• Title/Summary/Keyword: 경제적타당성

Search Result 808, Processing Time 0.036 seconds

The Economic Feasibility Analysis of A Children's Library Construction: The Case of C Innovation City (어린이도서관 건립의 경제적 타당성 분석 - C혁신도시 사례를 중심으로 -)

  • Chang, Durk Hyun;Koo, Bon Jin
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.52 no.2
    • /
    • pp.125-142
    • /
    • 2018
  • Local innovation cities that have recently been being constructed have a large share of the population with highly educated young family with children. There are high demand for children's libraries because of this high percentage of children in the population. In this regard, this study analyzed the economic feasibility of establishing a new children's library in an innovation city as viewed through the case of the C innovation city, where population inflows are increasing recently. In this study, based on a survey, we conducted a cost benefit analysis, as estimating the cost of constructing the library and calculating the benefits from the construction. The economic feasibility was analyzed by calculating the benefit cost ratio, net present value, and internal rate of return.

Evaluation Methods of Sociality in the Decision Making Process for Dam Construction (공공사업(댐)의 의사결정시 사회성 평가 방법)

  • Kim, Woo-Ku;Kim, Tea-Young;Lee, Gwang-Man
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.657-662
    • /
    • 2006
  • 공공사업의 목적은 사업을 통해서 발생하는 혜택을 인간 및 사회가치 적합하도록 최대한 확산하고자 하는 것이다. 그럼에도 불구하고 당해 사회적 가치를 고려하지 않는 경제 및 정책 범주에서만의 분석은 공공사업의 추진타당성에 신뢰저하를 가져오거나 사업추진지역사회의 막연한 불안감(저항)에 효과적으로 대응하지 못하는 문제를 일으키고 있다. 따라서 타당성 있는 사업추진 및 지역사회 저항을 극복할 수 있는 방법발견은 중요하다고 하겠다. 해결방향은 공공사업으로 영향 받는 당해지역에서의 경제(정책포함)외적인 제약조건까지 파악하여서 전반적인 사회경제적가치(시장가치)를 재발견해 가는데 있다. 그것은 공공사업의 예비타당성 평가시에 잠재적으로 부딪힐 저항이나, 개발이후에 발생할 수 있는 확산가치까지도 대상에 포함시켜야 한다는 의미이다. 주지하는 바와 같이 잠재적 가치는 경제적 요소에서만 발생하기 보다는 당해지역의 사회문화적 잠재성 극대화에서 나온다. 지금까지의 계획수립과정은 정부와 전문가집단이 중심이 되어 계획을 수립하고 작성된 계획안에 대해 시민단체, 환경단체 등 이해당사자들이 공청회나 공람을 통해 의견을 제시하는 소극적 프로세스였다. 한편, 대안적 프로세스는 계획수립의 초기단계부터 다양한 이해당사자를 참여시키고 이들을 보조자가 아닌 계획수립의 주체로서 인정하고 협의와 조정과정을 거쳐 합의를 도출함으로써 계획의 정당성을 확보하고 실행가능성을 높이는 방식이 유용할 것으로 사료된다. 본 연구는 미래지향적 가치를 포괄하고 있는 예비적인 사회적 타당성의 평가항목 및 방법을 제시하고자 한다. 이것은 일반적으로 사회영향평가(SIA: Social Impact Assesment)모델을 통해서 공공사업 및 민간사업이 당해 사회에 미치는 영향을 파악하고, 이의 대응방안 마련에 초점을 맞추고 있다. 주요 내용은 공공사업관리방식의 체계를 파악하고 공공사업의 사회적 타당성 및 국내외 적용사례 분석을 통한 시사점 도출과 사회성 검토항목 및 평가방법을 제시한 후, 우리나라에의 적용방안을 검토하였다.

  • PDF

Assessing an Economic Feasibility of Coastal Marine Ranching Project in Uluengdo (울릉도 연안바다목장사업의 경제적 타당성분석)

  • Pyo, Heedong
    • Journal of Korea Port Economic Association
    • /
    • v.37 no.1
    • /
    • pp.1-18
    • /
    • 2021
  • A coastal marine ranching project in Uleungdo had been conducted for 5 years from 2013 to 2017 with investment costs of 5 billion won, for the special purpose of the deployment of artificial reefs, the release of young fishes. The paper focuses on an ex-post analysis of the economic feasibility for the project after completing the project, which is apart from a preliminary viability. For economic analysis, the economic benefits are derived from direct benefits including increasing effects of fisheries income and saving effects of harvesting costs, and indirect benefits including increasing effects of recreational fishing and preservation effects of coastal marine ecosystems while economic costs include releasing and purchasing costs of artificial reef and juvenile fish, R&D costs, maintenance costs and harvesting costs. The result shows that the project should not be accepted according to NPV=-0.125 billion won, IRR=4.5% and B/C ratio=0.98 under Scenario 1 which considers direct benefits and indirect benefits excluding the preservation values, while the project should be accepted under Scenario 2 indicating NPV=30.9 billion won, IRR=11.3% and B/C ratio=1.49 which considers the direct benefits as well as the indirect ones including the preservation values, based on 4.5% of the social rate of discount.

Economic Feasibility Analysis for Introducing Integrated Management System for Supporting Underground Construction (지하구조물건설 현장지원 통합관리시스템 도입을 위한 경제적 타당성 분석)

  • Baek, Hyeon Gi;Jang, Yong Gu;Seo, Jong Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.5D
    • /
    • pp.513-522
    • /
    • 2010
  • Underground construction for traffic networks, complexes, and storage facilities has risen as an effective land use plan for dealing with emerging problems such as overcrowded urban cities and traffic jams. This paper performed an economic feasibility analysis of the development of the integrated field management system which provides field workers and managers with 3D-based location tracking and clear communication during underground construction works. To conduct the analysis, processes and problems of field management for underground construction were analyzed and deduction in accidents and field management costs and productivity improvement were estimated as expected benefits. Based on computed benefits and costs, an economic analysis was conducted using Benefit/Cost ratio(B/C), Net Present Value(NPV), and Internal Rate of Return(IRR) and then sensitivity analysis was performed to cope with the uncertainty of assumed variables.

A study on Applying Hyperbolic Social Discount Rate onto the Benefit-Cost Analysis: Focused on Appropriate Analytical Time Span (쌍곡선함수 방식의 사회적할인율 적용에 대한 연구: 적정 분석기간의 설정을 중심으로)

  • Kim, Sang Kyum
    • Environmental and Resource Economics Review
    • /
    • v.24 no.1
    • /
    • pp.85-107
    • /
    • 2015
  • This study analyzes the effect of applying hyperbolic social discount rate onto the results of benefit-cost analysis of environmental public investment projects in Korea. In order to check the application possibility to the actual feasibility study, the discount factors generated by hyperbolic function, rather than traditional exponential one, would be applied to the benefit and cost data from the pre-feasibility studies which peformed for environmental public investment projects. The results of this study shows that using hyperbolic social discount rate is effective for enhancing test results, only under the condition of which the full expansion of the time periods of analysis is satisfied. According to the simulation results of this study, to achieve higher benefit/cost ratio by using hyperbolic social discount rate, the period should be increased up to 120 to 150 years at least.

A Study for the validity analytic Model of U-City Management Center (UMC의 타당성 평가 모델에 대한 연구)

  • Kim, Byung-Sun;Suh, Chang-Jin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2010.11a
    • /
    • pp.1462-1464
    • /
    • 2010
  • U-City는 도시에 IT를 접목하여 도시의 운영과 관리를 효율화하고 다양한 서비스의 도입을 통해 주민들의 복지 향상을 목적으로 하는 신개념의 도시이다. UMC(U-City Management Center)는 U-City의 핵심요소로 U-City의 각종 서비스의 관리 운영을 통제하고, 새로운 부가가치를 생성하는 역할을 한다. 하지만 정보화 사업을 타당성 분석없이 진행하는 경우 전반적인 재정의 운영이라는 정책적인 측면에서 문제가 발생할 소지가 크다. 따라서 UMC 타당성 분석이 선행되어야 한다. 본 논문에서는 정보화사업의 타당성 분석을 위한 선행연구들을 분석하고, UMC의 타당성 분석을 위하여 AHP 모델을 적용하였다. 또한 도출된 모델을 이용하여 구축중인 UMC의 타당성을 분석하였으며, 분석 결과 기술적 타당성, 경제적 타당성, 정책적 타당성 중 기술적 타당성이 가장 낮은 것으로 평가되어 향후 기술적 문제를 보완해야함을 도출하였다.

Development of an Automated Pavement Crack Sealing Machine and Its Economic Feasibility Analysis (크랙실링 자동화 장비의 개발 린 경제적 타당성 분석)

  • Lee, Jeong-Ho;Lee, Jun-Bok;Jeong, Hyung-Hoon;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.151-164
    • /
    • 2006
  • Numerous efforts are currently underway to automate pavementcrack and joint sealing activities. Productivity improvements, improved safety and quality, and reduced road user costs motivate these developments. Recently, an automated pavement crack sealing machine has been developed to automate the process of sealing pavement cracks and joints in Korea. This paper mainly describes the results of the economic feasibility analysis revealed through its overall performance evaluation and field tests. Finally, it is concluded that the automated machine exceeds the performance in terms of productivity, safety, and quality required in conventional method, thus making the machine economically feasible.

A study of revaluation for wind power systems in Saemangeum demonstration site (새만금 풍력발전 시범단지의 경제성 평가 재검토 연구)

  • Lee, Yoo-Na;Shin, Hee-Young
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2012.03a
    • /
    • pp.370-375
    • /
    • 2012
  • 국가개발연구원(KDI)에서는 새만금에 40MW 용량의 국산 풍력발전단지 조성을 위한 예비타당성 조사를 실시하였다. 본 사업에 대한 KDI의 비용편익 분석 결과 순 현재가치가 0보다 작고, B/C 비율은 0.73으로 경제적 타당성이 나타나지 않았다. 하지만 모든 비용과 편익을 화폐가치로 환산해 내는 비용편익분석은 여러 가지 외부효과로 인해 사업의 타당성 연구자들에 의해 주관적인 결과물이 나오기도 한다. 이에 따라 본 논문에서는 새만금 풍력발전 시범단지의 경제성 평가 재검토 연구를 실시하였다. 본 논문에서는 기존 경제성 평가 항목에 대하여 여러 가지 쟁점을 제시하고, 그 중에서 대기오염물질 저감 비용과 학습효과(learning effect)로 인한 비용 절감 편익을 추가적으로 산정하였다. 여기서 학습효과의 학습속도(learning rate) 를 세 가지 시나리오로 나누어 분석하였다. 두 가지의 추가 편익을 KDI의 기존 예비타당성 조사 분석에 추가한 순 현재가치는 상당한 양의 값이 나왔고, B/C 비율은 8.8 로 편익이 비용에 비해 크게 증가했다. 이러한 항목들의 포함 여부에 따라 타당성 결과가 현저하게 달라짐을 알 수 있다. 향 후 비용편익 분석이 정책 결정에 적절히 반영되기 위해서는 외부효과를 고려한 환경 비용, 그리고 학습효과와 같은 추가적인 사항들이 면밀히 검토되어야 한다. 시장에 기반하지 않은 이러한 외부효과로 인한 항목들은 대상과 시기에 따라 매우 다른 결과를 보여주기에 이에 대한 세부적인 연구가 필요한 시점이다.

  • PDF

Feasibility Study on Apartment Building Type-Factory Business Incubator at University in Busan (부산지역 대학교내의 아파트형공장 방식 창업보육센터 건립 타당성 연구)

  • Kim, Soo-Yong;Kim, Hoi-Sup;Jo, A-Ra;Park, Young-Min
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.563-567
    • /
    • 2008
  • Recently, the Busan Economy has been depressed because of the constant economic slowdown. This also causes severe damage to the construction industry. This study focuses on The Apartment Building Type-Factory Business Incubator in the university paying attention to the construction company who struggles to make a new item of business in this aggravated state of the building business. There are no universities who operate The Apartment Building Type-Factory Business Incubator until now and there are no related data or researches at all. With this in mind, this study is to perform a feasibility study on inducement of The Apartment Building Type-Factory Business Incubator in the University in Busan area. In consequence, feasibility of Policy was sufficient and this study could draw a result of stable returns. Through this business, this study expects that schools, construction companies and enterprises who want to start a business can get the synergy among each other.

  • PDF

Economic Feasibility Analysis of Developing Marine Environmental Risk Assessment and Management Technology (해양환경 위해성 평가 및 관리 기술개발사업의 경제성 분석)

  • Park, Sun-Young;Nam, Jung-Ho;Yoo, Seung-Hoon
    • Journal of Korea Technology Innovation Society
    • /
    • v.16 no.1
    • /
    • pp.20-40
    • /
    • 2013
  • A project of developing marine environmental risk assesment and management technology was proposed to improve the level of marine environmental management research. This paper attempts to measure the non-market benefits of the project. To this end, the dichotomous choice contingent valuation method is used. In particular, recently proposed one and one-half bounded model is applied. The model can reduce the potential for response bias comparing to the double bounded model while maintaining much of its efficiency. Moreover, in order to deal with zero WTP observations, a spike model is adjusted for our data. A survey of randomly selected 600 households was implemented and the respondents were asked in person-to-person interviews about how they would be willing to pay for implementing the project. Respondents overall accepted the contingent market and were willing to contribute a significant amount (2,663 won), on average, per household per year. The aggregate value of the project in the nation amounts to approximately 46.3 billion won per year. The figure 2.16 of cost-benefit ratio shows that economic validity of this technical development.

  • PDF