• Title/Summary/Keyword: 경암

Search Result 90, Processing Time 0.018 seconds

A Case Study on Penetrating Hard Rock with Alternative Methods of Shield TBM for Weathered Layer in Subway Construction (지하철공사에서 풍화대용 쉴드 TBM의 경암 구간 굴진 시 대체공법에 대한 사례연구)

  • Park, Hyung-Keun;Ko, Won Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.623-629
    • /
    • 2010
  • Recently, the Shield TBM (Tunnel Boring Machine) construction method is used gradually to increase at the Tunnel Constructin site. However the design and application of the Shield TBM were carried out without sufficient investigation of the ground conditions in the construction site. Due to insufficient understanding to the corresponding equipment is frequently occurring unexpected construction cost and extension of a construction period. The most suitable alternative construction method was determined by analyzing tunneling rate, duration, construction cost of shield machine and tunneling data of alternative method. The result of the case study is suggested as follows. First, the accurate soil exploration on the construction site should be preceded to prevent from tunneling stoppage and schedule delay. Second, the most suitable selection of the shield machine to the ground conditions of the construction site should be executed based on the investigation. Third, the best alternative method for boring of hard rock section is 'hard rock blasting after open cut and cover method'.

초기계측치를 이용한 경암 지반내 터널의 최종변위량 예측

  • 송승곤;양형식;임성식;정소걸
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2002.03a
    • /
    • pp.37-44
    • /
    • 2002
  • 터널의 초기 변형결과를 역해석에 적용하기 위하여 초기 값들과 최종변위의 상관관계를 연구하였다 Panet의 지수함수와 분수함수는 경암 터널의 내공변위 예측에 잘 맞았다. ID지점의 초기 계측변위는 선형적으로 적합시킬 수 있으나 계측 전 변형의 추정식으로는 부적합하였다. 초기 계측 결과들과 최종 변형결과는 선형적인 비례관계를 보였으며 이로써 초기 계측결과로부터 추정한 최종변형치를 이용한 역해석이 가능함을 보였다.

  • PDF

Estimation of Final Deformation of Hard Rock Tunnel Using Early Measured Deformation (초기계측치를 이용한 경암 지반내 터널의 최총변위량 예측)

  • 송승곤;양형식;임성식;정소걸
    • Tunnel and Underground Space
    • /
    • v.12 no.2
    • /
    • pp.99-106
    • /
    • 2002
  • To use the early measured data of tunnel deformation in but analysis, the relationship between these values find final deformation data were studied. Panet\`s exponential and fraction equations successfully approximate the convergence of the hard rock tunnels. Measured deformation data of ID location, $U_{1D}$ show that they can be lilted to linear equations but should not be used to estimate potential deformation before measurement, $C_{0}$. Early measured data $U_{1D}$ $U_{2D}$ , and final deformation $ U_{L}$ showed linear correlations. It proved that estimated data of final deformation from early measured ones can be used as input parameters for back analysis.

A Case Study on the Application of Low Vibration Blasting Method (미진동 발파공법 적용사례에 관한 연구)

  • 박주연;이천식;윤성현;안명석;류창하
    • Explosives and Blasting
    • /
    • v.20 no.3
    • /
    • pp.39-48
    • /
    • 2002
  • 우리나라는 지질특성상 각종 토공사를 시행할 때 암반 절취가 필수적이다. 그러나 소음진동 규제법의 강화, 각종 건설민원 발생 및 안전관리를 강화하기 위하여 종래에 해오던 일반발파(대발파)공법을 적용할 현장은 거의 없는 실정이므로, 미진동 발파공법과 진동제어 발파공법에 대한 기준품셈 및 시공기술에 대한 연구가 더욱 필요하다. 또한 종래의 미진동 발파공법의 품셈기준으로 되어있는 미진동 파쇄기(CCR, 상품명 Fine Cracker)를 사용한 발파공법은 기존의 암절취에 기술적 문제가 일부 대두되므로 이를 보완하기 위해 퇴적암 절취현장에서 미진동 파쇄기.정밀.에멀젼 화약을 사용하여 비교실험을 하였으며, 최근에 새로운 미진동 파쇄기(상품명 : Fine Cracker Plus)를 개발 시판하게 되어 이를 비교 검토하였다. 그 결과 일축 압축강도 $1623~2060kg/\textrm{cm}^2$의 경암 내지 극경암에서도 양호한 발파효과를 볼 수 있었다.

TBM 터널과 NATM 터널의 초 근접시공 사례

  • 이인기
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.1 no.2
    • /
    • pp.161-170
    • /
    • 1999
  • 본고에서는 $1986.8\~1988.7$월중에 시공된 부산지하철 1호선 3단계 건설구간 중 서대신동 로타리에서 괴정국민학교 앞까지 연${\cdot}$경암지역에서의 TBM(Tunnel Boring Machine)으로 시행된 단선터널(7.0m)과 NATM으로 시행한 복선터널의 근접시공에 따른 간벽부 보강설계 내용과 근접부 시공시 계측결과 분석, 지보 Pattern조정 및 시공 실적 등을 제시하였다. 원설계 내용 분석 결과 지보 Pattern이 현장 지반조건에 비해 과다하였고 TBM 굴진시 Thrust 2500kN(본 기계 기준) 이상인 연암이상의 지반에서는 TBM 굴착으로의 효율성이 있었고, 경암구간에서 병행터널의 간섭영향을 배제하려면 터널간의 중심거리가 터널직경의 2배 이상이 되어야 하며, TBM 단선터널(7.0m)의 일 평균 굴진 길이는 4.6m로 분석되었다. 앞으로 이와 유사한 암층에서의 터널근접 시공 및 TBM 굴착시 본 분석내용이 참고가 되기를 기대하여 본고를 작성하였다.

  • PDF