• Title/Summary/Keyword: 건축생산시스템

Search Result 154, Processing Time 0.025 seconds

A Study of the Decision Making System in adopting Off-Site Construction Method in the Initial Stage Considering the Building Project Characteristics -Focused on Structure Work of Apartment Housing- (건축 프로젝트 특성을 고려한 초기 단계에서의 Off-Site Construction 공법 도입 여부 의사 결정 시스템 개발 - 공동주택 골조공사 중심으로 -)

  • Lee, Sungho;Cha, Heesung;Son, Bosik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.89-97
    • /
    • 2022
  • Recently, various problems such as reduced productivity, insufficient inflow of skilled manpower, reduced quality, and concerns about increasing safety accidents have appeared in the domestic construction industry. Stakeholder of construction project are considering the Off-Site Construction (OSC) method rather than the conventional on-site construction as an alternative. Despite the importance of decision making in the early stage of the adoption of OSC, there is a lack of methodologies for rational decision making. In this study, a decision making system has been developed to derive the final construction cost score by deriving the project characteristics, selecting the construction difficulty index, and developing a cost model for each construction method alternatives to calculate the standard construction cost. Using this system, the OSC method can be effectively evaluated in terms of its feasibility in the early stage of construction

Development of Side Formwork Control System for Production FCP(Free-form Concrete Panel) (비정형 콘크리트 패널 생산을 위한 측면형상 제어시스템 개발)

  • Kim, Ki-Hyuk;Jung, Kyeong-Tae;Lee, Dong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.53-54
    • /
    • 2019
  • Currently, the market for free-form building continues to grow, but the technology for construction of free-form building in Korea is still in need of much study. In this study, we focused on this problem and conducted basic study for development a side formwork control system to product various types of FCP. As a result of this study, it is expected that it will be able to secure competitiveness for the free-form building market, which is expected to contribute greatly to the growth of the construction industry.

  • PDF

An Assessment of Field Application of Elementary Technology for Reducing Construction Duration in the Apartment Housing Construction (공동주택 골조공기단축을 위한 요소기술의 현장 적용성 평가)

  • Kim, Kyu-Hoi;Park, Moon-Seo;Lee, Hyun-Soo;Park, Song-Woo;Joo, Sun-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.368-372
    • /
    • 2007
  • Recently, construction companies prefer to use large scale system forms to prepare for lacking of skilled workers, aging and the chances of application of pre-build&post-sale policy. In result of the effort and interest, the duration for framework of domestic high rise buildings has been accomplished to 3-4days per floor but for the apartment housing which form over 90% of the domestic construction industry, and especially the middle story RC apartments which is the main part, the duration for framework is only about 6-8days per level. This is only about 50% of the duration per level of RC residential buildings in North America. In previous researches elementary technology, which has potential of duration reduction, was proposed and this research suggest the applicability in construction sites and ways to improve it using elementary technology applied Mock-up Test. Furthermore, we analyze the productivity and T/C usage rate of the 6day-Cycle and suggest an improved model.

  • PDF

The Development of Productivity Prediction Model for Interior Finishes of Apartment using Deep Learning Techniques (Deep Learning 기반 공동주택 마감공사 단위작업별 생산성 예측모델 개발 - 내장공사를 중심으로 -)

  • Lee, Giryun;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.3-12
    • /
    • 2019
  • Despite the importance and function of productivity information, in the Korean construction industry, the method of collecting and analyzing productivity data has not been organized. Also, in most cases, productivity management is reliant on the experience and intuitions of field managers, and productivity data are rarely being utilized in planning and management. Accordingly, this study intends to develop a prediction model for interior finishes of apartment using deep learning techniques, so as to provide a foundation for analyzing the productivity impacting factors and predicting productivity. The result of the study, productivity prediction model for interior finishes of apartment using deep learning techniques, can be a basic module of apartment project management system by applying deep learning to reliable productivity data and developing as data is accumulated in the future. It can also be used in project engineering processes such as estimating work, calculating work days for process planning, and calculating input labor based on productivity data from similar projects in the past. Further, when productivity diverging from predicted productivity is discovered during construction, it is expected that it will be possible to analyze the cause(s) thereof and implement prompt response and preventive measures.

Developing an Information Validation System for Integrated AEC/FM Systems using Building Information Modeling Standards (건축 정보 모델 표준을 적용한 정보시스템 통합을 위한 검증 도구 개발)

  • Han, Shocky
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.344-347
    • /
    • 2009
  • 건축, 토목 분야의 정보 교환을 위한 표준으로 주목받고 있는 BIM 모델의 국제 표준인 IFC 표준을 위해, 소프트웨어가 IFC 표준에 맞게 유효한 정보를 입출력 하도록 도와주고, IFC 파일이 표준에 맞는지 검증할 수 있는 모듈을 개발했다. 특히, 지역별 및 국가별 상황에 맞게 BIM 모델을 수정하거나 확장해 사용하도록 권고하고 있는 상황에서 다양한 확장 IFC 표준을 효과적으로 지원할 수 있도록 IFC 표준을 정의하는 EXPRESS 언어로부터, 객체 지향 언어를 위한 소프트웨어 개발 라이브러리를 자동으로 생성하고, 해당 SDK를 활용해 IFC 모델을 검증하는 라이브러리를 자동으로 생성하며, IFC 파일을 검증할 수 있는 독립적인 실행 파일도 자동으로 생성할 수 있도록 했다. 또한 객체 지향 라이브러리를 사용함으로써 주어진 IFC 모델을 효과적으로 문서화 할 수 있도록 HTML 생성 도구를 개발하거나 3차원 형상 확인이 가능하도록 VRML 생성 도구를 개발하는 등의 작업이 쉽게 이뤄짐을 확인했다. 이렇게 자동화된 BIM 소프트웨어 개발 도구는 IFC 모델의 수정이나 확장을 고려하는 BIM 소프트웨어 개발 프로젝트의 생산성을 향상시키고, 해당 시스템의 운영에 신뢰도를 높이는 것은 물론이며, 향후 국내 실정에 맞게 운영될 BIM 인증 제도에도 활용하면 기존의 수작업 방식 인증제도에 비해 인증에 걸리는 시간과 비용을 줄이는 것은 물론 인증 자체의 객관성과 정확성, 투명성과 신뢰성을 높일 수 있을 것으로 기대된다.

  • PDF

Flexible Unit Floor Plan of a Modular House Considering the Production System (생산 시스템을 고려한 모듈러주택의 가변형 평면계획 연구)

  • Lee, Ji-Eun
    • Land and Housing Review
    • /
    • v.12 no.3
    • /
    • pp.67-78
    • /
    • 2021
  • After World War II, modular housing was developed as a means of quickly and efficiently meeting the housing supply demand. For the past 30 plus years, efforts have been made to improve modular housing in South Korea and to increase their competitiveness in the housing market. This study investigated modular houses based on a steel framed rahem structure which provides a flexible floor plan where walls are easily reconfigured to create rooms of various sizes and functions. Similar to the factory production methods used in the automotive industry, the modular housing industry can also benefit by standardizing such aspects as building components, manufacturing and construction methods, materials, process management, and floor plans. This study examined the feasibility of using a 3m × 3m module for developing various floor plans which are easy to produce and transport. Each 3m × 3m module can be configured to meet different living needs resulting in a complete home when multiple modules are connected. The module configurations can be varied to meet ground transportation and crane limitations. This study found that a 3m × 3m steel framed modular unit is a promising step towards providing residents with plans that meet their living preferences while improving and increasing the supply of modular houses.

Improvement Particle and Physical Characteristics Applying of The Pretreatment Process System of Coal Gasification Slag and It's Verification Based on Statistical Approach (석탄 가스화 용융 슬래그의 전처리 공정 시스템 적용에 따른 입자 및 물리적 특성 개선 및 통계적 검증)

  • Kim, Jong;Han, Min-Cheol;Han, Jun-Hui
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.10 no.3
    • /
    • pp.285-292
    • /
    • 2022
  • The objective of this study is to investigate whether CGS generated in IGCC satisfies the fine aggregate quality items specified in KS F 2527(Concrete Aggregate) through the pretreatment process system and the quality improvement the system. The statistical significance of the pretreatment process was analyzed through Repeated Measurements ANOVA as measured values according to individually pretreatment process system. As a result of the analysis, In the case of CGS fine aggregate quality before and after the pretreatment process system, the density increased 5.2 %, the absorption rate decreased by 1.86 %, the 0.08 mm passing ratio decreased by 2.25 %, and Fineness Modulus and Particle-size Distribution were also found to be adjustable. It was found that the pretreatment process system was significant in improving the quality of CGS.

Present status of advancement of housing statistics information system and improvement plan (주택 통계 관련 정보시스템의 고도화 현황 및 개선방안 제시)

  • Lee, Min A;Yang, Dong Suk
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2021.11a
    • /
    • pp.548-550
    • /
    • 2021
  • 각 정보시스템에서 생산되는 주택과 관련된 통계 데이터는 정교한 예측과 판단이 요구되는 주택시장에서 매우 중요한 역할을 한다. 현재 정보시스템의 데이터를 기반으로 주택통합DB와 주택통합 플랫폼을 개발하고 있으며, 추후 주택시장의 합리적이고 과학적인 정책을 수립할 수 있는 기반이 될 것이다. 따라서 본 연구에서는 건축행정시스템(세움터)와 주택공급통계정보시스템(HIS)를 대상으로 정보시스템 고도화 현황을 알아보고 개선방안을 제시한 예시를 소개하고자 한다.

Identifying Considerations for Developing SLAM-based Mobile Scan Backpack System for Rapid Building Scanning (신속한 건축물 스캔을 위한 SLAM기반 이동형 스캔백팩 시스템 개발 고려사항 도출)

  • Kang, Tae-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.3
    • /
    • pp.312-320
    • /
    • 2020
  • 3D scanning began in the field of manufacturing. In the construction field, a BIM (Building Information Modeling)-based 3D modeling environment was developed and used for the overall construction, such as factory prefabrication, structure construction inspection, plant facility, bridge, tunnel structure inspection using 3D scanning technology. LiDARs have higher accuracy and density than mobile scanners but require longer registration times and data processing. On the other hand, in interior building space management, relatively high accuracy is not needed, and the user can conveniently move with a mobile scan system. This study derives considerations for the development of Simultaneous Localization and Mapping (SLAM)-based Scan Backpack systems that move freely and support real-time point cloud registration. This paper proposes the mobile scan system, framework, and component structure to derive the considerations and improve scan productivity. Prototype development was carried out in two stages, SLAM and ScanBackpack, to derive the considerations and analyze the results.

Construction Performance Evaluation of Steel Staircase Systems based on Construction Simulation CYCLONE Techniques (건설시뮬레이션 사이클론 기법을 활용한 시스템 철골계단 공법의 현장적용성 평가)

  • Lee, Jeong-Hun;Lee, Kyung-Suk;Kim, Hyun-Mi;Kim, Young-Suk;Han, Seung-Woo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.19-26
    • /
    • 2010
  • Advanced construction technologies have been rarely applied to practical construction operations on jobsites due to a lack of quantified evaluation data of the performance of such technologies. The basic objective of this study is to suggest a feasible way for the evaluation of the performance of new technologies based on construction simulation techniques, which have been frequently used in academic research for productivity estimation. Steel staircase systems were selected as the new technology to be investigated. The simulation was implemented in various ways, such as one staircase to six staircases on a floor. The simulation results provided in this study suggest that planners are able to make a fundamental decision on the use of targeted new technology with the estimated performance data (productivity and unit costs). These findings also indicate that a simulation technique could be one of the methods appropriate for use as a planner's decision-making tool.