• Title/Summary/Keyword: 건설 IT

Search Result 8,404, Processing Time 0.137 seconds

A Study on the Selection Method of Construction Management based on Public Construction Projects (공공건설사업의 건설사업관리방식 선정 방법에 관한 연구)

  • Kim, Kwan-Su;Park, Hyung-Keun;Son, Bo-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.65-73
    • /
    • 2013
  • Even though the construction management (CM) system was introduced for the purpose of increasing the efficiency of the domestic construction industry along with the establishment of construction industry fundamental laws in December of 1996, now it is very difficult that the public institutions can judge their application of construction management methods due to the lack of clear guidelines or directions to select construction management methods when the public institutions were executing public construction projects. Therefore, this study was executed to prepare for the selection criteria which could be referred in reviewing the application of construction management ordering methods according to public institution's competences and project characteristics. It is expected that future domestic demand of construction management will be gradually increasing both in public and private construction sectors. However under the current construction management systems, it is judged to be difficult that the construction projects that apply the construction management methods will be activated with full-scale. Therefore, it could be said that active efforts in domestic sectors are required in order that the construction management systems of developed countries levels could be activated. Additionally in order to vitalize the construction management systems, it is expected that public institutions could use this study results as the review data for feasibility of construction projects for the consignment of construction management in selecting the ordering methods.

Information System for Managing Cost Reimbursable Construction Projects (실비정산 비용지불 방식에 적용 가능한 건설 프로젝트 정보관리 시스템)

  • Kang, Namhee;Song, Hojeong;Kim, Hyunjung;Choi, Jaehyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.2
    • /
    • pp.237-247
    • /
    • 2015
  • The project management information system (PMIS) has recently been developed by using the information technology(IT) in order to implement advanced information management technology to construction industry in Korea. The PMIS has been applied not only to domestic construction projects, but also to some overseas projects executed by Korean construction companies. This study was performed to develop the PMIS that is tailored to the US construction IT market. It has been monopolized by the US-based IT companies, but other companies are recently emerging with competitive technology and market strategy. As a preceding study, existing commercially available systems were analyzed, and the required features of the PMIS were identified by analyzing the core elements of contract, process and cost management about construction projects in the US. Then, the PMIS was developed based on the aforementioned analysis results. The system includes the document management module with an internal electronic approval system, the cost-plus-based automatic labor cost calculation module, and the progress management module to support the integrated project cost management. In addition, the functionality of the developed system was verified by experts about construction management in the US via questionnaire survey. The developed PMIS, in this study, is expected to be applied not only to the US construction IT market as a system specialized for the US construction industry, but also to other oversea markets in the future.

Web-based Distributed Lean Construction Information System;Introduction of Lean Construction Research Center (웹 기반 분산형 린건설 정보시스템 개발;연구단 소개)

  • Yoon, You-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.221-228
    • /
    • 2006
  • To reform and improve the productivity of construction industry, 1) it should be encouraged to improve the construction production process and 2) it is required to enhance reliability of construction information based on the systematic thinking process. To promote the information reliability created during construction production process, Lean Construction Research Center(LRC2) is developing a supporting system to improve processes of design/supply/construction phase, functioning to efficiently manage the information created at each phase and developing a web based construction information system that provides result management/decision making support/knowledge based information services.

  • PDF

Research on the Application of GIS-based Measures in the Advancement of the Construction Project Information System (건설사업정보시스템의 고도화를 위한 공간정보(GIS) 적용방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin
    • Smart Media Journal
    • /
    • v.4 no.4
    • /
    • pp.70-79
    • /
    • 2015
  • The Construction Project Information System(CPIS), an information system constructed as part of the Construction Continuous Acquisition & Life-cycle Support(CALS) of the Ministry of Land, Infrastructure, and Transport(MOLIT), is designed to digitize construction projects across all stages, and enable sharing of information so as to enhance the productivity and efficiency of construction projects and secure their transparent administration. One of MOLIT's internal work systems, CPIS focuses on work-handling and data management. However, now over 10 years old after its construction, it focuses on text and document-based construction project information, but it cannot be interfaced with the visualization-based GIS, which limits the sharing and dissemination of information and the determination of the overall construction project status. To resolve the existing CPIS limitations and problems and to upgrade the system, this study examined domestic and overseas GIS technology trends and relevant information systems, and analyzed the CPIS status and problems. It thus proposed total GIS application measures to upgrade CPIS. Also, it identified detailed CPIS utilization measures and GIS application measures by unit system, and analyzed considerations for GIS application.

New Concept of Construction Business Process Modeling Connected with Information Technology (IT와 연계된 건설분야 신개념 BPR 모형 구성)

  • Kwak Joong-Min;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.151-158
    • /
    • 2003
  • Recently, the off-line processes in the construction industry are being changed to the electronic processes by several information technology (IT) tools including CALS. To improve the business processes to on-line processes, the business process reengineering (BPR) is a representative methodology for reviewing unnecessary and additional processes from the established business procedure. This study suggests a new process modeling method for construction BPR (CBPR) that consists of object-related process model (ORPM). In suggested modeling method, the connection with IT tools such as Workflow, enterprise resource planning (ERP), construction CALS, and business breakdown structure (BBS) was considered. The ORPM in the study is the main model for representing the detailed construction processes. It consists of nine relationship and six diagrams to represent the relationship between construction activities and the direction within the process model. Those models suggested from this study can be a useful tool for the CBPR because the researches and the practical applications related to the BPR of construction project are insufficient in our construction industry.

  • PDF

A Study on the Establishment of IT Service Model for the Possibility of Application in Construction Field - Focused on the building facility - (건설분야에 적용가능한 IT 서비스 모델 구축방안 연구 - 빌딩시설물을 대상으로 -)

  • Lee, Woo-Sik;Hong, Chang-Hee
    • Spatial Information Research
    • /
    • v.19 no.6
    • /
    • pp.123-131
    • /
    • 2011
  • The object of this study is to build service model that combines developing IT technology with construction filed. It combines existing traditional construction project with high-tech IT choosingly, diverting construction project from labour-intensive to value-added technology-intensive industry. By doing so, it plans improving productivity and creation of new market. Now most ideal field of combining construction with IT technology is U-City industry that is being emphasized recently. Therefore, For this study, We analyze present condition of several IT technology used in construction and U-City project. Also, determining priority of promising IT technology for requirement analysis of consumer. And it proposes plan for construction of U-City service model through prospect and environment analysis of U-City and IT industry.

Development of BIM Utilization Level Evaluation Model in Construction Management Company (건설사업관리기업의 BIM 활용수준 평가 모형 개발)

  • Jeong, Seo-Hee;Kim, Gwang-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.4
    • /
    • pp.24-33
    • /
    • 2024
  • Recently, as smart construction has become more active, construction companys are evaluating their smart construction capabilities in order to transform into smart construction companies. However, the revitalization of smart construction doesn't only apply to construction companies, the level of utilization of all participants, including owners, designers, construction project managers, and construction company, must be improved. Therefore, this study aims to present a model that evaluate the building information modeling (BIM) utilization level for measuring the BIM utilization level of construction management companies in executing construction project management. In this study, an AHP questionnaire survey targeting BIM practitioners to calculate the weight of each BIM utilization item and score it to construct evaluation model and evaluate it by applying it to construction management companies are conducted. As a result of the evaluation using model, there were differences between companies in the number of BIM users, and in the qualitative evaluation, it is mainly used for interference review, constructability review, and design change management. Therefore, in order to revitalize BIM, it is believed that it is necessary to strengthen BIM utilization ability through separate training for construction manager (CMr) and to present clear utilization standards and scope of work for BIM utilization in performing construction management tasks. Consequently, evaluating more construction management companies using the model presented in this study will result in the transition of CM companies to smart construction and revitalization of BIM adoption.

A Study on BPR and Modeling for Ubiquitous-City Construction Projects - Focused on the application of the Ubiquitous-City Construction laws - (유비쿼터스도시건설사업 BPR 및 모델링 연구 - "유비쿼터스도시의 건설 등에 관한 법률" 적용을 중심으로 -)

  • Lee, Sung-Pyo;Shin, Yong-Jin
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2008.11a
    • /
    • pp.535-540
    • /
    • 2008
  • It is a fact that we are yet to recognize and sense the U-City even though the business of U-City construction has been started many years ago. One of the causes is that UCity was thoughtlessly developed in the industry-centered environment for a tangible achievement, despite of need on more systematic development and organized management. Fortunately, it is expected that the most part of the situation will be solved, since "laws on the construction of the ubiquitous city" for planning, construction and management has been promulgated on March, and U-City project will be systematically promoted by the related laws from now. Therefore, intention of this study is the sustainable development of the U-City by analyzing the previous process and problems of the U-City Construction project of local governments and reengineering U-City construction project process in accordance with new laws, using the BPR methodology.

  • PDF