Application of Activity-Based Costing(ABC) for Modular Building Construction Indirect Costs Calculation at the Manufacturing Stage (활동기준원가계산법(Actvitiy-Based Costing)에 의한 모듈러 건축물 공장제작단계 간접비 산정 방안)

  • Lee, JeongHoon;Park, Moonseo;Lee, Hyun-Soo;Lee, Kwang-Pyo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.139-145
    • /
    • 2015
  • Modular construction is combined with manufacturing production process and conventional construction industry technique. Considering characteristic of modular construction production process, manufacturing facilities require indirect costs for utilities, equipment, and overall maintenance, which can affect modular units pricing. However, current modular construction cost classification is inadvertent to reflect the manufacturing overhead costs, because it is generally added as a percentage to sum of labor, material and equipment as it called in single cost pool used. This process is easy to estimate the total construction cost at the project starting points, but it brings on misunderstanding of project profit estimations by "cross subsidization phenomenon". To prevent this situation, in this research aims to provide modular construction overhead cost handling process at the detailed indirect cost calculation for manufacturing stage using Activity-Based Costing as one of the powerful method for overhead costs estimation and allocation. Using this research results, modular construction cost estimators have more detailed cost information of modular units and prevent to misallocate indirect costs. Also, it can be utilized to aid the understanding of the company's profit structure.

Establishment of Collaborative Decision Making Support Process in Pre-Final Design Step (건축 중간설계단계의 협력 의사결정 지원 프로세스 구축)

  • Oh Seung-Jun;Kwon Won;Kim kyung-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.315-318
    • /
    • 2003
  • In Korea construction project case, architectural construction project is curtailed production because information network process within multidisciplinary isn't smooth. Particularly, the construction is not insufficient about performance, cost and material, construction process, etc. in result various question arises because of design error in construction step. And various mistake is made because communication path within multidisciplinary isn't smooth in architectural design and design change process. Therefore The final object of this study is to propose the establishment method of decision support process for the cooperative design in order to provides improved design coordination and optimize the building system.

  • PDF

Interview - "BIM, Fits well with small and medium-sized architect offices!" (인터뷰 - "BIM, 중소규모 건축사사무소에도 잘 맞는다!")

  • Yuk, Hye-Min
    • Korean Architects
    • /
    • s.615
    • /
    • pp.32-35
    • /
    • 2020
  • 코로나19 이후 건축사업계 비대면 작업 등의 필요성이 대두되면서, 스마트건설 플랫폼 기술인 BIM(Building Information Modeling, 건설정보모델링) 활성화에 관한 목소리도 높아지고 있다. 최근 한국건설기술연구원에서는 공공분야 BIM 기술의 성숙도를 4단계(레벨1~4)로 봤을 때, 우리나라의 평가치는 '레벨1' 초보 수준에 머물러 있다는 진단을 냈다. 이미 '레벨3' 수준에 진입한 영국 등 선진국보다 뒤처져 있다는 분석인데, 이는 2D 환경을 기반으로 설계 또는 시공업무에 대해 제한적으로 BIM을 적용하면서, 일정 규모 이상의 설계BIM만 의무화한 수준이기 때문이다. BIM 트렌드가 '기술개발'에서 '활용' 단계로 넘어가는 과정 가운데 건축분야에서의 활성화 방안은 무엇일까. 월간 '건축사'가 'WBIM(주.더블유빔)'사(社)의 이재환 대표를 만나 BIM의 현장 활용성, 그리고 적용 측면에서의 현실문제 등에 대한 현장 이야기를 들어봤다. 각종 개발사업과 설계파트를 지원하며 BIM전문가로 활동해 온 이재환 대표는 "기획단계부터 BIM을 활용하면 사업 진행 전 과정에서 실시간 검증이 가능하고 동시에 각종 아이디어를 효과적으로 적용할 수 있다"면서도 "활용성을 확보하려면 업계뿐 아니라 발주처, 감독 등도 BIM에 대한 이해도를 높여야 한다"고 말했다.

  • PDF

Considerations in the early stage of Designing the Unit Modular Building (유닛모듈러 건축물의 설계 초기 단계에서의 고려 사항)

  • Lee, Young-Ho;Lee, Du-Heon;Kim, Kyoon-Tai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.133-142
    • /
    • 2012
  • With the recent changes in building environments such as low-carbon green growth, there have been increasing demands for the new building system that is eco-friendly and can maximize efficiency such as the unit modular system. For the unit modular system, more than 80% of the whole process is carried out in the factory while in the field, mostly unit module assembling and finish work are done. Thus, the quality at the pre-construction stage when design and manufacturing are done determines the quality of the building as a whole. In the country, the unit modular method was first applied in 2003 to school buildings and has gradually expanded afterwards, but due to the lack of examples and related information as well as the small scale of modular manufacturers, its characteristics have not been sufficiently reflected in design, manufacturing and field constructions. This study, as an attempt to improve the design quality of unit modular buildings, points to the problem in manufacturing and field construction, compares and analyzes its causes, and suggests major points to be considered in the early stage of designing the unit modular buildings.

Analysis on Learning Effects of the Education Program Applying the Team-based Learning Method for Building Construction (팀 기반 학습을 이용한 건축시공 교육의 학습효과 및 만족도 분석)

  • Kim, Jae-Yeob;Won, Jongsung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.1
    • /
    • pp.101-109
    • /
    • 2017
  • This study aims to quantitatively analyze impacts of the team-based learning (TBL) method on learning of architectural engineering students. A TBL-based education program, consisted of preparation, readiness assurance, and application phases, was proposed by considering characteristics of architectural engineering education in South Korea and was applied in building construction classes. In order to measure learning effects and satisfaction levels of the proposed TBL-based education program, a set of questionnaires was conducted with students who took the building construction classes. As the results, learning effects and satisfaction levels of the TBL-based approach were higher than those of traditional approaches. Individual and team readiness assurance tests in the readiness assurance phase were the most effective and satisfactory items, while assessment in the application phase was the least effective and satisfactory item.

A Study on the Development of a BIM-based Spatial Planning Simulation System for Architectural Planning Stage Support (건축기획단계 지원을 위한 BIM 기반 공간계획 시뮬레이션 시스템 개발에 관한 연구)

  • Choi, Sun-Young;Choi, Ju-Won;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.19-23
    • /
    • 2011
  • The planning stage of an architectural project has much more significant effects on the cost or outcome of the project than other stages of the project. In addition, the importance of architectural planning has been further increasing according to the recent trend of construction projects becoming larger in scale and more complex. In spite of this, the current situation is that the planning stage work is not being systematically managed. Accordingly, the purpose of this study was to develop a BIM-based simulation system for providing support during architectural planning stage such as spatial planning & review, cost review, project owner requirements management, etc. It is easy to review various alternatives using this system that allows not only the modeling of space object modeling but also the instantaneous review of spatial area & layout, cost, etc. based on object information. In addition, it can be used as a communication tool with the project owner as it provides the visualized information and quantitative data of the building model, and the information created through this system can be delivered to the following stage for usage. It is thought that using this system, the entire project work including the architectural planning stage can be supported and even contributing to the advancement of architectural process.

지구단위계획의 수립방법과 기준(2) - 지구단위계획 수립 매뉴얼을 중심으로

  • Lee, Hui-Jeong
    • Korean Architects
    • /
    • no.2 s.406
    • /
    • pp.48-62
    • /
    • 2003
  • 지구단위계획은 정확한 현황의 파악과 문제의 진단을 통한 합리적인 계획의 구상이 무엇보다도 중요하다는 것을 설명하였다. 그리고 바람직한 계획구상을 위한 고려사항을 단계별로 계획의 수립 검토단계, 구역설정단계, 문제 및 과제 파악단계, 계획구상단계 등 4단계로 나누어 살펴보았다. 이번호에서는 주로 계획의 수립과 관련된 사항을 중심으로 매뉴얼의 내용을 요약 소개하고자 한다. 계획운영의 실질적인 구속력을 갖는 계획의 수립은 계획구상을 구체화하고, 이를 실현시키기 위한 수단을 마련해 나가는 과정적 의미를 가진다. 이러한 과정을 크게 계획안의 작성단계, 계획실현의 구체화 단계, 계획의 결정단계 등 3단계로 나누어 설명하도록 한다. 이와 같은 내용은 매우 복잡하고 많은 설명이 필요한 부분이라 할 수 있다. 그러나 한정된 지면관계상 여기에서는 보다 전체적인 작업의 흐름과 내용구성을 중심으로 요약하도록 한다. 지나친 축약으로 인해 내용이해에 다소 어려움이 있으리라 생각되지만 보다 자세한 내용은 이를 바탕으로 서울시 지구단위계획 매뉴얼을 참조할 수 있을 것이다.

  • PDF

Schematic Design Using a Design Tool based on Three Dimensional Bubble Diagrammatic Technique (3차원 버블 다이어그램 기법을 지원하는 디자인 도구를 이용한 개략 디자인 방법에 관한 연구)

  • Lee, Yun-Gil;Park, Jae-Wan;Choi, Jin-Won
    • 한국HCI학회:학술대회논문집
    • /
    • 2006.02b
    • /
    • pp.57-62
    • /
    • 2006
  • 건축디자인 초기단계에서 다이어그램은 아이디어 및 디자인 해결방안을 도출하기 위한 분석 도구로써 중요한 의미를 지닌다(Wang, 1999; Do, 1997). 이러한 다이어그램은 시각적 디자인 피드백을 가능하게 함으로써 건축디자인 실무 및 교육에서 필수적인 디자인 도구라고 할 수 있다 (Schon and Wiggins, 1992; Gross, 1996; Kurmann, 1998). 최근에 IT 기술이 건축분야에 적용됨에 따라, 건축가들의 전통적으로 고려되어 왔던 인간의 행동, 자연현상, 건축재료, 건축부재, 대지조건 외에 다양한 IT 기술과 관련된 정보를 분석하고 고려할 필요성을 가지게 되었다. 그러나 이러한 다양한 IT 기술은 건축적인 요소들과 접목되어 적용되기 때문에 건축가들은 디자인 초기단계부터 IT 기술의 접목이 가능한 디자인 도구를 필요로 하게 되었다. 즉, 이는 IT 정보와 공간정보와의 관계 및 적용을 건축가가 빠르게 이해하고 분석하고 이를 디자인에 반영할 수 있도록 도와주는 시각적 다이어그램 표출이 가능한 디자인 도구가 필요하게 되었다. 본 논문에서는 다양한 IT 기술과 공간 정보의 다양한 형태의 관계를 나타내는 3 차원 버블 다이어그램을 이용한 계략 디자인 방법을 제안하고, 이를 기반으로 3 차원 버블 다이어그램을 지원하면서 건축 디자인 초기단계에 이용 가능한 디자인 도구를 개발한다. 본 연구에서 개발된 디자인 도구는 정보의 유형에 따라 다양하게 형태를 변화시킬 수 있는 노드(node)와 연결선(edge)로 구성되고, 저장된 특정 건축정보는 다이어그램으로 생성된 디자인 대안을 평가하는데 사용된다. 일종의 DSS(Decision Support System)인 본 시스템은 디자인 초기단계에서 3 차원 디자인 아이디어를 제공할 뿐만 아니라 다양한 디자인 대안을 빠르게 생성하고 이를 실시간으로 평가함으로써 디자인 효율성을 증가시킬 것이다. 본 시스템은 유비쿼터스 기술이 적용된 신도시에 생성될 통관관제센터 디자인에 실험적으로 적용되었다.

  • PDF