• Title/Summary/Keyword: 건축공사 현장

Search Result 425, Processing Time 0.018 seconds

Applicable Building Range for the Introduction of the Building Separation and Dismantling System (건축물 분별해체 제도 도입을 위한 적용 대상 건축물 범위 설정)

  • Park, Ji-Sun;Song, Tae-Hyeob;Choi, Dong-Ho
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.1 no.3
    • /
    • pp.189-196
    • /
    • 2013
  • In order for efficient recycling and eco-friendly treatment of construction waste, there is a need to apply a building separation and dismantling technique early on in the stage of waste generation. This study was conducted to analyze the relevant domestic circumstances and propose the applicable range of buildings in order to introduce a building separation and dismantling system to Korea. For this purpose, related policies and systems implemented overseas and the current situation of buildings were examined, and the workability of separation and dismantling of buildings according to their uses was compared. Also, the economic impact of the separation and dismantling system was examined and a survey was conducted, seeking the opinions of the relevant companies regarding the need for the system and the selection criteria for eligible buildings. Based on the results, it was determined that it would be impossible to apply the separation and dismantling system to all buildings in Korea, considering the current technical power and economic situation, and that the system should be introduced in phases, according to the building classification determined based on floor area and use, as the cost may vary depending on a number of variables including the level of difficulty and field conditions.

A Multi-agent based Cooperation System for an Intelligent Earthwork (지능형 토공을 위한 멀티에이전트 기반 협업시스템)

  • Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.5
    • /
    • pp.1609-1623
    • /
    • 2014
  • A number of studies have been conducted recently regarding the development of automation systems for the construction sector. Much of this attention has focused on earthwork because it is highly dependent on construction machines and is regarded as being basic for the construction of buildings and civil works. For example, technologies are being developed in order to enable earthwork planning based on construction site models that are constructed by automatic systems and to enable construction equipment to perform the work based on the plan and the environment. There are many problems that need to be solved in order to enable the use of automatic earthwork systems in construction sites. For example, technologies are needed for enabling collaborations between similar and different kinds of construction equipment. This study aims to develop a construction system that imitates collaborative systems and decision-making methods that are used by humans. The proposed system relies on the multi-agent concept from the field of artificial intelligence. In order to develop a multi-agent-based system, configurations and functions are proposed for the agents and a framework for collaboration and arbitration between agents is presented. Furthermore, methods are introduced for preventing duplicate work and minimizing interference effects during the collaboration process. Methods are also presented for performing advance planning for the excavators and compactors that are involved in the construction. The current study suggests a theoretical framework and evaluates the results using virtual simulations. However, in the future, an empirical study will be conducted in order to apply these concepts to actual construction sites through the development of a physical system.

The Comparison and Analysis of Dust, Soil and Water Pollution Through the Case Study of Demolition Sites (해체공사의 분진발생과 토양, 수질 오염의 특성)

  • Lee, Kyoung-Hee;Kim, Hyo-Jin;Park, Jae-Han;Chu, Kyoung-Hoon;Ko, Kwang-Baik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.100-108
    • /
    • 2010
  • With the rapid economic growth and improvement of living conditions in Korea, rebuilding and redevelopment of existing houses has also been rapidly increasing. As a result, considerable construction and demolition wastes have been produced. Demolition wastes, however, must be given special attention because of the various harmful substances in them. The construction waste has been produced most at demolition phase, but the research into that area has not being to make nearly within the country. The aim of this study was to evaluate and compare the contamination figures of the heavy metals and toxin organic substances in the soil and water caused by flying ashes generated and eventually accumulated in building demolition works. AB a result. most of the pollution levels were not worrisome, but some were increased after the demolition with the water used to prevent the dusty air and in the target buildings. However in the vicinity of the demolition sites with explosives there was no report of study in water and soil pollutions, so to minimize pollutions we need to make plans to select the harmful substance in the first place. Thus, this research is expected to be the important materials for future research into the construction waste area.

A Layout Planning Optimization Model for Finishing Work (건축물 마감공사 자재 배치 최적화 모델)

  • Park, Moon-Seo;Yang, Young-Jun;Lee, Hyun-Soo;Han, Sang-Won;Ji, Sae-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.43-52
    • /
    • 2011
  • Unnecessary transportation of resources are one of the major causes that adversely affect construction site work productivity. Therefore, layout related studies have been conducted with efforts to develop management technologies and techniques to minimize the resource transportation made at site-level. However, although the necessity for floor-level layout planning studies has been increasing as buildings have become larger and floors have become more complicated, studies to optimize the transportation of materials inside buildings are currently not being actively conducted. Therefore, in this study, a model was developed using genetic algorithms(GA) that will enable the optimization of the locations of finishing materials on the work-floor. With the established model, the arrangement of diverse materials on complicated floors can be planned and the optimized material layout planning derived from the model can minimize the total material transportation time spent by laborers during their working day. In addition, to calculate travel distances between work sites and materials realistically, the concept of actual travel distances was applied. To identify the applicability of the developed model and compare it with existing methodologies and analyze it, the model was applied to actual high-rise residential complexes.

Development of an Adjustable Beam Bracket for Beam Table Form - Conceptual Design and Structural Stability Analysis - (보 테이블 폼 전용 가변형 보 브라켓 개발 - 개념 디자인 제시 및 구조적 안정성 분석 -)

  • Hong, Yu-Na;Yeom, Dong-Jun;Yoo, Hyun-Seok;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.70-80
    • /
    • 2018
  • Recently, the construction industry has lively utilized system forms to improve the work productivity and safety of form work, and the beam table form is one of them. However, the beam table form is used limitedly for the construction of buildings where the same beam size is applied to every floor. To make it possible to apply the beam table form to a building where different beam sizes are designed according to the uses of floors, it was analyzed that among the components of the beam table form, the beam bracket, should be able to flexible adjust the size of the beam form only with simple operation. Therefore, the purpose of this study is to propose the conceptual design of "an adjustable beam bracket for beam table form" that allows the adjustment of beam form size with simple operation and has excellent applicability to construction sites as well. In case this study's conceptual design of adjustable beam bracket for beam table form is fabricated into a real thing, it is expected that the beam table form will be applicable to even buildings where different beam sizes are designed according to the uses of floors, thereby contributing to the improvement in the work productivity and safety of form work.

Application of Input-Output Table to Estimate of Amount of Energy Consumption and CO2 Emission Intensity in the Construction Materials -Focusing on Input-Output Tables Published in 2005, 2007- (건축공사 주요자재별 에너지소비량 및 CO2 배출 원단위 값 산출에 산업연관표 적용 적정성 검토 연구 -2005년, 2007년 산업연관표를 중심으로-)

  • Jung, Young-Chul;Kim, Sung-Eun;Jang, Young-Jun;Kim, Tae-Hui;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.247-255
    • /
    • 2011
  • Currently, there is database for per unit requirements of major construction materials in terms of energy consumption and $CO_2$ emission based on the input-output table published by the Bank of Korea in 2000, but no database for per unit requirements based on input-output tables was published in 2005 and 2007. The purpose of this study was to calculate the unit requirement values of major construction materials in terms of energy consumption and $CO_2$ emission generated by using the input-output tables published in 2005 and 2007. To estimate the unit requirement values, a database building method with the input-output tables was adopted by selecting 16 types of construction materials in wide use on construction sites. When the study results were compared with existing unit requirement values based on the input-output table of 2000, there were small discrepancies, from which it can be interpreted that the method used in the study is reasonable. Unit requirement values estimated based on input-output tables of 2005 and 2007 tended to decrease, and the highest value of energy consumption and $CO_2$ emission were found in the materials using cement and rebar.

Mock-up Test of Temperature Crack Reduction Method Application by Setting Time Control of Mat Foundation Mass Concrete (응결시간조정에 의한 매트기초 매스 콘크리트의 온도균열저감 공법적용의 Mock-up Test)

  • Han, Cheon-Goo;Lee, Jae-Sam;Noh, Sang-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.55-61
    • /
    • 2009
  • Recently, the number of high-rise buildings being built in Korea by major construction companies for residential and commercial use has been increasing. When constructing a high-rise building, it is necessary to apply massive amounts of concrete to form a mat foundation that can withstand the huge load of the upper structure. However, it is of increasing concern that due to limitations in terms of the amount of placing equipment, available job-sites and systems for mass concrete placement in the construction field, it is not always possible to place a great quantity of concrete simultaneously in a large-scale mat foundation, and for this reason consistency between placement lift cannot be secured. In addition, a mat foundation Is likely to crack due to the stress caused by differences inhydration heat generation time. To derive a solution for these problems, this study provides test results of a hydration heat crack reduction method by applying placement lift change and setting time control with a super retarding agent for mass concrete in a large-scale mat foundation. Mock-up specimens with different mixtures and placement liftswere prepared at the job-site of a newly-constructed high-rise building. The test results show that slump flow of concrete before and after adding the super retarding agent somewhat Increases as the target retarding time gets longer, while the air content shows no great difference. The setting time was observed to be retarded as the target retarding time gets longer. As the target retarding time gets longer, compressive strength appears to be decreased at an early stage, but as time goes by, compressive strength gets higher, and the compressive strength at 28 days becomes equal or higher to that of plain concrete without a super retarding agent. For the effect of placement lift change and super retarding agent on the reduction of hydration heat, the application of 2 and 4 placement lifts and a super retarding agent makes it possible to secure consistency and reduce temperature difference between placement lifts, while also extending the time to reach peak temperature. This implies that the possibility of thermal crack induced by hydration heat is reduced. The best results are shown in the case of applying 4 placement lifts.

Quantification Model Development of Human Accidents based on the Insurance Claim Payout on Construction Site (건설공사보험 사례를 활용한 건설현장 인명사고 정량화 모델 개발)

  • Ha, Sun-Geun;Kim, Tae-Hui;Son, Ki-Young;Kim, Ji-Myong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.2
    • /
    • pp.151-159
    • /
    • 2018
  • Accident rate in the construction industry of South Korea is increasing every year, and it represents the highest percentage among industries. This shows that activities performed to prevent safety accidents in the country are not efficient when it comes to reduce the accident rate. In order to resolve this issue, a model for the prediction of human accidents should be established. In addition, it is required a quantification study based on pattern of human accidents. Therefore, the objective of this study is to quantify uncertainty of human accidents risk and predict how to change in various circumstances by using Monte Carlo Simulation. To achieve the objective, first, pattern of human accidents was defined. Second, insurance claim payout and information of human accidents during 14 years in construction site were collected. Third, descriptive analysis is conducted to determine the characteristics of the accident pattern. Fourth, to quantitatively analyze the pattern of the human accidents, the population of each accident occurrence and payout were estimated. Finally, estimated populations was analyzed according to characteristics of distribution by using Monte carlo simulation. In the future, this study can be used as a reference for developing the safety management checklist in construction site and development of prediction models of human accident.

Compressive Strength Development Properties of Concrete using Sodium based Accelerating Admixtures (나트륨계 기반 조강형 혼화제를 사용한 콘크리트의 압축강도발현 특성)

  • Song, Yeong-Chan;Lee, Tae-Gyu;Kim, Yong-Ro;Seo, Chi-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.3
    • /
    • pp.259-266
    • /
    • 2018
  • In recent years, the early strength of concrete is important in order to shorten the time of form removal at the construction site. The purpose of this study is to analyze the moment of form removal as investigating the amount of cement contents and the physical properties and strength of the concrete according to types of admixture in the curing temperature of $10^{\circ}C$ for concrete of 21 to 27 MPa. As a result, it was found that compressive strength of concrete could not be secured 5 MPa by 36 hours even if the amount of cement contents were increased to $360kg/m^3$ with plain admixture. Also, it was confirmed that the strength improvement rate was excellent when using the accelerating agent with polycarboxylic acid type, and the moment of compressive strength of 5 MPa was estimated at 30 hours.

A Study on Optimal Laser Scanning method for Reverse Engineering at Interior Remodeling Project (리모델링 프로젝트의 역설계 적용을 위한 최적 3차원 레이저 스캐닝 정보 획득 방안에 관한 연구 - 실내 리모델링을 대상으로 -)

  • Lee, Sangseol;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.3-11
    • /
    • 2014
  • Recently, remodeling construction project has been prevalently conducted in major city areas in Korea. However, remodeling construction project has a difficulty in conducting a construction because of non-existing drawing or lack of drawing information. To solve these problems, modeling techniques by using reverse engineering have been widely studied in other industries such as aerospace and automobile industry. But reverse engineering techniques have not been used in remodeling construction projects because those technology haven't supplied less accuracy during required time for surveying. So, this study suggests optimal method of acquiring accurate 3D laser scanner information for reverse engineering at interior remodeling project.