• Title/Summary/Keyword: 건축시공시뮬레이션

Search Result 112, Processing Time 0.024 seconds

A Study on the Analysis of Simulation for Fire Safety Diagnosis in Traditional Market Area (전통시장지역의 화재위험성 평가를 위한 시뮬레이션 해석에 관한 연구)

  • Koo, In-Hyuk;Lee, Byeong-Heun;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.46-47
    • /
    • 2017
  • Korea rapidly arranged urbanization and overpopulation with high growth of economy and all kinds of decrepit facilities are scattered all over the downtown. If there is a strong wind in fire, fire is rapidly increased by various fire spread factors. And Korea cannot build prediction model of urban fire combustion phenomena because there is no studies that physically explains the suitable flame phenomena for its real state. In this study, based on the Japanese Urban fire simulation to target the traditional market area and suitability of fire risk assessment were reviewed.

  • PDF

Framework on Database Development based on Modular Simulation Model Implementation for Curtain Wall Operations in High-rise Buildings (초고층 커튼월공사 MSM 구성 및 데이터베이스 구축을 위한 프레임워크)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Tae-Hyung;Shin, Young-Keun;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.301-302
    • /
    • 2012
  • Recently, high-rise building projects have been in the spotlight in South Korea. Curtain wall construction, as one of important operations in the high-rise building projects is composed of various, entangled and complex unit processes that require a systematic planning to prevent unexpected delays. A schedule simulation technique has been used for deriving more efficient planning and accurate performance measurement. However, the simulation technique has difficulty in collecting actual data and in applying data fluctuations during construction. Thus, this paper suggests a concept model of Modular Simulation Model(MSM) that overcomes such limitations of traditional simulation technique based on curtain wall operations.

  • PDF

A Proposal of Analysis Modeling on the Transfer and Adhesion of Incoming Salt to RC Structure (비래염분 전송 및 RC조 구조물 부착과정에 관한 분석 모델링 제안)

  • Cho, Gyu-Hwan;Kim, Woo-Jae;Ahn, Jae-Cheol;Park, Dong-Cheon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.91-92
    • /
    • 2012
  • RC structure which is located at shoreline has more serious damages compared with inland structure, because it is directly exposed to chlorine ion which is called incoming salt. In the transmission of incoming salt, differences in transmitted volume of incoming salts could occur according to the influences of local shoreline topography which includes surrounding weather conditions, types of building placements, obstacles of wind tunnel etc. And therefore, for the application of boundary conditions for durable offshore structure design against the salt attack, comparative analysis through wind tunnel test and fluid value simulation are executed in order to investigate the moving and adhesion process of incoming salt to offshore structure.

  • PDF

Development of Computing Model for the Process and Operation Interval of Reinforced Concrete Work using Web-CYCLONE (철근콘크리트 골조공사의 프로세스 및 공정 공백 산출 시뮬레이션 모형 개발)

  • Park, Sang-Min;Son, Chang-Baek;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.341-343
    • /
    • 2012
  • This study introduces a method for computation of process and operation gap in the specific construction operation(i.e., RC frame construction applying a block-grouping scheme) using CYCLONE-based simulation modeling and analysis technique. Since uncertainty of construction environment exists, a thoughtful production planning is required to effectively deal with a risk resulting in schedule delay in advance. This study presents the concepts of a time delay occurred in a process level and operation level in a operation model, and a method of measuring gap-times in each level while the simulation progresses. It helps a site manager to decide how many segmentation in a construction block is suitable for eliminating unproductive time-delays under the constrained resources (e.g., laborer, equipment). A case study presents a network model representing a three segmented RC frame work, and result obtained from the simulation experiment.

  • PDF

Computing Fuel Consumption of Dozer Engine for Eco-Dozing (에코-도징을 위한 도저의 엔진부하별 연료소모율 연산기법 연구)

  • Park, Young-Jun;Lee, Hong-Chul;Li, Xianjun;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.62-63
    • /
    • 2016
  • Existing studies relative to enhancing sustainability of earth-work are mainly involved in the performance of construction equipments. They assume that there is no variation of the engine power and fuel consumption and classify the dozer operation into working and idle conditions. They enable to find the most eco-friendly equipment fleet deployment plan. However, they are confined in that they do not provide a measure to assess the sustainability of the operation plan and suggest optimal alternative(s). This paper presents a method that identifies an optimal dozer operation plan that assures sustainability by reducing fuel consumption of the equipment. The method computes the dozer operation productivity using engine-torque-output map provided by equipment manufacturers. Indeed, it identifies the eco-dozing operation that minimizes fuel consumption and maximizes the target productivity.

  • PDF

Contingency Estimation Method based on Stochastic Earned Value Management System (추계적 EVMS 기반 예비비 산정 방법론)

  • Gwak, Han-Seong;Choi, Byung-Youn;Yi, Chang-Yong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.72-73
    • /
    • 2018
  • The accuracy of contingency estimation plays an important role for dealing with the uncertainty of the financial success of construction project. Its' estimation may be used for various purposes such as schedule control, emergency resolve, and quality expense, etc. This paper presents a contingency estimation method which is schedule control specific. The method 1) implements stochastic EVMS, 2) detects a specific timing for schedule compression, 3) identifies an optimal strategy for shortening planned schedule, 4) finds a probability density function (PDF) of project cost overrun, and 5) estimates the optimal contingency cost based on the level of confidence. The method facilitates expeditious decisions involved in project budgeting. The validity of the method is confirmed by performing test case.

  • PDF

The Development of Simulation Model for Calculating Hoisting Time of Double-Cage Construction Lift in Supertall Building Construction (Double-Cage 건설용 리프트의 양중시간 산정을 위한 시뮬레이션 모델 개발)

  • Kim, Wansoub;Lee, Dongmin;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.64-65
    • /
    • 2016
  • According to the recent increase in the height of supertall buildings, construction lift became one of most important equipment for vertical transportation of resources. However, increase in lifting load during peak time in which the resources are concentrated often causes a risk of construction delay. This study suggests a concept of Double-Cage construction lift, which is a lift with two cages attached together allowing transportation of resources on two consecutive work floors simultaneously. The aim of this study is to present a simulation model suitable for calculating hoisting time of Double-Cage construction lift. The proposed model is expected to be utilized when applying Double-cage construction lift for its efficient operation and management.

  • PDF

Examination of insulation effect by simulation of Curtain wall insulation Warm block (커튼월 프레임 단열층의 시뮬레이션을 통한 단열효과 검토)

  • Hong, snag-hun;You, Nam-Gyu;Jung, Ui-In;Kim, Bong-Joo;Kang, Hui Tae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.234-235
    • /
    • 2018
  • The development of insulation,the most important factor, is slow. The curtain wall market is getting bigger as the bulidings are getting bigger, but the insulation of the window is getting a problem. In order to solve this problem, we want to develop the insulation block used in the window frames. We will examine the insulation effect by using the existing Azon insulation block and the thermal worm convex which is to be developed with Therm 7.4 program.

  • PDF

4th Industrial Revolution for Prevention of Safety Accident at Construction Site Based on IT Convergence Technology Virtual reality simulation development (건설현장 안전사고 예방을 위한 4차산업혁명 IT융합기술기반 가상현실 시뮬레이션 개발)

  • Kim, Dae-Geon;Park, Tae-Hyeon;Park, Ju-Yeong;Park, Su-jin;Lee, Dong-Oun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.173-174
    • /
    • 2018
  • Recently, a growing number of accidents have taken place at construction sites, causing serious casualties. To prevent accidents or minimize damage, it is necessary to develop the safety precautions education is essential. However, the effects of safety education do not have as much effect as the importance of safety education. so As a new direction, we are looking forward to effective education by simulating realistic environments using VR. The safety training method used to experience and learn dynamic situations in a limited room wearing HMD is combined with VR. It will be the start of the construction industry going forward.

  • PDF

A Concept of Probabilistic Maintenance Cost Analysis Considering Risk Factors of Aged Multi-Family Housing (노후 공동주택의 위험요인을 고려한 확률적 유지관리비 분석 개념)

  • Park, Moon-Sun;Won, Seo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.246-247
    • /
    • 2019
  • This study was conducted to provide useful information to enable planned repair and cost planning during the operation and maintenance phase of aged multi-family housing. For this purpose, The concept of probabilistic maintenance cost analysis considering the risk factors of the aged multi-family housing is presented in the following six steps. 1. Risk factor investigation and analysis 2. Classification and deriving of maintenance cost 3. Investigation and deriving cost maintenance cost of old apartment house 4. Analysis of expert questionnaire 5. Analysis of Monte -Carlo simulation 6. Probabilistic maintenance cost Deriving the result. This study has limitations that need to be verified by applying actual data.

  • PDF