper is proposed the computation method of moored ship motion considering harbor resonance, and estimated that the harbor resonance have an effect on moored ship motion. The computation of harbor resonance was used CGWAVE model and the computation of moored sip motion was used the Green function method expressed by three dimensions. This method was verified with the field observation data of moored ship motion, and the application of actual harbor was investigated with wave field data and down time record data in Pohang New Harbor. The resonance periods in Pohang New Harbor that obtained from wave field data were 80, 33, 23, 8 minute, which are the long waves, and 42, 54, 60 second, which are the infra-gravity waves inside harbor slip. The simulated results of harbor resonance were corresponded with the wave field data. This study was investigated on 5,000 ton, 10,000 ton and 30,000 ton ship sized in Pier 8 of Pohang New Harbor that the harbor resonance has effect on moored ship motion from simulated results of ship motion in case of included resonance and excluded resonance. In case of included resonance, the ship motion have increased by 12~400 percent when compared with results of excluded resonance. We could find that the harbor resonance have still more an effect on the surge and heave motions of a large size ship and the roll and yaw motions of a small size ship.

A Time Domain Analysis of Moored Ship Motions with Resonant Period of a Tsunami (쓰나미의 공진주기파를 고려한 항내 계류선박의 시계열 해석)

  • Cho Ik-Soon;Lee Yun-Sok;Lee Choong-Ro
    • Journal of Navigation and Port Research
    • /
    • v.30 no.6 s.112
    • /
    • pp.433-438
    • /
    • 2006
  • Recently, the earth scale disaster is occurring frequently. Under the effects of global warming, the weather has become unseasonable worldwide. Hence, the earth is experiencing unstable condition with many disasters such as storms and flood damages as well as earthquake. Therefore, it is necessary to consider what we am do to prevent disasters. Consequently, recent warnings indicate that there is a potential risk of massive earthquakes. Consideration of the effects of tsunami to the moored ship is very important. Operational problems such as moored ship motions sometimes become remarkable with large amplitude and long periods in harbor. Moored ship motions may cause the breakage of mooring systems such as mooring lines, fenders or quay. Large and long period moored ship motions are caused by resonant effects. In this paper, the moored ship motions within a harbor by the large-scale tsunami and the effects on the motions and mooring loads with resonant effects are investigated by numerical simulations.

Estimation of Harbor Operating Ratio Based on Moored Ship Motion (계류선박의 동요에 기초한 항만가동률 산정)

  • Kwak, Moonsu;Chung, Jaewan;Ahn, Sungphil;Pyun, Chongkun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.6B
    • /
    • pp.651-660
    • /
    • 2006
  • Although a harbor may be constructed with calmness in harbor in mind, which satisfies the design standard, it is frequently reported that the motion of moored ships disrupt the cargo handling. This is because of current design standard, which only deals with the wave height in the decision making process of cargo handling, and, now, a new kind of estimation method of operating ratio for calmness based on the motion of moored ship is in need. In this research, a computational method that analyses the harbor operation rate in harbor was put forward by considering the relation of allowable quantity of motion for cargo handling and the computation of the motion of moored ship at wharf by using moored ship motion analysis model. Here, a new estimetion method was applied at Onsan harbor, and it was compared with the current estimation method, and, then, the difference between the two methods was showed. The harbor operating ratio gained by a new method was dropped by 2~11% at ENE and NE directions when it was compared with the operating ratio based on the current design standard. However, when a harbor structure layout is to be designed, a harbor operating ratio test according to the wave height and a harbor operation rate test, which considers the motion of moored ship, are to be run side by side at a harbor designing process.

A Study on Dynamic Analysis of Moored Ship Motions by Tsunami (쓰나미에 의한 계류 선박의 동적 동요 해석에 관한 연구)

  • Cho Ik-Soon
    • Journal of Navigation and Port Research
    • /
    • v.29 no.8 s.104
    • /
    • pp.661-666
    • /
    • 2005
  • Recent warnings indicate that there is a potential risk of massive earthquake. These earthquakes could produce large-scale tsunamis. Consideration of the effect of Tsunami to the moored ship is very important bemuse it brings the loss of life and vast property damage in a viewpoint of ship operations within a harbor. If a tsunami occurs, a ship in a harbor may begin drifting in case of ship entering and departing harbor, and breakage of mooring rope and drifting of moored ship are happened. And extremely serious accident, such as stranding and collision to a quay, might occur. On the other hand, since the tsunami consists of approximately component waves of several minutes, there is a possibility of resonance with the long period motion of mooring vessel. As the speed of Tsunami is much faster than tidal current in a harbor, a strong resisting force might act on the moored ships. In this paper, the numerical simulation procedure in the matter of ship motions due to the attack of large-scale tsunamis are investigated and the effects on the ship motions and mooring loads are evaluated by numerical simulation.

Wave Responses and Ship Motions in a Harbor Excited by Long Waves(I) (항만내 파도응답과 계류선박의 운동해석(I))

  • I.H. Cho;Hang-S. Choi
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.29 no.2
    • /
    • pp.38-47
    • /
    • 1992
  • The motion response of a ship moored in a rectangular harbor excited by long waves has been studied theoretically and experimentally. Within the framework of potential theory, matched asymptotic expansion techniques are exployed to analyze the problem. The fluid domain is divided into the ocean and the harbor regions for the analysis of wave response in a harbor without ship. The wave responses in both the ocean and the harbor sides are solved first independently in terms of Green's functions, which are the solutions of the Helmholtz equation satisfying appropriate boundary conditions. Slender body approximations are used to obtain the velocity jumps across the ship, which are associated with the symmetric motion modes of the ship. Unknowns contained in each solution are finally determined by matching at an intermediate zone between two neighboring regions. Theoretical results predict the ship motion qualitatively well. The main source of quantitative discrepancies is presumably due to real fluid effects such as separation at the harbor entrance and friction on harbor boundaries.

  • PDF

A Time Domain Analysis of Moored Ship Motions Considering Tsunami Resonant Effects (쓰나미의 공진현상을 고려한 항내계류선박의 시계열 해석)

  • Cho Ik-Soon;Kong Gil-Young;Lee Yun-Sok
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2006.06b
    • /
    • pp.191-197
    • /
    • 2006
  • Recently, the earth scale disaster is occurring frequently. Under the effects of global warming, the weather has become unseasonable worldwide. Hence, the earth is experiencing unstable condition with many disasters such as storms and flood damages as well as earthquake. Therefore, it is necessary to consider what we can do to prevent disasters. A disaster like earthquake will inevitably occur in view of the probabilities. The active period of earthquakes and the inactive periods repeat alternatively. Consequently, recent warnings indicate that there is a potential risk of massive earthquakes. Consideration of the effects of tsunami to the moored ship is very important. Operational problems such as moored ship motions sometimes become remarkable with large amplitude and long periods in harbor. Moored ship motions may cause the breakage of mooring systems such as mooring lines, fenders or quay. Large and long period moored ship motions are caused by resonant effects. In this paper, the moored ship motions within a harbor by the large-scale tsunami and the effects on the motions and mooring loads with resonant effects are investigated by numerical simulations.

  • PDF

Study on the Roll Motion of Moored Ships Using Marine Traffic Characteristics (해상교통특성과 계류중인 선박의 Roll 동요량에 관한 연구)

  • Kwon, Yu-Min;Lee, Jin-Suk;Lee, Hong-Hoon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.27 no.1
    • /
    • pp.74-80
    • /
    • 2021
  • When a berth is built close to a fairway, a moored vessel will be affected by the ship waves generated by navigating vessels. In this study, a portable measurement system was developed to measure the roll motion of an actual vessel, and the results were compared with simulation results. The simulation results showed that the roll motion satisfies the loading safety criteria. However, the actual results of the vessel, did not satisfy the criteria in some cases. In this study, 18 cases that did not satisfy the loading safety criteria were analyzed. Among these cases, three cases were affected by a different time zone of the remaining 15 cases, 11 cases (73.3%) were observed to be consistent with arrival times of passenger ships of more than 10,000GT sailing between in Mokpo and Jeju. The results of this study can be used to reflect marine traffic characteristics in the assessment of loading safety, which can increase the reliability of results of the loading safety assessment of ships.

Evaluation of Effective Working Days in a Harbor Considering Harbor Resonance and Moored Ship Motion (항만공진주기와 선박동요량을 고려한 항만가동율 산정)

  • Kwak, Moonsu;Moon, Yongho
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.27 no.1
    • /
    • pp.14-24
    • /
    • 2015
  • This study proposed an estimation method of allowable wave height for loading and unloading of the ship and evaluation of effective working days considering moored ship motion that is affected by sip sizes, mooring conditions, wave periods and directions. The method was examined validity by comparison with wave field data at pier $8^{th}$ in Pohang New Harbor. The wave field data obtained with wave height of 0.10~0.75 m and wave period of 7~13 s in ship sizes of 800~35,000 ton when a downtimes have occurred. On the other hand, the results of allowable wave height for loading and unloading of the ship in this method have obtained with wave heights of 0.19~0.50 m and wave periods of 8~12 s for ship sizes of 5,000, 10,000 and 30,000 ton. Thus this method well reproduced the field data respond to various a ship sizes and wave periods. And the results of this in Korea are didn't respond to various the ship sizes and wave periods, and we h method tended to decrease in 16~62 percent when have considered long wave, and it is decreased in 0~46 percent when didn't consider long wave than design standards in case of the ship sizes of 5,000~30,000 ton, wave period of 12 s and wave angle of $75^{\circ}$. The allowable wave heights for loading and unloading of the ship proposed by design standards in Korea have found that overestimated on smaller than 10,000 ton. On the other hand, the rate of effective working days considering ship motion at pier $8^{th}$ in Pohang New Harbor reduced in 6.5 percent when compare with the results without considering ship motion.

A Study on Estimation of Allowable Wave Height for Loading and Unloading of the Ship Considering Ship Motion (계류선박의 동요량을 고려한 하역한계파고 산정 방법에 관한 연구)

  • Kwak, Moon Su;Moon, Yong Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.873-883
    • /
    • 2014
  • This study proposed an estimation method of allowable wave height for loading and unloading of the ship considering ship motion that is affected by ship sizes, mooring conditions, wave periods and directions. The method was examined validity by comparison with wave field data at pier $8^{th}$ in Pohang new harbor. The wave field data obtained with wave height of 0.10~0.75m and wave period of 7~13s in ship sizes of 800~35,000ton when a downtimes have occurred. On the other hand, the results of allowable wave height for loading and unloading of the ship in this method have obtained with wave heights of 0.19~0.50m and wave periods of 8~12s for ship sizes of 5,000, 10,000 and 30,000ton. Thus this method well reproduced the field data respond to various a ship sizes and wave periods. And the results of this method tended to decrease in 16~62% when have considered long wave, and it is decreased in 0~46% when didn't consider long wave than design standards in case of the ship sizes of 5,000~30,000ton, wave period of 12s and wave angle of $75^{\circ}C$. The allowable wave heights for loading and unloading of the ship proposed by design standards are didn't respond to various the ship sizes and wave periods, and we have found that the design standards has overestimated on smaller than 10,000ton.