• Title/Summary/Keyword: 건설 작업자

Search Result 416, Processing Time 0.026 seconds

A Study of the Effect of Organizational Climate on Workers' Safety Consciousness after the Enforcement of the Act on the Punishment of Severe Disasters - Focusing on Construction Site Workers - (중대재해처벌법 시행 이후 작업장의 조직풍토가 근로자의 안전의식 수준에 미치는 영향 - 건설현장 근로자를 중심으로 -)

  • Lee, Jaeyoon;Kim, Donghyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.1
    • /
    • pp.13-22
    • /
    • 2024
  • On January 8, 2021, the Act on the Punishment of Severe Disasters passed the Legislation and Judiciary Committee and has been in effect in earnest since January 2022. However, safety accidents at construction sites are still continuing, and it is necessary to discuss ways to improve the safety awareness of construction workers. Therefore, in this study, data were collected through a survey of construction site workers, and the effect of the organizational climate of the workplace on the level of safety consciousness of workers was studied. As a result of the study, the factors of organizational structure, guaranteeing autonomy and consideration of supervisors among the organizational climate of the workplace had a positive effect on the improvement of workers' safety awareness. Based on this, this researcher suggested that workers should be delegated the authority to perform some tasks according to the situation and content of the work during the field work and that incentives should be compensated according to performance.

An Analysis on the Influence of Work Management Type on Work Condition (작업관리방식이 작업여건에 미치는 영향 분석 - 주단위작업관리방식과 일단위작업관리방식을 중심으로 -)

  • Yoon, Byong-Sik;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.75-83
    • /
    • 2010
  • Construction industries is a labor intensive industries. According to Korea Productivity Center, most OECD members indicate high labor productivity more than Korea labor productivity in construction industries. First of all, for increasing labor productivity work efficiency and work condition should be managed by administrator in work site. Especially, work condition could be controlled by the management behaviors of administrator in work site such as work management type. This indicates that work management type could influence strongly work condition. But although that work management type could influence work condition is the characteristic of construction work is recongized to many people, the quantitative analysis on the relationship between work condition and work management type is not enough. Therefore the purpose of this study is to analyze the Influence of Work Management Type on Work Condition.

Development of Smart Safety Sensors to Prevent Falling and Contact Accidents at Construction Sites (건설현장의 추락 및 접촉사고 방지를 위한 스마트 세이프티 센서 개발)

  • Lee, Juhee;Ahn, Joseph
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.47-54
    • /
    • 2021
  • According to the Korea Occupational Safety and Health Agency's (KOSHA) report on industrial accident statistics over the past four years, the number of casualties at construction sites from 2017 to June 2020 was about 93,158 and the number of deaths was about 1,977, showing a high trend of safety accidents among the eight major occupational groups, with the construction industry ranking third in total and the death rate being the highest in total. Among them, the number of deaths caused by falls in the entire occupational category is about 1,267, the highest rate of deaths due to contact is about 522, which is a frequent safety accident among the top three accident types. This paper aims to help reduce the overall proportion of construction safety accidents by developing smart safety sensing devices using ultrasonic sensors to prevent two types of safety accidents, which have the highest rate of occurrence among various types of safety accidents occurring at construction sites.

Analysis of Safety Management Operations of Fire Risk Factors in Small-Scale Construction Sites (소규모 건설현장 화재 위험요인 안전관리 운영실태 분석)

  • Moon, Pil-Jae;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.6
    • /
    • pp.775-785
    • /
    • 2022
  • By analyzing the operation status of fire safety management of small construction site workers, deriving problems, and suggesting improvement measures, this study was conducted to present practical basic data for their efficient use in the future, and the following conclusions were drawn. First, it was analyzed that small construction site workers are elderly in the age group of construction workers, have short construction skills, most of the jobs are working in the construction industry, and the employment type is non-regular workers. Second, the fire safety management improvement plan of small construction site workers is systematized, fire safety manager is deployed to manage fire risk, fire escape routes and emergency warning facilities are provided to inform all workers at the construction site. In addition, measures to reduce industrial accidents are needed through realistic evacuation training, fire VR training, and interesting educational programs.

4D BIM based Workspace Planning Process in Building Construction Project (4D BIM 기반의 건설프로젝트 작업공간 계획 프로세스)

  • Choi, Byungjoo;Lee, Hyun-Soo;Park, Moonseo;Kim, Hyunsoo;Hwang, Sungjoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.175-187
    • /
    • 2013
  • Each participant in building construction project requires their own workspace to execute their activities. In this environment, inappropriate workspace planning in construction site causes workspace conflicts which result in a loss of productivity, safety hazard and poor-quality issues. Therefore, workspace should be regarded as one of the most important resources and constraints have to be managed at construction site. However, current construction planning techniques such as Gantt chart, network diagram and critical path method have proven to be insufficient to workspace planning. This paper contains formalized process for workspace planning in 4D BIM environment to prevent workspace related problems in construction project. The proposed process in this paper represents workspace occupation status for each activity and suitable solutions for identified workspace conflicts by integrating workspace attributes and activity execution plan. Based on the result of this study, project manager will be able to prevent probable workspace conflicts and negative effect on project performance by devising appropriate workspace plan during preconstruction phase.

An Application of PDA and Barcode Technology for the Improvement of Information Management in Construction Projects (건설프로젝트 정보관리 효율화를 위한 PDA 및 Barcode 적용기술 개발)

  • Oh Se-Wook;Kim Young-Suk;Lee Jun-Bok;Kim Han-Soo;Sung Nak-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.553-558
    • /
    • 2003
  • The information of works performed by labors can be used for analyzing project status related to schedule, cost and productivity, etc. The purpose of this research is to develop a computer-based system by the application of PDA and barcode technology in order to measue and monitor the amount of workforce resources, works done and productivity. It is anticipated that the effective use of the devepoped system would be able to effectively assist the schedule planning and management for present and prospective construction projects.

  • PDF

건설현장의 리프트 탑승장 출입문 이용자 안전지침 개발

  • 최순주
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2003.05a
    • /
    • pp.327-332
    • /
    • 2003
  • 고층빌딩공사에서 설치·사용하는 리프트는 근로자의 수직이동과 건설자재의 수직운반에 이용하는 편리한 건설장비이다. 리프트를 이용하는 근로자들은 리프트 탑승 대기장 및 그 주변작업에 투입되는 근로자는 탑승을 위한 리프트의 호출, 주변작업, 탑승을 위한 대기과정에서 추락·협착·충돌 등의 재해가 발생할 위험성이 잠재하고 있으며, 실제 많은 재해가 발생하고 있어 동종재해를 방지할 필요가 있다. 그러나, 본 연구에서는 리프트의 기계적 장치나 전기적 장치에 의한 연동설비는 제외한다.(중략)

  • PDF

Development on Identification Algorithm of Risk Situation around Construction Vehicle using YOLO-v3 (YOLO-v3을 활용한 건설 장비 주변 위험 상황 인지 알고리즘 개발)

  • Shim, Seungbo;Choi, Sang-Il
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.7
    • /
    • pp.622-629
    • /
    • 2019
  • Recently, the government is taking new approaches to change the fact that the accident rate and accident death rate of the construction industry account for a high percentage of the whole industry. Especially, it is investing heavily in the development of construction technology that is fused with ICT technology in line with the current trend of the 4th Industrial Revolution. In order to cope with this situation, this paper proposed a concept to recognize and share the work situation information between the construction machine driver and the surrounding worker to enhance the safety in the place where construction machines are operated. In order to realize the part of the concept, we applied image processing technology using camera based on artificial intelligence to earth-moving work. Especially, we implemented an algorithm that can recognize the surrounding worker's circumstance and identify the risk situation through the experiment using the compaction equipment. and image processing algorithm based on YOLO-v3. This algorithm processes 15.06 frames per second in video and can recognize danger situation around construction machine with accuracy of 90.48%. We will contribute to the prevention of safety accidents at the construction site by utilizing this technology in the future.

Scholarly Assessment of Aruco Marker-Driven Worker Localization Techniques within Construction Environments (Aruco marker 기반 건설 현장 작업자 위치 파악 적용성 분석)

  • Choi, Tae-Hun;Kim, Do-Kuen;Jang, Se-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.629-638
    • /
    • 2023
  • This study introduces an innovative approach to monitor the whereabouts of workers within indoor construction settings. While traditional modalities such as GPS and NTRIP have demonstrated efficacy for outdoor localizations, their precision dwindles in indoor environments. In response, this research advocates for the adoption of Aruco markers. Leveraging computer vision technology, these markers facilitate the quantification of the distance between a worker and the marker, subsequently pinpointing the worker's instantaneous location with heightened accuracy. The methodology's efficacy was rigorously evaluated in a real-world construction scenario. Parameters including system stability, the influence of lighting conditions, the extremity of measurable distances, and the breadth of recognition angles were methodically appraised. System stability was ascertained by maneuvering the camera at a uniform velocity, gauging its marker recognition prowess. The impact of varying luminosity on marker discernibility was scrutinized by modulating the ambient lighting. Furthermore, the camera's spatial movement ascertained both the upper threshold of distance until marker recognition waned and the maximal angle at which markers remained discernible.