• Title/Summary/Keyword: 건축설계프로세스

Search Result 180, Processing Time 0.027 seconds

Digital Fabrication Integrated Architectural Design Process based on Lean startup (Lean startup 방법을 적용한 디지털 패브리케이션 통합 건축 설계 프로세스)

  • Jung, Jae-hwan;Kim, Sung-Ah
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.23-33
    • /
    • 2018
  • Recently, the industry actively adopts the cutting-edge technologies of the fourth industrial revolution and uses them to enhance the productivity and service of mass-customization. The manufacturing industry is creating new processes and business models by achieving digital transformations through a lean start-up approach aimed at achieving the highest customer satisfaction with minimal resources. Although attempts are made to manufacture the building by introducing the latest technology in architecture, it is applied sporadically, not as an integrated system, in the entire phase of the architectural project. This paper analyzes the changes in the construction industry through the application of core technologies of the fourth industrial revolution. Design processes are analyzed for the digital transformation of the construction industry by case study of advanced architectural design practice. A novel design concept model 'Architectural lean startup' is proposed by combining the architectural process and the lean start up method. Through the design of the bus stop based on the architectural lean startup concept, it is confirmed that the designer repeats the 'Generate-Test-Analysis' to develop the design and generate the final result.

The Development of Automated Building Equipment Design Process System Using 3D CAD (3차원 CAD정보를 활용한 건축설비설계 프로세스 시스템 개발방향)

  • Lee, Dong-Hyun;Jung, Woo-Shin;Kim, Young-Don;Song, Kyoo-Dong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.269-274
    • /
    • 2008
  • It is attempted that the standardization of the construction, globalization of the engineering construction and an information oriented construction spread by setting a goal of the advanced construction industry and productivity increase of human resources within the country. Hence, it has been brought in the information oriented construction of BIM based technology for the field of construction and equipment of Korea. The current study that examines the possibility of application of 3D ; that is BIM based programs of building equipment, and make better the problems of 3D building equipment system through the Pilot Test, indicates the way of growth development about the construction of building equipment process system.

  • PDF

A Study on Architectural Design of Elementary School Using Building Information Modeling(BIM) (Building Information Modeling(BIM)을 적용한 초등학교 설계에 관한 연구)

  • Cho, Jae-Keun;Jun, Han-Jong
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.14 no.3
    • /
    • pp.5-16
    • /
    • 2007
  • The main purpose of this study is to find out the strengths and weaknesses of the application of BIM to the educational facilities. To do so, we model Sanggye elementary school project using BIM, and consider other efficient methods for the lack of the information caused by the traditional blueprint. In addition, we try to lay the groundwork for expanding the application of BIM during the life cycle of an educational facility through researching a system to set up an accurate building information.

Influence of formation structure on corrosion resistance and adhesion properties of Zn alloy thin films prepared by PVD method (PVD법에 의해 제작한 Zn계 합금박막의 밀착성과 내식특성에 미치는 형성구조)

  • Bae, Il-Yong;Im, Gyeong-Min;Yun, Yong-Seop;Jeong, Jae-In;Lee, Myeong-Hun
    • Proceedings of the Korean Institute of Surface Engineering Conference
    • /
    • 2011.05a
    • /
    • pp.46-46
    • /
    • 2011
  • 각종산업의 건축자재, 전기기기 등의 분야에서 내식성 향상용 표면처리 도금재로 가장 많이 사용되고 있는 아연과 실용금속 중 가장 가벼우면서 비강도 및 치수 안정성이 뛰어난 Mg을 사용하여 Zn-Mg의 합금 박막을 제작하였다. 여기서는 Zn, Mg 단일 박막의 밀착성과 내식성의 한계점을 극복하기 위해서 모재와 코팅층 사이에 Al을 삽입하여 (Zn-Mg)/Al 합금 박막을 형성시켰다. 또한 박막의 증착과정 중 이들 막의 제어는 바이아스 전압을 일정하게 하고 진공도를 변수로 하였고, 진공도에 따라 달라지는 쳄버내의 가스 입자가 흡착 인히비터로 작용해서 박막의 몰포로지와 결정배향성의 구조에 중요한 영향을 준다는 것을 확인하였다. 그리고 이들 박막의 내식성과 밀착성에 미치는 몰포로지나 결정배향성과의 상관관계를 규명하여 최적의 코팅 프로세스를 결정하므로써 중간층 유무별 Zn계 합금박막의 기초적인 제작설계 지침을 제공하였다.

  • PDF

Evaluation of Forming Performance of TMC Steel Pipes & Tubes for Building Structure (건축구조용 TMC 강관의 가공성능 평가)

  • Im, Sung Woo;Kim, Jong Seong;Chang, In Hwa
    • Journal of Korean Society of Steel Construction
    • /
    • v.16 no.1 s.68
    • /
    • pp.43-49
    • /
    • 2004
  • With building structures becoming higher and having longer spans, new structural steel with better strength, thicker plate, and performance may be required rather than conventional structural steel. TMC steel is widely used in building structures largely due to its excellent seismic performance, superior weldability, and design strength that is not affected by plate thickness. To make use of TMC steel in pipe structures with large diameter and heavy wall, however, the this study, the degradation of material properties in submerged are welded SM520TMC steel pipes and tubes was evaluated using variable fabrication process and material change. Degradation test results showed that the yield and ultimate strength increased and elongation decreased regardless of the mode of fabrication, i.e., through roll bending or press forming, or steel used, i.e., domestic SM520TMC steel or SM520TMC steel from Japan.

Determination Process of Drift Capacity for Seismic Performance Evaluation of Steel Tall Buildings (초고층 철골 건축물의 내진성능평가를 위한 Drift Capacity 산정 프로세스)

  • Min, Ji Youn;Oh, Myoung Ho;Kim, Myeong Han;Kim, Sang Dae
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.4
    • /
    • pp.481-490
    • /
    • 2006
  • The actual performance of a building during an earthquake depends on many factors. The prediction of the seismic performance of a new or existing structure is complex, due not only to the large number of factors that need to be considered and the complexity of the seismic response, but also due to the large inherent uncertainties and randomness associated with making these predictions. A central issue of this research is the proper treatment and incorporation of these uncertainties and randomness in the evaluation of structural capacity and response has been adopted in the seismic performance evaluation of steel tall buildings to account for the uncertainties and randomness in seismic demand and capacities in a consistent manner. The basic framework for reliability-based seismic performance evaluation and the key factors for statistical studies were summarized. A total of 36 target structures that represent typical tall steel buildings based on national building code (KBC-2005) were designed for the statistical studies of demand factor s and capacity factors. The incremental dynamic analysis (IDA) approach was examined through the simple steel moment frame building in determination of global drift capacity.

Hybrid Prototype of Performance and Prescriptive Specifications in Curtain Wall Construction (커튼월 공사의 성능·사양 연계 시방서 프로토타입)

  • Lee, Jun-Ho;Cho, Dong-Hyun;Koo, Kyo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.433-442
    • /
    • 2014
  • The most design criteria and specifications in Korea utilized to ensure appropriate quality are based on process and prescriptive criteria determining materials, measure and methods. It has many problems including a loss of competitiveness resulting from inhibited creativity of the contractors. The performance-based specifications focused on final product are being proposed, but have difficulty in adapting to the architectural field. In this study the hybrid specification prototype for curtain wall construction was suggested. The specification framework was presented through analysis of linkage between the performance and prescriptive specification cases. Based on the survey with practitioners, the performance inspection process and the sample specification were developed by identifying the essential performance test timings. The applicability of the specification prototype was evaluated by interviews with experts. It was found that the prototype was active and a progressive supporting tool which could support to secure phased performance during construction as well as final performance.

Geometry-to-BIM Mapping Rule Definition for Building Plane BIM object (건축물 평면 형상에 대한 형상-to-BIM 맵핑 규칙 정의)

  • Kang, Tae-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.10
    • /
    • pp.236-242
    • /
    • 2019
  • Recently, scanning projects have been carried out in various construction and construction fields for maintenance purposes. The point cloud generated by the scan results is composed of a number of points representing the object to be scanned. The process of extracting the necessary information, including dimensions, from such scan data is called paradox. The reverse engineering process of modeling a point cloud as BIM involves considerable manual work. Owing to the time-consuming reverse engineering nature of the work, the costs increase exponentially when rework requests are made, such as design changes. Reverse engineering automation technology can help improve these problems. On the other hand, the reverse design product is variable depending on the use, and the kind and detail level of the product may be different. This paper proposes the G2BM (Geometry-to-BIM mapping) rule definition method that automatically maps a BIM object from a primitive geometry to a BIM object. G2BM proposes a process definition and a customization method for reverse engineering BIM objects that consider the use case variability.

An In-depth Analysis of Enhancing the Core Blueprint of Architectural Constructs Leveraging Value Engineering(VE) Techniques (VE 기법을 활용한 건축 구조물 코어 형식 개선 방안에 관한 연구)

  • Lee, Jae-Taek;Kim, Gyu-Yong;Lee, Jae-Hyun;Nam, Jeong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.571-581
    • /
    • 2023
  • The contemporary domestic construction landscape has witnessed a contraction, primarily attributed to the operational challenges faced by construction entities and a downtrend in the initiation of new projects. In light of this, domestic construction enterprises are ardently seeking avenues to economize whilst simultaneously amplifying the quality across diverse construction genres. Value engineering (VE), heralded for its prowess in not only cost mitigation but also in accelerating project timelines and bolstering construction quality, has been extensively adopted in refining finishing tasks. However, its application to framework enhancements remains conspicuously limited. Particularly in factory edification, framing emerges as a pivotal process exerting significant influence over the entire construction continuum. Thus, it becomes imperative to integrate VE techniques at the inception phase of framing. This would facilitate a meticulous examination of design schematics and on-site conditions, paving the way for alternative strategies that condense construction durations, economize on costs, and augment work efficiency, all the while upholding paramount standards of quality and safety. Such a venture stands to be foundational in expediting construction timelines, fostering economic efficiency, and buttressing construction safety protocols.

Study on Design Method of Tunnel-type Ammunition Storage Chamber (터널형 탄약고의 격실 설계 방법에 대한 연구)

  • Park, Sangwoo;Baek, Jangwoon;Park, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.3
    • /
    • pp.279-287
    • /
    • 2020
  • Recently, the demand for underground-type ammunition storage facilities has increased. Comparing with a ground-type ammunition storage facility, the underground-type ammunition storage facility can decrease the standard of safety distance because fragment and blast wave can be locked in the rock formation. However, the absence of a design method on the underground-type ammunition storage chamber became a major setback for the construction promotion. In this study, the process for designing an overall configuration of the underground-type ammunition storage facility was provided. First, the determination method for configuration and number of the chamber was developed by performing the ammunition storage simulation. Then, a tunnel (i.e., transfer channel for vehicles) and designed chambers can be arranged on the basis of safety distance standard. The safety distance standard also should be considered for determining the location and the size of entrances because of the blast wave and fragment effect at the entrances when an explosion is generated inside a chamber. In addition, considerations on the design for the waterproof and the drainage of subsurface water were analyzed through construction cases. Finally, an example of designing underground-type ammunition storage chambers was provided in order to verify the developed design process.